HomeMy WebLinkAboutSR_HEX_Talbot_Hill_Substation_170214DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT A. REPORT TO THE HEARING EXAMINER HEARING DATE: February 14, 2017 -------Renton 0 Project Nome: Talbot Hill Substation Improvements Owner: Puget Sound Energy, Inc.; PO Box 97034 M/S PSE-09N, Bellevue, WA 98009 Applicant/Contact: Kerry Kriner; PO Box 97034 M/S PSE-09N, Bellevue, WA 98009 File Number: LUA16-000922, ECF, SA-H, CUP-H Project Manager: Angelea Weihs, Associate Planner Project Summary: Puget Sound Energy (PSE) is requesting Hearing Examiner Conditional Use Permit, Environmental (SEPA) Review, and Site Plan Review for proposed Talbot Hill Substation improvements located at 2400 S Puget Dr. (parcel numbers 2023059003 and 2023059066). The project site totals 50.4 acres and is zoned Residential-8 (R-8). PSE is proposing to rebuild a portion of the Talbot Hill Substation in order to replace aging equipment and provide more reliability for the transmission lines connected to the substation. The existing control house (999 square feet) will be demolished and a new control house (1,449 square feet) is proposed in its place. The existing 230kV substation equipment inside the fence is proposed to be removed, including steel structures and foundations. No additional transmission lines are proposed with the rebuild of this project. A new storm drainage system is proposed within the fenced area and a detention pond will be installed south of the southerly substation fence. The detention pond will involve an excavation of more than 500 cubic yards. The substation footprint will remain unchanged. Access to the site is provided via an existing access driveway extending through parcel number 2023059064 to the south from Puget Drive Southeast. Additional driveway improvements are proposed to allow larger vehicle access to the substation. The applicant proposes to construct the project in two phases. Phase one includes the civil portions of the project and is proposed for April 2017 to October 2017. Phase two includes assembly of the electrical equipment and is proposed for April 2018 to October 2018. The project site contains moderate coalmine hazards, moderate landslide hazards, and sensitive slopes (within 50 feet). The applicant has submitted an Arborist Report and Geotechnical Engineering Study with the application. Project Location: 2400 S Puget Drive Site Area: 50.4 acres Project Location Mop HEX Report_WA16-000922 To/bot Hill Substation final version City of Renton Deportment of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Report of February 14, 2017 I 8. EXHIBITS: Exhibits 1-10: As shown in the SEPA Environmental Review Report Exhibit 11: HEX Staff Recommendation Exhibit 12: SEPA Determination of Non-Significance Exhibit 13: Aerial Photos Exhibit 14: Control House Building Elevations Exhibit 15: Public/Agency Comments and Staff Response Exhibit 16: Project Narrative and Conditional Use Permit Justification I C. GENERAL INFORMATION: 1-Owner(s) of Record: 2. Zoning Classification: Puget Sound Energy, Inc. PO Box 97034 M/S PSE-09N Bellevue, WA 98009 Residential-8 (R-8) Page 2 of 17 3. Comprehensive Plan Land Use Designation: 4. Existing Site Use: Residential Medium Density (MD) Public Utility S. Critical Areas: Moderate coal mine hazards, moderate landslide hazards, and sensitive slopes 6. Neighborhood Characteristics: a. North: Single family residential, R-8 zone b. East: Single family residential, R-8 zone c. South: Single family residential, R-8 zone d. West: Residential Multi-Family, R-8 and RMF zone 6. Site Area: 50.4 acres I D. HISTORICAL/BACKGROUND: Action Comprehensive Plan Zoning Annexation I E. PUBLIC SERVICES: 1. Existing Utilities Land Use File No. N/A N/A N/A Ordinance No. 5758 5758 1871 Date 06/22/2015 06/22/2015 03/08/1961 a. Water: No water service is proposed or required for the redevelopment project. b. Sewer: No sewer service is proposed or required for the redevelopment project. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Report of February 14, 2017 nearing Examiner Recommendation LUA16-000922, ECF, SA-H Page 3 of 17 c. Surface/Storm Water: Runoff from the site sheet flows outward from the middle of the substation. There are existing drainage pipes on the northeast and southeast side of the substation which are tied to catch basins within the fence line. The rims of the catch basins are currently at an elevation higher than the surrounding ground, which prevents them from capturing stormwater. Grade differences between the substation slab and the surrounding ground surface along the north and northeast sides of the substation prevent stormwater from draining away from the substation, which tends to pond within the substation footprint. Runoff along the southern edge of the substation flows into a culvert located beneath the access road which ultimately flows east towards Grant Avenue South. 2. Streets: The site is bordered by Beacon Way South to the northeast. Beacon Way South is classified as a Residential Access Road and is located within the City of Seattle Cedar River Pipeline Easement. Access to the site is provided via an access driveway extending through parcel number 2023059064 to the south from Puget Drive Southeast. Puget Drive Southeast is classified as a Minor Arterial Street. Existing right of way in Puget Drive Southeast is approximately 100 feet as measured using the King County Assessor's Map. There are no existing frontage improvements along Puget Drive Southeast. 3. Fire Protection: Renton Fire Authority F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-060: Zoning Use Table -Uses Allowed in Zoning Designations c. Section 4-2-110: Residential Development Standards 2. Chapter 3 Environmental Regulations a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 City-Wide Property Development Standards 4. Chapter 6 Streets and Utility Standards a. Section 4-6-060: Street Standards 5. Chapter 9 Permits -Specific a. Section 4-9-030: Conditional Use Permits b. Section 4-9-070: Environmental Review Procedures c. Section 4-9-200: Master Plan and Site Plan Review 6. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element 2. Utilities Element I H. FINDINGS OF FACT {FOF}: 1. The Planning Division of the City of Renton accepted the above master application for review on December 6, 2016, and determined the application complete on December 22, 2016. The project complies with the 120-day review period. 2. The project site is located at 2400 S Puget Dr. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Report of February 14, 2017 Hearing Examiner Recommendation WA16-000911, ECF, SA-H Page 4 of 17 3. The project site is currently developed with an existing 230-kV electrical substation. 4. Access to the site would be provided via an existing driveway extending from Puget Drive SE (through parcel number 2023059064 to the south of the substation site). 