Loading...
HomeMy WebLinkAboutSR_ERC_Drofiak_Apartments_091026DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL REVIEW COMMITTEE REPORT FRC MEETING DATE: October 26, 2009 Project Name: Drofiak Apartments Owner/Applicant: Vlad Drofiak; V.Y. Properites LLC; 15012 SE 253rd Place; Covington, WA 98042 Contact: Ruslan Levandovsky; Precision and Design; PO Box 8081; Kent, WA 98031 File Number: LUA09-112, ECF, SA -H Project Manager: Rocale Timmons, Associate Planner Project Summary: The applicant is requesting Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of a 3 -story, approximately 33 -foot tall multi- family apartment building. The 19,889 square foot site is located within the Residential Multi -Family (RMF) zoning designation. The proposed building would include 10,879 square feet of residential space within 8 residential units. The applicant is requesting a parking modification in order to reduce the number of parking spaces required; from 16 to 14 stalls. The 14 stalls would be located within a surface parking lot west of the proposed building. Access to the site would be provided from SE Petrovitsky Road via one curb cut. There are no critical areas located on site. Project Location: 12228 SE Petrovitsky Road Site Area: 19,889 SF Total Building Area GSF: 10,879 SF STAFF Staff Recommends that the Environmental Review Committee issue a RECOMMENDATION: Determination of Non -Significance - Mitigated (DNS -M). Project Location Map ERC Report City of Renton Department of Commum Economic Development E, )nmental Review Committee Report DROFIAK APARTMENTS LUA09-112, ECF, SA -H Report of October 26, 2009 Page 2 of 5 PART ONE: PROJECT DESCRIPTION / BACKGROUND The applicant, Precision and Design, is requesting Environmental (SEPA) Review for the future construction of a three-story multi -family apartment building. In addition to the Environmental Review, Site Plan Review before the Hearing Examiner has also been requested. The subject property is located on the north side of SE Petrovitsky Road just east of 122nd Avenue SE at 12228 SE Petrovitsky Road. The multi -family apartment building would be sited on a vacant 0.456 acre site. The completed project would provide 10,879 square feet of residential space within 8 multi -family dwelling units. The building would be located on the eastern half of the project site with surface parking areas located with the western half of the site, and landscaping is proposed around the perimeter of the site. A total of 14 parking stalls are proposed, of which all would be located within the surface parking lot. Access to the site would be provided from SE Petrovitsky Road via one existing curb cut. The proposed building would result in a lot coverage of 20 percent. The building would have a height of 32 feet and 6 inches. There is 1 tree onsite which is proposed for removal. PART TWO: ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS -M with a 14 -day Appeal Period. B. Mitigation Measures 1. The applicant will be required to submit a Temporary Erosion and Sedimentation Control Plan (TESCP) designed pursuant to the State Department of Ecology's Erosion and Sediment Control Requirements, outlined in Volume 11 of the 2001 Stormwater Management Manual. The plan must be submitted to and approved by the Development Services Division Plan Review staff prior to issuance of the utility construction and building permits and during construction. 2. The applicant will be required to comply with the recommendations found in the geotechnical report prepared by Geo Group Northwest, Inc. dated April 20, 2009, during site clearing, grading, and building construction. 3. The applicant shall pay a Parks Mitigation Fee of $354.51 for each new multi -family unit. This fee is estimated at $2,836.08 and shall be payable prior to issuance of a building permit. 4. The applicant shall pay a Traffic Mitigation Fee in the amount of $75.00 for each new net daily trip prior to issuance of a building permit. The fee is estimated to be $4,032.00. 5. The applicant shall pay a Fire Mitigation Fee of $388.00 for each new multi -family residential unit. This fee is estimated to be $3,104.00 which would be payable prior to the issuance of a building permit. C. Exhibits Exhibit 1 Zoning / Vicinity Map Exhibit 2 Site Plan Exhibit 3 North/South Elevations Exhibit 4 East/West Elevations Exhibit 5 Aerial Photograph ERC Report City of Renton Department of Communi Economic Development E. )nmentol Review Committee Report DROFlAKAPARTMENTS LUA09-112, ECF, SA -H Report of October 26, 2009 Page 3 of 5 D. Environmental Impacts The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to hove the following probable impacts: 1. Earth Impacts: The proposed project site is relatively