HomeMy WebLinkAboutSR_HEX_Walmart_Expansion_100322DEPARTMENT OF COMMUNITY D �city ofn (0) U 8 -
AND
ECONOMIC DEVELOPMENT
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DA TE.
March 22, 2010
Project Name:
Walmart Expansion
Owner:
Peter Bonnell; Bonneil Family, LLC; 100.47 Main Street 4409; Bellevue, WA 98004
AppllcanVContact:
Jeff Chambers; Paciand; 1.505 Westlake Ave N, Ste# 305; Seattle, WA 981D9
File Number:
LUA10-009, ECF, SA -H
Project Manager.
Rocale Timmons, Associate Planner
Project Summary:
The applicant is requesting Hearing Examiner Site Plan Review and Environmental
(SEPA) Review for the construction of additions to the existing Walrrmart retail
facility, which contains 134,352 square feet of retail space with an additional
9,000 square feet used for the Garden Center. The applicant is proposing 16,000
square feet of additions to the retail space and a reduction of 4,000 square feet in
the Garteri Center. The expansion of the facility is predominately located along
the northern facade with modifications to the eastern facade. The proposal
includes the re -striping of the existing surface parking lot with an expansion of the
parking to the north. The expansion includes 127 additional parking stalls
resulting in a total of 745 parking spaces. As part of the parking lot expansion the
applicant is proposing associated landscaping and pedestrian pathways in addition
to the demolition of the existing restaurant formerly known as Billy McHales. The
site area is approximately 13.6 acres and is located within the Commercial Arterial
(CA) and Medium Industrial (IM) zoning designations and is also located within
Urban Design District D. Access for the proposal would continue to be provided
via existing driveways along SW 7th Street, Rainier Ave S/5R 1.67, Hardie Ave 5 and
S Grady Way. There appearto be no critical areas on-site.
Project Location:
743 Rainier Ave S Site Area: 594,553 SF (13.6 ac)
STAFF
Staff Recommends that the Environmental Review Committee issue a
RECOMMENDATION:
Determination of Non -Significance - Mitigated (DNS -M).
Project Location Map
ERC Report- Walmart Expansion
erg
0
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WALMART EXPANSION LUA10-004, ECF, SA -H
Report of March 22, 2010 page 2 of 6
PART ONE; PROJECT DESCRIPTION / BACKGROUND
The applicant, PACLAND, is requesting Environmental (SERA) Review for the future construction of additions to the
Renton Walmart retail store. The expansion would increase the existing building by approximately 16,000 square
feet and decrease the existing garden center by approximately 4,000 square feet. The additions would be located
on the northern and eastern elevations and would create the opportunity to remodel the interior of the existing
store. The existing Walmart consists of an approximately 134,000 square foot building and a 9,0DD square foot
Garden Center. The proposal also includes an expansion of the surface parking lot, along with additional
landscaping and improvements to drainage on-site as well as new fapde treatments along the northern elevation.
In addition to the Environmental Review, Site Plan Review before the Hearing Examiner has also been requested.
The subject property is located on the west side of Rainier Ave S/5R 167 between 5W 7th St and S Grady Way. A
recently approved Short Plat (LUA09-158) increased the size of the project parcel from 99 acres to 13.6 acres. As
part of the short plat the applicant is proposing the demolition of the restaurant formerly known as Billy Mcblales,
currently sited on the north portion of the parcel. The property is zoned Commercial Arterial (CA) and Medium
industrial (IM) and located within the Commercial Corridor (CC) and Employment Area Valley (EAV) land use
designations.
The completed project would result in a 150,244 square foot retail building, 745 surface parking stalls and a 4,701
square -foot Garden Center. The pr posed project area is predominately paved surfaces with areas of gravel just
north of the existing store location- The amount of impervious area would be increased by the proposal from
515,257 square feet to 528,863 square feet. New landscaping is proposed around the perimeter of the site and
within the surface parking lots. Some excavation of existing soil would be necessary for the areas of proposed
expansions. The volume of the cut would be approximately 9,500 cubic yards and 9,500 cubic yards would be
brought in for fill to be balanced onsite.
Access would continue to be provided via existing access easements and curb cuts along SW 7`h St, Hardie Ave SW, 5
Grady Way and Rainier Ave S/SR 167. The proposed building would result in a lot coverage of 25.3 percent. The
tallest point of the proposed additions would be the top of the parapet on the proposed trespa panel fagade
treatment at the center of the eastern facade; which would have a height of 32 feet and 4 inches from existing
grade. The proposed expansion, on the northern facade, would have a height of 21 feet and 4 inches at the tallest
point as measured from existing grade which matches the top of the existing parapet.