5. The property is located within the Residential Medium Density (MD) Comprehensive Plan land use designation. 6. The site is located within the Residential-8 (R-8) zoning classification. 7. There are approximately 116 trees located within the project area of which the applicant is proposing to remove a total of 80 trees. 8. The site is mapped with moderate coalmine hazards, moderate landslide hazards, and sensitive slopes (within 50 feet). 9. Approximately 11,500 cubic yards of material would be cut on site and approximately 9,000 cubic yards of fill is proposed to be brought into the site. 10. The applicant proposes to construct the project in two phases. Phase one includes the civil portions of the job and is proposed for April 2017 to October 2017. Phase two includes assembly of the electrical equipment and is proposed for April 2018 to October 2018. 11. Staff received one Public/Agency comment letter (Exhibit 15). To address public comments the following report contains analysis related to access. 12. No other public or agency comments were received. 13. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on January 23, 2017 the Environmental Review Committee issued a Determination of Non-Significance - Mitigated (DNS-M) for the Talbot Hill Substation Improvements (Exhibit 12). The DNS-M included one mitigation measure. A 14-day appeal period commenced on January 27, 2017 and ended on February 10, 2017. No appeals of the threshold determination have been filed as of the date of this report. 14. Based on an analysis of probable impacts from the proposal, the Environmental Review Committee (ERC) issued the following mitigation measures with the Determination of Non-Significance -Mitigated: 1. The applicant shall submit a revised Geotechnical report, updated to the 2015 IBC design parameters, with construction and building permit application, and the project shall follow the recommendations of the revised Geotechnical report. 15. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. The subject proposal is being reviewed independently and separately from all other proposals, including Energize Eastside (the proposal to build new electrical transmission infrastructure), that include this site. 16. Comprehensive Plan Compliance: The site is designated Residential Medium Density (MD) on the City's Comprehensive Plan Map. The purpose of the MD designation is to allow a variety of single-family and multi-family development types, with continuity created through the application of design guidelines, the organization of roadways, sidewalks, public spaces, and the placement of community gathering places and civic amenities. The proposal is compliant with the following development standards if i!!.! conditions of approval are met: I Compliance I Comprehensive Plan Analysis I HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTA T/ON IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Report of February 14, 2017 Page 5 of 17 Policy L-29: Minimize erosion and sedimentation in and near sensitive areas by requiring ., appropriate construction techniques and resource practices, such as low impact development. Policy L-30: Protect the integrity of natural drainage systems, existing land forms, and ., maintain wildlife habitat values by preserving and enhancing existing vegetation and tree canopy coverage to the maximum extent possible and by restoring hydrological flows and improving the condition of shorelines. Policy L-33: Emphasize the use of open ponding and detention, vegetated swales, rain ., gardens, clean roof run-off, right-of-way landscape strips, open space, and stormwater management techniques that mimic natural systems, maximize water quality and infiltration where appropriate, and which will not endanger groundwater quality. Policy L-37: Land uses in areas subject to flooding, seismic, geologic, and coal mine ., hazards should be designed to prevent property damage and environmental degradation before, during, and after construction. ., Policy U-73: Encourage electricity purveyors to make facility improvements and additions within existing utility corridors wherever possible. ' ., Policy U-2: Protect the health and safety of Renton citizens from environmental hazards associated with utility systems through the proper design and siting of utility facilities. Goal U-0: Promote the availability of safe, adequate, and efficient electrical service ., within the City and its planning area, consistent with the regulatory obligation of the utility to serve customers. ., Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new development is designed to be functional and attractive. 17. Zoning Development Standard Compliance: The site is classified Residential-8 (R-8) on the City's Zoning Map. Development in the R-8 Zone is intended to create opportunities for new single family residential neighborhoods and to facilitate high-quality infill development that promotes reinvestment in existing single family neighborhoods. It is intended to accommodate uses that are compatible with and support a high-quality residential environment and add to a sense of community. The proposed expansion of the Public Utility use requires a Conditional Use Permit in order to be allowed in the R-8 Zone. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance R-8 zone Develop Standards and Analysis Density: The allowed density range in the R-8 zone is a minimum of 4.0 to a maximum of 8.0 dwelling units per net acre. Net density is calculated after the deduction of N/A sensitive areas, areas intended for public right-of-way, and private access easements. Stat[_ Comment: Not opp/icoble, no residential dwelling units are proposed. Lot Dimensions: The minimum lot size permitted in the R-8 zone is 5,000 sq. ft. A minimum lot width of 50 feet is required (60 feet for corner lots) and a minimum lot depth of 80 feet is required . ., Stotf. Comment: The existing parcels (parcel numbers 2023059003 and 2023059066} hove lot oreas of 583,864 square feet and 1,611,720 square feet, respectively. Poree/ 2023059003 exceeds o width of 1,332 feet ond a depth of 1,299 feet. Poree/ 2023059066 exceeds a width of 980 feet and a depth of 1,070 feet. Both lots exceed the minimum lot HEX Report_WA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Report of February 14, 2017 Page 6 of 17 Compliant if condition of approval is met size, width, and depth requirements of the R-8 zone. No changes to the lots size, width, or depth are proposed. Setbacks: The required setbacks in the R-8 zone are as follows: front yard is 20 feet, side yard is 5 feet, side yard along the street 15 feet, and the rear yard is 20 feet. Staff Comment: The proposed new control house (Parcel 2023059003) would maintain a front yard setback of 257. 