ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE: March 21, 2016
PART ONE: PROJECT BACKGROUND
Project Nome:
Project Number:
Project Manager:
Owner:
Applicant/Contact:
Project Location:
Project Summary:
Exist. Bldg. Area SF:
Site Area: 168,630 sf
STAFF
RECOMMENDATION:
Cedar Ridge Church Expansion
LUA16-000128, ECF, CUP
Jill Ding, Senior Planner
Cedar Ridge Church, 11411 SE 1641h Street, Renton WA 98055
David Pagel, Gabbert Architects Planners, 18422 103'd Avenue, Bothell, WA 98011
11411 SE 1641h Street (Parcel No. 008800-0320)
The applicant is requesting Hearing Examiner Conditional Use Permit approval for the
proposed addition to the Cedar Ridge Church. The proposed addition would occur in
two phases. Phase 1 would include the addition of 8,908 square foot sanctuary to the
existing church building and would increase the existing total seating capacity within
the church to 301. The existing original 2,540 square foot church building would
remain as part of this phase and would be converted to classroom and fellowship hall
space. In Phase 2 the existing original 2,540 square foot church building would be
demolished and replaced with a 6,879 square foot addition which would include a
kitchen, fellowship hall, and additional meeting and classrooms. The project site
totals 168,630 square feet (3.87 acres) and is zoned Residential-8 (R-8). The proposed
'· project includes the addition of 55 parking spaces by the end of phase 2, resulting in a
total of 95 parking spaces on site. A total of 61 spaces would be available after the
completion of phase 1. Access to the site would remain off of SE 164th Street via one
curb cut. A sensitive slope (grade between 25 and 40 percent) and two Category 3
wetlands have been identified on the project site (Wetlands A and B). Wetland A
would have a standard buffer of 100 feet and Wetland B would have a standard
buffer of 75 feet. Wetland buffer averaging is proposed to accommodate the
proposed church expansion.
2,540 sf Proposed New Bldg. Area (phase I}:
Proposed New Bldg. Area (phase II}:
8,908 sf
6,879 sf
Toto/ Building Area GSF (phase I & II): 15,787 sf
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance (DNS).
Project Location Map
ERC Report_Cedar Ridge Church_16-0001ZB
City of Renton Department of Community & .mic Development
CEDAR RIDGE CHURCH EXPANSION •
vironmental Review Committee Report
LUA16-00012B, ECF, CUP
Report of March 21, 2016 Page 2 of S
i PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and
environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14-day Appeal Period.
B. Mitigation Measures
C.
1. None recommended
Exhibits
Exhibit 1
Exhibit 2
Exhibit 3
Exhibit 4
Exhibit 5
Exhibit 6
Exhibit 7
Exhibit 8
Exhibit 9
Exhibit 10
Environmental Review Committee Report
Geotechnical Engineering Evaluation, prepared by Nelson Geotechnical
Associates, Inc., dated September 25, 2015
Critical Areas Study and wetland delineation prepared by ACRE Environmental
Consulting, LLC, dated January 1, 2016
Technical Information Report (TIR) prepared by Touma Engineers, dated
February 14, 2016
Traffic Impact Analysis, prepared by Christopher Faulkner, PE, dated January 30,
2016
Site Plan Phase I and II (Sheets Al.0 and Al.1), prepared by Gabbert Architects
Planners, dated 2/18/16
Landscape Plan
Building Elevations (Phase I and II)
Grading and Drainage Plan
Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers hove identified that the proposal
is likely to have the following probable impacts:
1. Earth
Impacts: A Geotechnical Engineering Evaluation, prepared by Nelson Geotechnical Associates, Inc.,
dated September 25, 2015 (Exhibit 2) was submitted with the project application. A Sensitive Slope
is mapped on the southwest portion of the project site. The applicant has indicated that grading
would occur across approximately 70,719 square feet of the site and that the cut and fill would be
balanced across the project site.