The applicant has requested an administrative modification in order to downsize the refuse and recycle area from
the required 2,325 square feet to 30 cubic yards, as they are proposing the use of a self contained compactor which
has been engineered for high volume usage. Staff has reviewed the request and issued a decision on the
modification along with the SEPA Determination below in order to run the appeal periods concurrently (Exhibit 7).
There are 99 trees located onsite of which 15 are proposed for removal. There are no known critical areas on or
near the site.
PART TWO; ENVIRONMENTAL. REVIEW
In compliance with RCW 43.210.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS -M with a 14 -day Appeal Period.
B. Mitigation Measures
1. Project construction shall comply with the recommendations found in the geotechnical report prepared
by Terracon, dated November 30, 2009.
ERC Report - Walmart Expansion
LJ
C:
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WALMARTEXPANSIO W LUA10-009, ECF, SA -H
Report of March 22, 2010 Page 3 of 6
2. The applicant shall comply with the Technical Information Report prepared by PACLAND, dated February
5, 2010, during project construction.
3. If pipe piles are used to support the proposed structure the applicant shall provide a noise and vibration
study to the Current planning Project Manager priorto building permit approval. The City also reserves
the right to limit the days and hours of construction when pipe piles are being driven.
4. Should evidence of a historic site be found during site development, work shall be stopped and the
applicant shall submit an archaeological resource survey of the site. This survey shall conform to the
requirements and standards of the Washington State Office of Archaeology and Historic Preservation
and must be conducted under the on-site supervision of a state -approved archaeologist. Work shall
recommence when approval is received from the Office of Archaeology and historic Preservation.
5. The applicant shall pay a Traffic Mitigation Fee in the amount of $75.00 for each new net daily trip prior
to issuance of building permits. The fee is estimated to be $45,600.00.
6. The applicant shall pay a Fire Mitigation Fee, prior to issuance of the building permit. The fee, at $0.52
per net square foot of new building area, has been estimated to be $4,472.00.
C. Exhibits
Exhibit I
Zoning and N,Zigoorhood Detail Map
Exhibit 2
Site Plan
Exhibit
Landscape Plan
Exhibit 4:
North and South Elevations
Exhibit 5:
East and West Elevations
Exhibit f:
Aerial Photo of Project Site
Exhibit 7:
Refuse and Recycle Modification Approval
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The site is nearly level with average slopes at approximately 3 percent. The steepest slope on site
is located in a landscape area and is approximately 20 percent_ The site consists of native fine-grained soils
which are generally soft to soft to medium stiff and compressible, and native granular soils which range
from loose to very dense. Grading on the project site would be minimal and limited to the north and east
sides of the existing store. Earthwork quantities would be approximately 9,500 cubic yards of fill and 9,500
cubic yards of haul -out. f=ollowing development impervious surface coverage will be approximately 89%.
A Geotechnical Engineering Study, prepared by Terracon dated November 30, 2009, was submitted with the
project application. The recommendations in the report are based on an examination of material that
occurred in two phases. The preliminary subsurface evaluation consisted of 12 borings and the final
evaluation consisted of 40 borings. All borings ranged in depth from 11 %: feet to 54 feet below existing site
grades.
The report includes design recommendations for site preparation and grading, excavation, foundation
support, slab -on -grade floors, drainage and pavements. The applicant is proposing to comply with the
recommendations found In the geotechnical report prepared by Terracon, dated November 30, 2009. In
order to limit impacts to the project site and neighboring properties staff recommends, as a mitigation
measure, that project construction comply with the recommendations found in the geotechnical report
prepared by Terracon, dated November 30, 2009.
FRC Report - Waimart Expansion
City of Renton Department of Community & Economic Development Envirorrrnental Revievr Committee Report
.WALMARTEXPANSION LUAin-_009, EGF, SA -H
Report of March 22, 2010 page 4 of 6
Mitigation Measures: Project construction shall comply with the recommendations found in the
geotechnical report prepared by Terracon, dated November 30, 2009.
Nexus: Grading, Excavation and Mining Regulations RMC 4-4-060; SEPA Environmental Regulations
2. Water
a. Storm Water
Impacts: The project site is located within the Black River drainage basin of the Duwamish-Green River
Drainage watershed. The applicant submitted a "Technical Information Report," prepared by PACLAND.