79 feet; side yard setbacks of 53.5 feet/ram the east property line and 1239.5 feet from the west property line; and a rear yard setback of 878 feet. The prapased new control house would exceed all the minimum required setback areas. Building Standards: The R-8 zone has a maximum building coverage of 50%, a maximum impervious surface coverage of 65%, and a maximum building height of 2 stories with a wall plate height of 24 feet. Nonresidential accessory structures are restricted to a maximum wall plate height of 12 feet. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum wall plate height. Staff Comment: Building elevations for the new control house (Exhibit 14) were submitted with the project application. The existing control house (999 square feet) would be demolished and a new control house (1,449 square feet) would be constructed in its place. The submitted elevations show that the new control house would have 1 story, with a maximum wall plate height of 11', and a maximum overall height of 19'4". Staff approves a maximum overall building height of 19'4" feet far the proposed control house. The proposed building footprint is 1,449 square feet. The proposed impervious surface is 78,100 square feet. The proposal would result in a building coverage of less than 1 percent for parcel number 2023059066, and an impervious surface coverage of approximately 3.5 percent of bath lots. The proposed improvements would comply with the building and impervious surface coverage requirements for the R-8 zone. Landscaping: The City's landscape regulations (RMC 4-4-070) require that all portions of the development area not covered by structures, required parking, access, circulation or service areas, be landscaped with native, drought-resistant vegetative cover. The perimeter of all new flow control and/or water quality treatment stormwater facilities shall be landscaped in accordance with the provisions of RMC 4-4-070 and the Surface Water Design Manual. A landscaping strip with a minimum fifteen feet (15') of width shall be located on the outside of the fence. Plantings shall be consistent with the Surface Water Design Manual and RMC 4-4-070. Additionally, trees must be spaced as determined by the Department of Community and Economic Development. Trees and shrubs are prohibited on any berm serving a drainage-related function, within the fenced area of the drainage facility, and within ten feet (10') of any manmade drainage structure (e.g., catch basins, ditches, pipes, vaults, etc.); however, groundcover is required and subject to City review and approval. Staff Comment: A tree removal and landscape plan (Exhibit 4) was submitted with the project application. The proposed new stormwater detention pond would be located along the southeastern edge of the substation. As an alternative to the required fifteen feet of landscaping around the stormwater pond perimeter, the applicant proposes landscape screening southwest of the stormwater pond, immediately south of the existing access driveway, and to the west of the starmwater pond outside of the perimeter fence. The purpose of this proposed screening is to fill in gaps of existing HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation WA16-0009ZZ, ECF, SA-H Report of February 14, 2017 Page 7 of 17 Compliant if condition of approval is met natural vegetation screening that occurs between the substance and the nearest residential homes approximately 460 feet to the south. The proposed landscaping will replace non-native plant cover such as blackberry shrubs and non-native grasses. The propased sight-obscuring landscaped visual buffer is proposed to be 20 feet in width in the two locations and contain a mixture of trees ond large shrubs, some of which will mature to 35 feet tall. The visual buffer plantings include Vine Maple, Western Serviceberry, Beaked Hazelnut, California Wax Myrtle, Silk Tassel and Strawberry Trees planted at 6 feet triangular on-center spacing. The Vine Maple and Western Serviceberry are proposed to be 6 feet tall and the ather plants are ta be 5-gallon containerized plantings at the time of installation. The visual buffer planting is 50% evergreen species to maximize the screening provided by the planting while also providing some voriation to improve ecological services as well as aesthetics. Per aerial phatos /Exhibit 13), existing tree canopy/vegetation screening between the substation and residential uses to the south blocks views from the southeast and southwest of the site, however the applicant proposes to remove a total of 11 trees south of the substation and to the west of the access driveway. Per the submitted tree removal and landscape plan, na additional replanting is proposed in this location. Removal of trees in this location would reduce the visual barrier between the substation and the residential uses to the south. Therefore, staff recommends as a condition af approval that, if these 11 trees to the west of the access driveway are removed, a revised tree replacement/visual barrier plan shall be submitted at the time of Construction Permit application for review and approval by the Current Planning Project Manager. Tree Retention: The City's adopted Tree Retention and Land Clearing Regulations (RMC4-4-130) require the retention of 30 percent of trees in a residential development. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); Significant trees adjacent to critical areas and their associated buffers; and Significant trees over sixty feet (60') in height or greater than eighteen inches (18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and Other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. Staff Comment: An Arborist Report prepared by Otak Inc., dated December 13, 2016 /Exhibit 8), was submitted with the Land Use application, in addition to a Stormwater Pond Tree Removal and Landscaping Plan /Exhibit 4). A total of 116 trees were evaluated as a part of this proposal. The existing trees on the project site include Douglas fir, Pacific dogwood, Big leaf maple, Madrone, Alder, Willow, Hawthorn, Beaked Hazelnut, and Cottonwood. Per the Arborist Report, the majority of the trees are in goad shape with the exception of the willow and alder, which hove been damaged by recent branch failures during the spring windstorms. The Arborist Report states that the grading of the stormwater pond would require removal of significant trees. A total of 69 trees are proposed for removal within the stormwater pond area per the submitted tree removal plan. The applicant proposes to remove an additional 11 significant /Douglas fir) trees HEX Report_WA16-000922 Talbot Hill Substation final version City of Renton Deportment of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA·H Report of February 14, 2017 Page 8 of 17 to the west of the entrance driveway along the south side of the