According to the geotechnical report (Exhibit 2), the topography of the project site has a relatively
level "bench" area within the central portion of the property. The ground surface slopes down
ERC Report_Cedar Ridge Church_16-000128
City of Renton Department of Community & .omic Development
CEDAR RIDGE CHURCH EXPANSION
Report of March 21, 2016
.vironmental Review Committee Report
LUA16-000128, ECF, CUP
Page 3 of s
gently to moderately in all directions from the central "bench" area. Moderate south-and
southwest-facing slopes are located along the western and southern portions of the property that
descend from the existing gravel driveway and parking areas to neighboring properties and
wetland areas at an approximate grade of 36 percent. The site is generally vegetated with grass
and sparse trees within the proposed development area and with trees and blackberries within the
southern and western portions of the property. No surface or groundwater seepage was observed
at the time of the site visit on September 4, 2015.
A total of eleven test pits were excavated on the project site with depths ranging from 2.0 to 8.5
feet below the existing ground surface using a mini-trackhoe. In all test pits 0.5 to 1.0 feet of
surficial grass and topsoil was encountered. Underlying the topsoil in Test Pits 1, 8, 9, and 11 2.0 to
7.0 feet of loose/stiff brown to red-brown silty fine to medium sand with gravel with varying
amounts of gravel, organics and debris and sandy silt with organics that were interpreted as
undocumented fill soils, were encountered. Underlying the surficial topsoil in Test Pits 2-7, and 10,
and the undocumented fill in Test Pits 1, 8, 9, and 11 dense to very dense, red-brown silty fine to
medium sand with fractured sandstone and gray sandstone interpreted to be native sandstone
bedrock deposits was encountered. All test pits were terminated within the native and
unweathered bedrock deposits. Groundwater was not encountered in any test pits.
The report concludes that the site is compatible with the planned development and the native
bedrock soils should provide adequate support for foundation, slab, and pavement loads. The soils
are not conductive for typical on-site infiltration due to the relatively high silt content and shallow
bedrock deposits interpreted to underlie the project site. Shallow infiltration systems in the form of
pervious pavements, bio swales, or rain gardens may be feasible at specific areas within the site. It
is recommended that construction take place during the summer months due to the drier weather
conditions as construction during wet weather may disturb the soils and result in additional delays
and expenses. The report included recommendations regarding erosion control, site preparation
and grading, temporary and permanent slopes, foundations, retaining walls, structural fill, slab-on-
grade, pavements, utilities, and drainage. It is anticipated that the City's currently adopted erosion
control, construction, and drainage regulations would adequately mitigate for any impacts that
could result from the proposed development; therefore no further mitigation is recommended.
Mitigation Measure: None recommended.
Nexus: Not Applicable.
2. Water
a. Wetlands
Impacts: The applicant submitted a Critical Areas Study and wetland delineation prepared by ACRE
Environmental Consulting, LLC, dated January 1, 2016 with the application (Exhibit 3). Two
Category Ill wetlands (Wetlands A and B) were identified on or near the project site. Wetland A is
the larger of the two wetlands and is located within a transmission line easement on the southern
portion of the project site and extends off-site to the south. Wetland B is smaller in area than
Wetland A and is located offsite to the west, within the transmission line easement near the
southern portion of the project site. Wetland A was identified as having a habitat value of 5 points
and would have a standard buffer requirement of 100 feet. Wetland B was identified as having a
habitat value of 4 points and would have a standard buffer requirement of 75 feet.
ERC Report_Cedar Ridge Church_16-000128
.----------------------------------------------
City of Renton Department of Community & .omic Development
CEDAR RIDGE CHURCH EXPANSION
Report of March 21, 2016
.vironmental Review Committee Report
LUA16·000128, ECF, CUP
Page 4 of 5
There are existing physical improvements in the form of maintained lawn and gravel parking in and
adjacent to the outer portion of the wetland buffer areas. The majority of the on-site buffer areas
is located beneath an overhead transmission line easement and is dominated by Himalayan
blackberry.