(dated February 5, 2010) as part of the application materials. The applicant is proposing the removal of
29,700 square foot gravel commercial pad located just north of the existing structure. It would be
replaced with the expansion of store, surface parking stalls, new landscaped areas and a new bioswale.
The existing parking area would not be significantly modified from its existing layout, but would include
an overlay and minimal landscape island relocations. According to the Drainage Report, the increase in
impervious area would be 14,544 square feet; from 514,319 to 528,853 square feet.
Existing stormwater runoff from the site flows towards multiple existing catch basins where it is collected
and discharged to the existing stormwater conveyance system. The water flows to an existing
biofiltration swale locate in the northwestern portion of the site which was designed to treat the
existing parking lot areas. The bioswale provides treatment prior to the runoff being discharged to the
existing storm system in 5W 7t' Street.
As stated in the Technical Information Report, the proposed project improvements generate a 0.035 cfs
increase in the 100 -year peak flow rate. Because the post -developed peak flow is less than 0.5 cfs more
than the existing peak flow, the project is exempt from flow control requirements. Any offsite runoff that
currently flows onsite will continue to be conveyed via the existing storm system. The proposed
conveyance system has been designed to convey runoff for the new impervious surfaces. Additional
water quality treatment, in the form of a new bioswale is proposed, as the project would add more than
S,000 square feet of new pollution generating impervious surfaces.
The applicant is proposing to comply with the recommendations found in the Technical information
Report prepared by PACLAND, dated February 5, 2010 for both drainage and erosion control. In order to
limit drainage and erosion impacts to the project site and neighboring properties staff recommends the
applicant comply with the Technical Information Report, prepared by PACLAND, dated February S, 2010
during project construction.
Mitigation Measures: The applicant shall comply with the Technical Information Report, prepared by
PACi.AND, dated February 5, 2010 during project construction.
Nexus: King County Surface Water Design Manual; SEPA Environmental Regulations
3. Environmental Health
a. Noise
Impacts: The Geotechnical Engineering Study, prepared by Terracon dated November 30, 2009,
recommended the use of augercast piles in order to support the structure's foundation. in lieu of augercast
pile, the study indicates that the applicant could use small -diameter steel pipe piles in order to support the
structure. Noise and vibration impacts can be associated with pipe pile driving. Therefore staff
recommends, as a mitigation measure, if pipe piles are used to support the proposed structure the applicant
would be required to provide a noise and vibration study to the Current Planning Project Manager prior to
building permit approval. The City also reserves the right to limit the day and hours of construction when
pipe piles are being driven.
Mitigation Measures: If the applicant uses pipe piles in order to support the proposed structure the
applicant shall provide a noise and vibration studyto the Current Planning Project Manager prior to building
ERC Report - iNadmort Expansion
0
City of Renton Department of Community & Economic Development EnvironmcnralReview Committee Report
WALMART EXPANSION LUA10-009, ECF, SA41
Repert of March 22, 2010 Page 5 of 6
permit approval. The City also reserves the right to limit the days and hours of construction when pipe piles
are being driven.
Nexus: SEPA Environmental Regulations
4, Historic and Cultural Preservation
impacts: It is possible that archaeological artifacts or a historic site could be encountered during project
construction. This is due to the site's proximity to former archaeological discoveries. Should evidence of a
historic site be found during site development, work shall immediately cease and the Washington State of
Archaeology and Historic Preservation shall be contacted at (360) 586-3065. A survey shall be submitted
that conforms to the requirements and standards of the Washington State Office of Archaeology and
Historic Preservation and must be conducted under the on-site supervision of a state -approved
archaeologist.
in the event that cultural artifacts are found, work cannot recommence until approval is received from the
Office of Archaeology and Historic Preservation.
Mitigation Measures: Should evidence of a historic site be found during site development, work shall be
stopped and the applicant shall submit an archaeological resource survey of the site. This survey shall
conform to the requirements and standards of the Washington State Office of Archaeology and Historic
Preservation and must be conducted under the on-site supervision of a state -approved archaeologist. Work
shall recommence when approval is received from the Office of Archaeology and Historic Preservation,
Nexus: SEPA Environmental Regulations
5. Transportation
Impacts: Access for the site would continue to be provided via existing access easements and curb cuts
along SW 7'1' St, Hardie Ave SW, S Grady Way and Rainier Ave 5/SR 167. There are three full access points
along SW 7a' St a full access along Hardie Ave SW; a right inlright out access point along Rainier Ave S/SR
167; and a full access point along SW Grady Way.
