HomeMy WebLinkAboutNOA_Renton_Downtown_Library_120419NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON -SIGNIFICANCE -MITIGATED (DNS -M)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) — Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION:
LAND USE NUMBER:
PROJECT NAME:
April 19, 2012
LUA12-022, ECF, SA -H, CU -H, MOD
Renton Downtown Library
PROJECT DESCRIPTION: The applicant, King County library System (KCLS), is requesting Hearing
Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Environmental (SEPA) Review and a Parking
Modification for the construction of a new 15,083 square foot public library. The project site consists of three parcels
containing a total of 24,079 square feet of Center Downtown (CD) zoned property. There is an existing retail structure
on the west end of the site, formerly used by BigS, and an associated parking lot in the center of the site which is
proposed for demolition/removal as part of the proposal. Additionally, Gateway Park is located on the eastern portion
of the site which would be redesigned as part of the proposal in order to create an entry plaza forthe new library. The
proposed restriping of the existing parking area, to the north within a City of Seattle Cedar River Pipeline easement,
would create two additional parking spaces along with the addition of 6 new stalls, resulting in a total of 50 onsite
parking stalls. The applicant is requesting a parking modification in order to decrease the minimum of parking spaces
required onsite from 60 to 50 stalls. Access to the site is proposed via two curb cuts; one along Morris Ave S through to
Logan Ave S. There are no criticat areas located on site_
PROJECT LOCATION: 510 S 3'd Street
OPTIONAL DETERMINATION OF NON -SIGNIFICANCE, MITIGATED (DNS M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted underthe RCW 43.210.110, the City of Renton is using the Optional DNS -M process to give notice that a DNS -
M is likely to be issued. Comment periods for the project and the proposed DNS -M are integrated into a single
comment period. There will be no comment period following the issuance of the Threshoid Determination of Non -
Significance -Mitigated (DNS -M). A 14 -day appeal period will follow the issuance of the DNS -M.
PERMIT APPLICATION DATE:
March 27, 2012
NOTICE OF COMPLETE APPLICATION:
April 19, 2012
APPLICANT/PROJECT CONTACT PERSON:
Maaike Post, Miller Hull Partnership - 71 Columbia Street, 6°h FL,
Seattle, WA 98104, Eml: mpost@m#llerhuIL corn
Permits/Review Requested:
Environmental (SEPA) Review, Hearing Examiner Site Plan Review,
Hearing Examiner Conditional Use Review, and Parking Modification
Review
Other Permits which may be required: Building and Construction Permits
Requested Studies: Geotechnical Report, Drainage Report, and Hazmat Survey
Location where application may
be reviewed: Department of Community & Economic Development (CED)— Planning
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98057
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED — Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: Renton Downtown Library/LUA12-022, ECF, SA -H, CU -H, MOD
NAME:
MAILING ADDRESS:
TELEPHONE NO.:
PUBLIC HEARING: Public hearing is tentatively scheduled forJune 19, 2012 before the Renton
Hearing Examiner in Renton Council Chambers. Hearings begin at 1:00 p.m. or
the 7th floor of the new Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Urban Center- Downtown (UC -D) on the City of
Renton Comprehensive Land Use Map and Commercial Downtown or the City's
Zoning Map,
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City's SEPA ordinance, RMC 4-2-120B and
other applicable codes and reguiations as appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed
project. These recommended Mitigation Measures address project impacts not
covered by existing codes and regulations as cited above.
• The applicant will be required to pay the appropriote Transportation Mitigation Fee, and
■ The applicant will be required to pay the appropriate Fire Mitigation Fee.
Comments an the above application must be submitted in writing to Rocale Timmons, Associate Planner, CED —
Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on May 3, 2012. This matter is also
tentatively scheduled for a public hearing on lune 19, 2012, at 1:00 p.m., Council Chambers, Seventh Floor, Renton
City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-7282, if comments cannot be submitted in
writing by the date indicated above, you may stilt appear at the hearing and present your comments on the proposal
before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and
receive additional information by mail, please contact the project manager. Anyone who submits written comments
will automatically become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Rocale Timmons, Associate Planner; Tel: (425) 430-7219;
Eml: rtimmons@rentonwa.gov
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
E F
i
de[J viNty.