Wetland buffer averaging is proposed to accommodate the expansion of the parking lot, the
stormwater detention pond, and landscaping. The northern buffer around Wetland A is proposed
to be reduced from 100 feet to 75 feet and the northeastern buffer around Wetland B is proposed
to be reduced from 75 feet to 57 feet. The City's adopted Critical Areas Regulations (RMC 4-3-050)
include requirements for wetland buffer averaging and buffer reduction with enhancement. The
proposal will be reviewed in conformance with the adopted Critical Areas Regulations as part of the
staff recommendation for the Conditional Use Permit; therefore no further mitigation is
recommended at this time.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
b. Storm Water
Impacts: A Technical Information Report (TIR) prepared by Touma Engineers, dated February 14,
2016 was submitted with the project application (Exhibit 4). The project site falls within two
drainage basins. The northerly portion of the site slopes to the north and drains to the Black River
drainage basin, and the south portion of the site, with steeper slopes (classified as Sensitive
Slopes), drains to the Soos Creek basin. The site falls within the Flow Control Duration Standard
(matching forested site conditions). The surface water runoff for the northern portion of the
project site drains to the north and is intercepted by open ditches on the south site of SE 164'h
Street. The flow is directed west and then north via an existing culvert to an existing drainage swale
situated under the Bonneville Power Line right-of-way. The flow is then directed northwesterly
until it reaches Puget Drive. The flow is then directed west along Puget Drive and flow into the
storm system situation on the west side of Talbot Road where it is directed west to Springbrook
Creek and eventually the Black River.
The surface water runoff for the southern portion of the project site is direct to two Category Ill
wetlands. The flow continues as sheet flow to the south crossing of SE 168'h Street and flows into
the upper end of Soos Creek.
The flow control facility proposed for the north basin stormwater runoff is a concrete vault under
the proposed expanded parking lot. The south basin is proposed to drain into a stormwater
detention pond. The sizing and design of the proposed flow control facilities would be reviewed for
compliance with the adopted 2009 King County Surface Water Design Manual and City of Renton
amendments; therefore no further mitigation is recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
3. Transportation
Impacts: A Traffic Impact Analysis, prepared by Christopher Faulkner, PE, dated January 30, 2016
was submitted with the project application (Exhibit 5). The proposed project would maintain access
to SE 164'h Street via an existing 20-foot wide driveway. The church currently has three activites
scheduled at the site during the week, the largest being Sunday morning services from 9:00 am to
ERC Report_Cedar Ridge Church_16-000128
City of Renton Department of Community & .omic Development
CEDAR RIDGE CHURCH EXPANSION
Report of March 21, 2016
.vironmental Review Committee Report
LUA16-000128, ECF, CUP
Page 5 of 5
11:00 am. The church is also used on Wednesday evenings for a Bible Study class that starts at 6:30
pm. In addition, there is a Friday night youth group, which meets from 7:00 pm to 9:00 pm. There is
currently no Church office on site, nor is an office included in the proposed plans. None of the
scheduled church activities fall within the Weekday Peak Hours of 6:00 am to 9:00 am or 3:00 pm
to 6:00 pm. All of the anticipated traffic generated by the project proposal would occur during non-
peak hours. Therefore, it is anticipated that the proposed project would not result in an increase in
peak hour trips to the project site and no further mitigation is recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or "Advisory Notes to Applicant."
./' Copies of all Review Comments are contained in the Official File and may be attached to this
report.
The Environmental Determination decision will become final if the decision is not appealed within the
14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady
Way, Renton, WA 98057, on or before 5:00 p.m. on April 8, 2016. RMC 4-8-110 governs appeals to the
Hearing Examiner and additional information regarding the appeal process may be obtained from the City
Clerk's Office, Renton City Hall -7'h Floor, (425) 430-6510.