ADA crossing improvements are required to be evaluated by the Development Services Division and shall be
in compliance with ADA standards when construction occurs on the site. No other street improvements
would be required for the proposal.
It is anticipated that the proposed project would result ''in impacts to the City's street system and is
anticipated to generate 608 additional daily trips. A Transportation impact Study, prepared by the Transpo
Group (dated October 2009), was submitted by the applicant and was approved by the Development
Services Division, The traffic study supported the estimate for 608 additional daily trips. In order to mitigate
transportation impacts, staff recommends a mitigation measure be placed on the project requiring a
Transportation Mitigation Fee based on $75.00 per net new average daily trip attributed to the project. The
fee, at $75 per trip for the 608 new daily trips anticipated, has been estimated -at $45,600.00 (608 trips x
75.00 = $45,600.00). This fee would be payable prior to issuance of the building permit.
Mitigation Measures: The applicant shall pay a Traffic Mitigation Fee in the amount of $75.00 for each new
net daily trip prior to issuance of building permits. The fee is estimated to be $45,600,00.
Nexus: Transportation Mitigation Fee Resolution 3100; Ordinance 4489; SEPA Environmental Regulations
6. Fire & Police
Impacts: The Fire Prevention Bureau and the Police Department have indicated they have the ability to
provide service to the project provided required improvements are made and a Fire Impact Fee is assessed.
The fee, at $0.52 per net square foot of new building area, has been estimated to be $4,472.00.
Mitigation Measures: The applicant shall pay a Fire Mitigation Fee, prior to issuance of the building permit.
The fee, at $0,52 per net square foot of new building area, has been estimated to be $4,472.00.
Nexus: Fire Mitigation Fee Resolution 2895; SEPA Environmental Regulations
ERC Report - Walmart Expansion
City of Renton Deportment of Community & Economic Devefopment Environmental Review Committee Report
WALMART EXPANSION LUA1O-003, ECF, SA -H
Report of March 22, 2010 Page 6 of 6
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report andlor "Advisory Notes to Applicant."
V Copies of all Review Comments are contained in the Official File and may be attached to this report.
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in
writing on or before 5:00 PM, April 16, 2010.
Renton Municipal Code Section 4-8-110.3 governs appeals to the Hearing Examiner. Appeals must be filed in writing
at the City Clerk's office along with the required fee. Additional information regarding the appeal process may be
obtained from the City Cleric's Office, Renton City Hall - 7th Floor, 1055 5. Grady Way, Renton WA 98057,
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use action.
Because these notes are provided as information only, they erre not subject to the appeal process for the land use actions.
Planning:
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 a.m. to 3:30 p -m., Monday through Friday unless otherwise
approved by the Development Services Division.
Water:
1. The Water System Development Charge (SPC) is based on the size of water meter needed to service the development.
The SDC is only triggered with a change or additions in number or size of meter. Fee is payable with a construction or
utility permit.
2. The existing fire hydrants may need to be fitted with 5tortz fittings to bring them up to current City code.
Sanitary Sewer:
1. The Wastewater System Development Charge is also based on the size of water meter needed to service the
development. The SDC is only triggered with a change or additions in number or size of meter. Fee is payable with a
construction or utility permit.
Surface Water:
1. The Surface Water System Development Charge is based on $0.405 per square foot of new impervious surface area.
Minimums may apply, and this fee is payable with a construction or utility permit.
Transportation:
1. Traffic mitigation fees apply at a rate of $75.00 per additional daily trip, as calculated by the ITE manual. Fees are due
with the building permit for all commercial structures. A traffic study supporting 608 daily trips was submitted.
2. ADA crossing improvements are required to be evaluated and in compliance when construction occurs on the site.
Miscellaneous:
1. Construction plan indicating haul route and hours, construction hours and a traffic control plan shall be submitted for
approval prior to any permit being issued.
2. Separate permits and fees for side sewer, domestic water meter, landscape irrigation meter, and any backflow
devices will be required..
3. All plans shall conform to the Renton Drafting Standards.
4. A construction permit is required for any utility work. When plans are complete, three copies of the drawings, two
copies of the drainage report, a construction estimate, application, and an appropriate fee shall be submitted to the
City Fiala sixth floor counter.
ERC Report - Walmart Expansion.doc
�'