substation (for a total of 80 trees removed). The report states that the majority of these trees are reaching a height in which their risk toward the substation is enhanced due to the prevalence af windblown limbs damaging equipment within the substation. The existing shrubs and smaller trees in this area are proposed to remain as a view buffer for the southern neighbors. No alternatives to tree removal for the 11 Douglas firs was provided within the Arborist Report. The report did not provide explanation as to why the Douglas fir trees could not be pruned or trimmed as an alternative in order to prevent damage to the equipment within the substation, rather than tree removal. Therefore, staff recommends as a condition of approval that a revised Arborist Report be submitted with Construction Permit application for review and approval by the Current Planning Project Manager. The revised Arborist Report shall provide further detailed explanation as to why no reasonable alternative to tree removal is possible and shall provide suggested locations and species of supplemental trees to be planted if the 11 trees cannot be retained. The report shall include planting and maintenance specifications for replacement trees. A total of 36 of the existing 116 trees (31 percent) are proposed to be retained. The proposal complies with the minimum 30 percent tree retention requirement. Parking: Vehicle traffic to and from the existing substation use include routine inspections and operations approximately once per week. The substation site provides ample on-site paved space to accommodate parking for inspection/maintenance vehicles. 18. Design Standards: Residential Design and Open Space Standards (RMC 4-2-115) are applicable in the R· 8 zone to new residential dwelling units. The proposal does not include any residential dwelling units; therefore the residential design and open space standards are not applicable. 19. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations, if all conditions of approval are complied with: Compliant if condition of approval is met Geologically Hazardous Areas: Based upon the results of a geotechnical report and/or independent review, conditions of approval for developments may include buffers and/or setbacks from buffers. A standard 15-foot building setback is required for all structures from Protected Slope areas. A SO-foot buffer and 15-foot building setback are required from Very High Landslide Hazard Areas. Staff Comment: A geotechnical report (Exhibit 6), dated December 5, 2016, completed by GeoEngineers, Inc. was submitted with the application. The project site contains moderate coalmine hazards, moderate landslide hazards and sensitive slopes (within 50 feet). Erosion control measures would need to be in place prior to starting grading activities on the site. The report discusses the soil and groundwater characteristics of the site including infiltration potential and provides recommendations for project design and construction. The report discounts the use af infiltration for the site due to the depth of the outwash soils compared to the existing surface elevations present on the site. Geotechnical recommendations presented would need to be addressed within the project plans and construction/building permit submittal. According to the report, the soils mapped in the project vicinity are predominantly glacial till, but include localized areas of ice-contact glacial deposits overlying the till. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Deportment of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Report of February 14, 2017 Page 9 of 17 The extent of disturbance for the proposal would be approximately 5.89 acres. The cut will be approximately 11,500 cubic yards and the fill will be approximately 9,000 cubic yards. Approximately 4.17 acres would consist of gravel road and surface improvements. Another 1.22 acres would be for the installation of new foundations and Spill Prevention, Contra/, and Countermeasures /SPCC} structures. The remaining 0.5 acres will be for installation of a stormwater detention pond. The report states that the site is mapped in a moderate cool mine hazard area; however, based on the depth of historical coal mining activity and the relatively shallow depth of the proposed improvements, there is a low coal mine hazard at the site. The report identifies that the site is mapped in a 25 to 40 percent steep slope area and in a moderate landslide hazard area; however, the geotechnical engineer has concluded that the proposed improvements would not adversely affect the stability of the slopes in or around the site. Based on the provided report, the soils underlying the substation site have a low risk of liquefying under the design earthquake event and a low risk of lateral spread and earthquake-induced slope movement. The site is approximately 5 miles south of the Seattle Fault Zone, which is thought to hove a recurrence interval on the order of 1,000 years. Based on the distance from the nearest mapped fault, there is a low risk offqult rupture at the site. ' I 20. Conditional Use Analysis: The Talbot Hill Substation was constructed in the early 1960s and is a legally established use. A Conditional Use Permit was not required at the time of construction; however, due to the upgrades of the facility (enlargement of control house) a new Conditional Use Permit has been triggered. The proposal is compliant with the following conditional use criteria, pursuant to RMC 4-9-030. Therefore, staff recommends approval with conditions of the requested Conditional Use Permit. Compliance Conditional Use Criteria and Analysis a. Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the ., Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. Staff Comment: See FOF 16 for Comprehensive Plan and zoning regulation compliance. b. Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. Staff Comment: The proposed location of the control house will not result in detrimental overconcentrotion of a particular use within the City or within the ., immediate area. The proposed control house will replace an existing control house within the substation fence. The area within the substation fence is approximately 336,565 square feet /7.7 acres). The total site is 50.4 acres. The substation footprint would remain unchanged. The increased building square footage is minor compared to the scale of the substation footprint. The new contra/ house will be located adjacent to the existing structure used for a control house and will not be substantially larger in size. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-0009ZZ, ECF, SA-H Report of February 14, 2017 Page 10 of 17 c. Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. Staff Comment: The proposed 1,449 square foot control house will replace an existing 999 square foot control house adjacent to the current structure location, within the existing substation fence. Both the existing and proposed control house are single story. The maximum overall height of the new proposed control house is 19'4n. The substation is located within o SO-acre site that contains several high-voltage transmission lines. The substation is located over 460 feet from the nearest residential Jot, resulting in no substantial impact to neighboring properties. The proposed control house will not result in substantial ar undue adverse effects an adjacent property. d. Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. Staff Comment: To/bot Substation is an existing substation that was constructed in the early 1960's. The existing 999 square foot, single-story control house within the substation fence would be replaced with a new 1,449 square foot, single-story structure. The maximum overall height of the new proposed control house is 19'4n. The substation is over 460 feet from the nearest residential lot and completely surrounded by transmission corridors. The proposal includes existing and proposed vegetation screening, which will restrict views of the substation and contra/ house to the surrounding neighborhood. The proposed control house is part of the same use that has been on the site for more than 50 years. The proposed use is compatible with the scale and character of the neighborhood. e. Parking: Adequate parking is, or will be made, available. Staff Comment: See parking discussion under FOF 17, Zoning Development Standard Compliance: Parking. f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. Staff Comment: The Ta/bat Hill substation property is accessed via an existing access driveway extending from Puget Drive SE (See the attached site plan and proposed access improvements). As part of the project, the applicant is proposing improvements to the existing access driveway that includes repaving with asphalt, widening of the approach apron, and a security gate. The access driveway would remain in its current location. The project would not generate a significant number of vehicle trips during construction or operation. Daily trips during construction will likely include delivery of materials and commuting of the construction crew. No additional trips would be required during operation of the substation, except for routine inspections and operation, which would be approximately once per week. The proposed control house will not result in increased traffic to and from the substation site. Impacts to the surrounding area are nat anticipated. g. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. Staff Comment: The proposed control house will have minimal lighting ta provide for safe entry and exit into and out of the building. The lighting will be directed downward and not directed offsite. As stated above, the substation is over 460 HEX Report_LUA16-000922 Talbot Hiff Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Report of February 14, 2017 Page 11 of 17 feet from the nearest residential lot and completely surrounded by transmission corridors. Therefore, any noise generated by the proposed control house and substation is anticipated to be absorbed by the surraunding corridars. Light, glare or noise volumes would not result in an impact to the surrounding neighbarhood. h. Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to Compliant if buffer adjacent properties from potentially adverse effects of the proposed condition of use. approval is met Staff Comment: See discussion under FOF 17, Zoning Development Standard: Landscaping. 21. Site Plan Review: Pursuant to RMC 4-4-70F.8, Site Plan Review is required for the proposal in order to deviate from storm drainage facility landscaping standards. Given Site Plan applications are evaluated for compliance with the specific requirements of the RMC 4-9-200.E.3 the following table contains project elements intended to comply with level of detail needed for both the Master and Site Plan requests: Compliance Site Plan Criteria and Analysis Compliant if a. Comprehensive Plan Compliance and consistency. Conditions of Staff Comment: See previous discussion under FOF 16, Comprehensive Plan Approval are Met Analysis. Compliant if b. Zoning Compliance and Consistency. Conditions of Staff Comment: See discussion under FOF 17, Zoning Development Standard Approval are Met Compliance. c. Design Regulation Compliance and Consistency. N/A Staff Comment: Residential design and open space standards are not applicable (See discussion under FOF 18, Design Standards). N/A d. Planned action ordinance and Development agreement Compliance and Consistency_ e. Off Site Impacts. Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Staff Comment: See scale and averconcentration discussion under FOF 20, Conditional Use Analysis: Appropriate Location. Circulation: Providing desirable transitions and linkages between ,/ uses, streets, walkways and adjacent properties. Staff Comment: The existing access driveway extending from extending from Puget drive SE would provide the required circulotion between the development and the adjacent praperties. Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. HEX Report_WA16-000922 Talbot Hill Substation final version City of Renton Deportment of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation WA16-000911, ECF, SA-H Report of February 14, 2017 Page 12 of17 Staff Comment: The overall development (public utility) would be screened via the proposed landscaping identified in FOF 17, Zoning Development Standard: Landscaping. No loading areas or refuse and recyclable areas are proposed for the site. Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. Staff Comment: The landscape of the areas is relatively flat with large trees and heavy vegetation restricting visibility from the site. The nearest residential uses are more than 460 feet from the substation. Therefore, the proposed height of the structure/improvements are appropriate for this situation. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. Staff Comment: See discussion under FOF 17, Zoning Development Standard: Landscaping. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. Staff Comment: A lighting plan was not provided with the application; therefore staff recommended that a lighting plan be provided at the time of building permit review (See Lighting discussion under FOF 20, Conditional Use Permit Analysis: Noise, Light, and Glare). f. On Site Impacts. Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation. Staff Comment: See compatibility discussion under FOF 20, Conditional Use Analysis: Compatibility, and Noise discussion under FOF 20, Conditional Use Analysis: Noise, Light, and Glare. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, Compliant sunlight, prevailing winds, and pedestrian and vehicle needs. if condition Staff Comment: The proposed new control house will have a maximum of approval building height of 19'4", with a 4:12 roof pitch. The nearest residential is met uses ore more than 460 feet from the substation, with existing and proposed vegetation restricting visibility from the site. The proposed control house will not result in substantial or undue adverse effects on adjacent property. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. Staff Comment: See discussions under FOF 17, Zoning Development Standard: Tree Retention and Building Standards. HEX Report_WA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LU Al 6-000922, ECF, SA-H Report of February 14, 2017 Page 13 of 17 Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. Staff Comment: See FOF 17, Zoning Development Standard: Landscaping. g. Access Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Staff Comment: The proposed development is expected to utilize the existing access driveway extending from Puget Drive SE for ingress and egress to the plot. The proposed development is expected to maintain the safety and efficiency of vehicle circulation on the site if all conditions of approvol ore complied with. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. Staff Comment: Vehicle traffic to and from the existing substation use include routine inspections and operations approximately once per week. The substation site provides ample paved space to occommodate parking for inspection/maintenonce vehicles and for ,/ internal vehicle circulation on the substotion site. Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Staff Comment: There are no dedicated loading or delivery areas proposed on site. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Staff Comment: Per RMC 4-4-0BOF.11.a, Bicycle parking is required for all residential developments that exceed five (5) residential units and/or all non-residential developments that exceed four thousand (4,000) gross square feet in size. The proposed control house is not residential and does not exceed 4,000 gross square feet, therefore bicycle parking is not required. See discussions on traffic and access under FOF 20, Conditional Use Analysis: Traffic. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. Staff Comment: The proposed use will not increase pedestrian traffic on or near the site. Access to the site is provided via an existing access HEX Report_LUA16-000922 To/bot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LU Al 6-000922, ECF, SA-H Report of February 14, 2017 Page 14 of 17 driveway extending through parcel number 2023059064 to the south from Puget Drive Southeast. Puget Drive Southeast is classified as a Minor Arterial Street. There ore no existing frontage improvements along Puget Drive Southeast. See FOF 21, Site Plan Review: Tronsportation, for more details. h. Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active ./ recreation by the occupants/users of the site . Staff Comment: The residential design and open space standards are not applicable for this development. i. Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines ./ Staff Comment: The proposed structure would not block view corridors to shorelines or Mt. Rainier. The public access requirement is not applicable ta the proposal. j. Natural Systems: Arranging project elements to protect existing natural systems where applicable . ./ Staff Comment: There are na natural systems located on site with the exception of drainage flows. See Drainage discussion under FOF 21, Site Plan Review: Drainage. k. Services and Infrastructure: Making available public services and facilities to accommodate the proposed use: Police and Fire. Staff Comment: Police and Renton Fire Authority staff indicates that sufficient resources exist to furnish services to the proposed development. No fire impact fees are applicable for this project. Water and Sewer. Staff Comment: No water or sewer service is proposed or required for the redevelopment project. Drainage. ./ Staff Comment: A Preliminary Drainage Plan and Technical Information Report (TIR) (Exhibit 7), dated November 16, 2016, was submitted by HDR Engineering, Inc. with the land Use Application. Based on the City of Ren ton's flow control map, the site/alls within the Flow Control Duration Standard area matching Forested Site Conditions and is within the Lower Cedar River and Black River Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2009 King County Surface Water Design Manual (KCSWDM} and the 2010 City of Renton Amendments to the KCSWDM. All core requirements and the six special requirements are discussed in the Technical Information Report. As stated in the TIR, the proposed improvements would occur on the eastern side of the substation (referred to as the project area), and would include the installation of foundations, security perimeter HEX Report_WA16-000922 Ta/bat Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation LUA16--0009ZZ, ECF, SA-H Report of February 14, 2017 I. Page 15 of 17 fence, landscape screening, paving of a small portion of the access road, installation of a new stormwater drainage and flow control system, stormwater detention pond, road maintenance, and on-site oil spill control best management practices (BMPs). Drainage improvements include a new stormwater conveyance network inside the substation which would route flows ta a 75,000 cubic foot storm water detention pond located along the southeastern edge of the substation. This pond would discharge to a depression on the southern side of the existing access road, where flow would resume the existing drainage path towards Grant Avenue South. As noted in the report, the applicant is exempt from water quality since the new plus replaced pollution generating impervious surface (PG/5) area is less than 5,000 square feet. Any changes to the redevelopment project which results in greater than 5,000 square feet of PGIS area, as defined by the 2009 KCSWDM, may trigger water quality facilities to be provided. Transportation. Staff Comment: The site is bordered by Beacon Way South to the northeast. Beacon Way South is classified as a Residential Access Road and is located within the City of Seattle Cedar River Pipeline Easement. Access to the site is provided via an existing access driveway extending through parcel number 2023059064 to the south from Puget Drive Southeast. Puget Drive Southeast is classified as a Minor Arterial Street. Existing right of way in Puget Drive Southeast is approximately 100 feet as measured using the King County Assessor's Map. There are no existing frontage improvements along Puget Drive Southeast. Per RMC 4-6-060, required half street frontage improvements shall include 54 feet of paved roadway width (27 feet from centerline), installation of a 0.5 foot curb, an 8 foot planting strip, an 8 foot sidewalk, street trees and storm drainage improvements. No right of way dedication is required. The applicant may submit an application to the City requesting a modification of the street frontage improvements as outlined in RMC 4-9-250C.5.d. The applicant did not submit frontage improvement plans or a modification request with the project application. No transportation impact fees are applicable for this project. Phasing: Staff Comment: The applicant proposes to construct the project in two phases. Phase one includes the civil portions of the proposed project (including the stormwater pond, driveway access improvements, and control house} and is proposed for April 2017 to October 2017. Phase two includes assembly of the electrical equipment and is proposed far April 2018 to October 2018. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Hearing Examiner Recommendation WA16-000922, ECF, SA-H Report of February 14, 2017 Page 16 of 17 22. Availability and Impact on Public Services: Compliance Availability and Impact on Public Services Analysis ,/ Police and Fire: Police and Renton Fire Authority staff indicates that sufficient resources exist to furnish services to the proposed development. No fire impact fees are applicable for this project. ,/ Transportation: See transportation discussion under FOF 21, Site Plan Review: Transportation. Storm Water: An adequate drainage system shall be provided for the proper drainage of ,/ all surface water. Staff. Comment: See FOF 21, Site Plan Review: Drainage. ,/ Water: No water service is proposed or required for the redevelopment project. ,/ Sanitary Sewer: No sewer service is proposed or required for the redevelopment project. I 1. CONCLUSIONS: l. The subject site is located in the Residential Medium Density (MD) Comprehensive Plan designation and complies with the goals and policies established with this designation, see FOF 16. 2. The subject site is located in the Residential -8 (R-8) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 17. 3. The Residential Design and Open Space Standards are not applicable to the proposal, see FOF 18. 4. The proposed substation improvements comply with the Critical Areas Regulations provided the applicant complies with City Code and conditions of approval, see FOF 19. 5. The proposed substation improvements comply with the Conditional Use Permit criteria as established by City Code and state law provided all advisory notes and conditions are complied with, see FOF 20. 6. The proposed substation improvements comply with the Site Plan Review criteria as established by City Code and state law provided all advisory notes and conditions are complied with, see FOF 21. 7. The proposed substation improvements comply with the street standards as established by City Code, provided the project complies with all advisory notes and conditions of approval contained herein, see FOF 21, Site Plan Review: Transportation. 8. There are adequate public services and facilities to accommodate the proposed substation improvements, see FOF 22. I J. RECOMMENDATION: Staff recommends approval of the Talbot Hill Substation Improvements, File No. LUA16-000922, as depicted in Exhibit 3, subject to the following conditions: 1. The applicant shall comply with the mitigation measures issued as part of the Determination of Non- Significance Mitigated, dated January 23, 2017. 2. If the 11 trees to the west of the access driveway are proposed for removal, the applicant shall submit a revised tree replacement/visual barrier plan at the time of Construction Permit application for review and approval by the Current Planning Project Manager. HEX Report_LUA16-000922 Talbot Hill Substation final version City of Renton Department of Community & Economic Development TALBOT HILL SUBSTATION IMPROVEMENTS Report of February 14, 2017 Hearing Examiner Recommendation LUA16-000922, ECF, SA-H Page 17 of17 3. The applicant shall submit a revised Arborist Report with Construction Permit application for review and approval by the Current Planning Project Manager. The revised Arborist Report shall provide further detailed explanation for why no reasonable alternative to tree removal is possible for the 11 trees to the west of the access driveway and shall provide suggested locations and species of supplemental trees to be planted. The report shall include planting and maintenance specifications for replacement trees. 4. The applicant shall either submit plans to construct the required half street improvements along Puget Drive SE (including the required 8-foot wide landscape strip between the curb and sidewalk) or shall submit an application for a modification from the required frontage improvements at the time of Civil Construction Permit Review. HEX Report_LUA16-000922 Talbot Hill Substation final version DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ------Renton 0 ENVIRONMENTAL REVIEW COMMITTEE REPORT EXHIBIT 1 ERC MEETING DATE: Project Name: Project Number: Project Manager: Owner: Applicant/Contact: Project Location: Project Summary: Exist. Bldg. Area SF: Site Area: STAFF RECOMMENDATION: January 23, 2017 Talbot Hill Substation Improvements LUA16-000922, ECF, SA-H, Angelea Weihs, Associate Planner Puget Sound Energy, Inc.; PO Box 97034 M/S PSE-09N, Bellevue, WA 98009 Jeff McMeekin; PO Box 97034 M/S PSE-09N, Bellevue, WA 98009 2400 S Puget Drive PSE is requesting Hearing Examiner Conditional Use Permit, Environmental (SEPA) Review, and Site Plan Review for proposed Talbot Hill Substation improvements located at 2400 S Puget Dr. (parcel numbers 2023059003 and 20230S9066). The project site totals 50.4 acres and is zoned Residential-8 (R-8). PSE is proposing to rebuild a portion of the Talbot Hill Substation in order to replace aging equipment and provide more reliability for the transmission lines connected to the substation. The existing control house will be demolished and a new control house is proposed in its place. The existing 230kV substation equipment inside the fence is proposed to be removed, including steel structures and foundations. No additional transmission lines are proposed with the rebuild of this project. A new storm drainage system is proposed within the fenced area and a detention pond will be installed south of the southerly substation fence. The detention pond will involve an excavation of more than 500 cubic yards, which triggers SEPA Review. The substation footprint will remain unchanged. Additional driveway improvements are proposed to allow larger vehicle access to the substation. The project site contains moderate coalmine hazards, moderate landslide hazards, and sensitive slopes (within 50 feet). The applicant has submitted an Arborist Report and Geotechnical Engineering Study with the application. 999 SF Proposed New Bldg. Area (footprint): Proposed New Bldg. Area (gross): 50.4 acres Total Building Area GSF: 1,449 SF 1,449 SF 2,448 SF Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance -Mitigated (DNS-M). Project Location Map ERC Report_LUA16-000922 Talbot Hill Substation l EXHIBIT 2 Q ~ ~z~ ~o~ ~~~ f--<~~ o~~ ~Cl)~ ~~Cl) ~::J> ~Cl)~ 0 rt'\ N i-a:'.).. LJ..J <: \.J \.J::) ~ ~O<: V\ LL.i ~ ~ 1-' V) <{ w "' w \!) z <{ "' :r' I- "' 0 z "' N Cl. :r V) z ~ 0 I- 0 "' z 0 ;:: u w V') ;:,'! w VI ..., I- iii :c X UI ,.r ". "°==·=~~;;;;;;:~ ' '"""' ! • ,o • • 0 • ' i ! h ~ ' i ' ,, 9' ' ' • I ~" ' ! i ' i, ~~ 8 " 'i' ! "' F . ! ~ i . ' I • TALBO ,L SJBSTA-ON .. '• STORMWA.ffR POND TREE REMOVAc AND LANDSCAPING LA~CSCAPE KcY I r' I ' r I ~ ~ I c• [l E~CRGEW PLANTl'IC ···---···; I ~ SEW ~-x I UkJ I [ __ : Vl,LA, ~~f<R~[R PL.•tifl~G ~ ~1 EXHIBIT 4 ~ -"~ • ,m: I ,J ~ ...,._ L•-•.,••= I• I ..... SJ....,,.._ ------·-VISUAL BARRIER PLANTING PLAt. I i TAL80~ HILL SUBSTA"". ON p 'iNI!MbMI """' ~·-_ ........ 1 I\BI1L0f~SELECT1VE rREE REMOVAL WEST OF STOR~WATIB._Eillfil. -= I : 5~•= :..:'~ jE.''87f6• ! 0 i -.,...,, ''°"""'-~ -' >-0 La. I z "' . w • CL <( :;.., u i5 Ul 2: 0 !I ~----· l __ J.... 1 ---------·~-·--·L ' l i (I I l ·1 ! a I ' ·! I ~ i ·I I ~ ! ' ' ' b • 1~ gl II H 11 :n 1 i ~, ; ll!!lj I! I d •I I ~ h i I 0 I ! I I "'§ ~. ~i r 1- L_ ------~ ---_J_ __ ~ -J.lt-. \l ~i fu ' :3 r ~~ ! i; ..J ~ 0 ,111;,i r . 1·1· • S! I Iii 11 I ' ·1 1 111 , l!il I ~ I .. tll I!: ~~ ( iii ~! ~ ~4lH! ~ 'ill -!11 ~ ! !';; ~ g il ~ ~ ii w. ---,--~-ii ti i ~· i ,-T -R<l>nl-n.,os--I I I L 470 r,w,,..,m,., I 470 ·'" "™= ,_ I I [_ I \~ I I ',"~''', 450 ·!IL ~1, ~ . ! . ., ~t H 425 --I f425 -·· O(o~r,;~ [ i!:!r;, ~ ::: I ·~ ~ '"' ~: ~ STAnl'II! 0 50 IX) 150 200 250 300 350 400 450 500 050 600 650 SECTION A-A MOIIIZOll!"-K'<L:l'•Jo" "11!1CM.""""I'• " I 4751 I ~iotSS'""I f475 I -I -I I I I ' \ \~~ r r I I ' -1 ~-1450 I --f·. ,' ,] ' ,., ., !-• I ' 420 i ~ f420 ~ ,.....,,,, •IJ'< 1""1:'ss -.,, ·~ " ;~,·,~! "~ ·~ ' '"'" l<C.IOl•CW. ,~ "" ~:.-'"'"' I "" 0 50 100 150 200 250 300 350 400 450 500 050 600 650 f! SECTION B-8 _,tm<lAO.>CAU.1'•"'1 """C,11_ <Cit.[• , •• " ,--.. .._.,,,.,,m =.-VISUAL BARRIER ,::OLANTING Pl AN TALBOT HILL suss-:-ATIOI\; ii •= Sl/9'1A- ;:i Hl746 1-0 .. ~ --"""·"'' ~-.-"'"-"""' -z----, Ii~ I'. ·1.'.o· i\i,t ' .. fi// .. ~:l:07 '!I'-~!~-----'~ z 0 ~ u lji ~ ~:: -· 0 ' -~ " r ' !o ' Ill~ //.-.... ··7--, ......... ""'"""' , .. _, ...... , .......... "". u,._,,,,. , ., .. ...,.._... ~ ~:·1 ~~~~*~~"' \_ '~WW\~''·, / ,; . .---~~·:.~:i..::::.C,lt",~'-~W'-~1U'· ~.l"li='-~~··-.-----------~·m:cr"~:., ------:~~;,\~-~~\"i\-, ~:=-~~~ ~ 1,,\!ll!ir ; , ''"'~~"°-'-'~-----l '"'''""''·':~-----'"'-('1 ----1•,P!!".I!" \" 111'1 1\I ,. f' , '1'·~ .... ---M·#·=-----------=--------~---. .,,,.1~~,1, mi 11 .. 11.111 1· , 11 1 • , • , ,~, • ,,I 11 I "' \., L L c: L L L L l.' ~ L L I ~ f• l l' ~ _ 1 ,r -.. , , . ,. .. .. - 1 1 ~-!\it ,i 11i'i\\';,il , ; I , . . . . ' ' . , ' , . . ' . , . " . ·1 '" ,11,11\,,, 1 _.,, • .; _., _., ., , .,, ., , .J ., I ' '~ 1 • 1 I 11 \ .... . ... -.. ,,111:;,.,I,'!, ---' •.................... -·-····················O•••·····---~ l '1, I ;, ·!' 1,:r\ I l:;: I i B i I j 10 1 I 11111 IU1 ft . . -r· . 111 •• f ,-, , ... " '-1 / I , , I !! , ' . " . , ·-·~ JI o':i ' j ' ' ' ·, ' ' ..... . I''~. --CJ '''I l I ' L-• __ , ' ... ' I\ '..:..,__ ' ' ' . • .......... ·.·, ....... _ ........... j, .................. 1 ' •......... 1 ...................... ;.t·------·•--········· J-11,•11 · '--), 111 / ! I ii --. . ['-;, ---~ 7G--~---------; j" ·. . .... 1'::~ ····1····· ii''•.:--. ~)1!.; j . 1-··--1 -•O-Jl'Ja• LEGENO: ---~-· ' 0 c:=:J .,,1 . ; ,, " ,. "''-""''" Ii, 1111/i'; l::::t::=,./ : 'I -I IJ ·" ,, ~1 i r ~: ~: ~: (!Jul! c. LI \ :.-.:__ ~----::} (1 '·f' ,___ r 1"' -. c/ . ';' ' ;.:f "I ,... , ""--, ·-·"'"' ""'' 0 ! n-\ + I J' I <u01,oo .. ,,, . . ' . I I -:·y I I ';// 'L ' I ' >v I I I· 1_) / .• " . />( 1 1· .,1----:.,,~-~~~., , ",;-' .~ -,-·-'-.·7--:·-·--~·~::--~--d ·· --I ----.. ....._,~* --l ,-:'-:;'---_ 7 MA.TCH LINE-.t231KV Sl0£l ,,..,. oo.ii ~-rat~·~~(~< "·(1'15KVSJ0EI ___ ;; , w I: ('l:C• -_ '"'"" '• ,.,..tY-,,, •• • '# -,,.... '. j --," ,,: '---rr ____ ___J . \ ' ~ ,,.,,, , __ :: 1[!!!:H)·-~·--~·_, ,:: ·--;;:::----~ . (·;\~. --·-............................ -------~ '"/ r-l ·1 * = -~ I I I: I I I APPROXIMATE EARTHWORK I: \~-~--- GRADING NOTES QUANT II JES REFERENCE DRAWINGS , ... ''"°'""''"' "'M..L """" 1•• , .. , .. " IN'"' "EHi :>I i:mitc:.,~..:·~r;.,~~,,,c:·:!t·~.t""'""""'(' ,. ,,c ~~=.:~.m~~t\~ f.!i:,i,:C,i.oc,..~:;:;'f~ ro UC"-''""· o,,4ooc• ,..,_ .... , . .,,,_, +>""ll"''"' h1P(IIIT[O Flcl ~ •oe> ,ou ... ,er1,s "'""" "'' """"'""'"""'"""""-'·"'""'"'"''"""'"'""'""""'"" .... ,,. "'€""""'"""'"'" ... ""'" "'"'""'"(""''""'""'"'"'"""'""''""""" """ '""' '"' """"'""'' '"-""'-""""'""''"" '""'"''""'"''c:,o_" ''L'i-' ""' ~.,,. <>Lt °""NA<£ ..... ., :;;: ,!,l,i!!):' ~~~~ "-'""'""'""'"'"""""" ... '""-' .. ""'"""'""' r:;;;~::~1;:.}'.!~r:.::::i~~:::~~ 1 ~1l:i11'~·Ji:i!~l~.~~~i~i'..!:,;~'i: '""" ~ ~al~:, .. '""'"'""'""'"''"""'' ......... ..,.,,.,,,,.,.,,, ..... ,. "'''"' '"""'"'"•st"""'·,.,, -,,o, ,.rn,., '""",.""· s,w JU '""' "'" "'" cwim ""' ,• JF ,,.o •oi:• =.~;~':~,:-X:~6'.'~ ::.'~.:~= :"i~ i:t..: ~.·, "''" '"''"'"""''""'-"''"'''"'''"'' """' "'""'"'"'' """""'"" "'" °'""' '" "'"·" IS '"" TOI' o< •"'0 "<JC• to O< • • "lO• ,cu,:,., Ii>•> ~z~ ·~ ~ GAAP~_l~10SC~L~ "'''"''°""'"'""'" .... ,,. '"""''"""""" '""''"''''"" l@ CILI. B<F<>lE roo OIG Call: ICU ff!EE t-soo-42~-sm GRADING AMO FENCING PLAN 230KV SWITCHYARD TALBOT Hill SUBSTATION iii ·!~::.; LD-J 813"1 ,,~ 0 i i l L " ~~ ,, ~~: rac-,,--'' ----···'" \ ...... , l=-i _;:;: J ww oo :· 1· ~ ~ ' ~ - I . ~ = ~ : :1 0 O 0 • -0 O D: • 0 O ,<, 0 o . ~ r ~l _______________ -lJ___j.....r.az,,;;-;;:;;;,, • .,,;;;.,n -~-J_ .»»<WI"• ...... i ! :,--:, .. ·· - .~ ~- l~ ffi] '""' .. '"fl""fC"tt •·-,;,,..., -·1 "'""'"""_/ (Ill°'""'"""" ............ :; .. ""i-.. TYPICAL STATION SECTION DET,~IL (Ty1') Al>< .. ..., ~A1CH i,,.sll« ''"" ""'' ··-:,,::" .. :::.~"" ..... , .......... "" .. '\ ,.,... ,·--o· I CCIUIO<t.._,~ I ("""''"""'""'"'"" ,._.. ...... ,,,.,_,oc:, :;rr.•,t1:;,lt5~. NOTES: LOC<INO""'lt ""''"""'" --,aJfSIO( <II Wll5lmDI<""'" "'''"'"'"'""'·"' TYP(CAL CATCH BASIN GRADING outsJoE oF SPCc AREA DETAIL ffi MfS 1 ,·-o· ""· . ..--. I '~','.'.'. f'vc~; .. I 'I ""';;. ... ,. W• ""°' SLO,-l -, I'!._ '"-"" \ •001"1•-H. ...,. =".5;'~'7,,tc.e........_ ' l4',""&.ifil . ...':'d"fil..._ ( • .,,vc,,..,,c-~ -~ ~:=:!'i,""',..'"[0 a... \.., ..... '""" -......_"""'''"""·'"" . .... , , ... ,.,c,., .. SECJ~ON {f) ""~ ... :;,.:r\J;j,;,.~ '"~ k:~ . ""~ .: .. \: ... ,_ ... , '-,-, ... ,.., .. , GRAVEL DRIVEWAY SECTION ~ lc@ cu em>< Yl]J DIG Cori: rcn rAEl J ~800::-t_H~5.S~ GRADING SECTIONS AND DETAILS TALBOT HILL SUBSTATION •= ........ "" !l<(;lllf.!01 .. ..... ~, ;ijijiio D-187:H 0 ·~