flat, with an overall grade of less than 2 percent. There is an approximate 3-4 foot rockery along the northern property line and another of similar height along the southern property line. The applicant has stated that approximately 450 cubic yards will be graded for the construction of the proposed parking lot, building pads and utilities and will be balanced on-site. The site coverage by impervious surfaces would be 47 percent after project construction. A Geotechnical Engineering Study, prepared by Geo Group Northwest, Inc. dated April 20, 2009, was submitted with the project application. The study notes that dense, glacial till soil was revealed on the site. The soil consists of a concrete -like mixture of sand, silt, and gravel. The till is typically overlain by 2 to 5 feet of medium dense silty sand. The recommendations in the report are based on examination of material from four test pits excavated by backhoe. The report provides recommendations for site preparation, foundations, retaining walls, slabs on grade, drainage considerations, pavement areas, general earthwork, and structural fill. In order to limit impacts to the project site and neighboring properties that could occur during project construction, staff recommends as a mitigation measure that project construction comply with the recommendations found in the geotechnical report prepared by Geo Group Northwest, Inc. dated April 20, 2009. Also due to the potential for erosion to occur from the subject site, the applicant will be required to submit a Temporary Erosion and Sedimentation Control Plan (TESCP) designed pursuant to the State Department of Ecology's Erosion and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual. Mitigation Measures: 1. The applicant will be required to submit a Temporary Erosion and Sedimentation Control Plan (TESCP) designed pursuant to the State Department of Ecology's Erosion and Sediment Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual. The plan must be submitted to and approved by the Development Services Division Plan Review staff prior to issuance of the utility construction and building permits and during construction. 2, The applicant will be required to comply with the recommendations found in the geotechnical report prepared by Geo Group Northwest, Inc. dated April 20, 2009, during site clearing, grading, and building construction. Nexus: SEPA Environmental Regulations; Grading, Excavation and Mining Regulations RMC 4-4-060 2. Storm Water Impacts: The site lies within the Green River drainage basin. Currently, runoff from the project site flows south crossing SE Petrovitsky Road to the south side of the street. Runoff then flows to the east through a well vegetated channel to join Soos Creek and eventually the Green River. The current downstream flow pattern would not be modified by this project. A drainage narrative, prepared by Benjamin P. Anstey, P.E., was submitted with the land use application. However, a drainage report was not submitted with the project application. The engineer is required to submit a drainage report as outlined by the King County Surface Water Drainage Manual as part of the engineering permit application. The report needs to include a sketch of the downstream discharge along with the downstream analysis. The drainage report shall also include the existing impervious area and the new impervious area. The project must provide runoff controls to limit the developer conditions peak rates ERC Report City of Renton Department of Commune Economic Development E mmentol Review Committee Report DROFIAK APARTMENTS LUA09-112, ECF, SA -H Report of October 26, 2009 Page 4 of 5 of runoff to the predevelopment peak rates. In addition the storm report needs to show the calculations that determine if onsite detention is or is not required and it needs to be stamped by a Professional Engineer. The drainage plan is to be designed per the 1990 King County Surface Water Drainage Manual. Mitigation Measures: No Further Mitigation Recommended Nexus: Not Applicable 3. Parks and Recreation Impacts: It can be expected that the project, with 8 new residential units, would have an impact on use of City of Renton parks and recreation facilities. For this reason, a fee structure is in place to provide compensation for such impacts. The Parks Mitigation Fee is $354.51 for each new multi -family unit. The estimated fee would be $2,836.08 (8 units x $354.51= $2,836.08). Mitigation Measures: The applicant shall pay a Parks Mitigation Fee of $354.51 for each new multi -family unit. This fee is estimated at $2,836.08 and shall be payable prior to issuance of building permits. Nexus: Park and Recreation Impact Fee Resolution 3037, SEPA 4. Transportation Impacts: The 8 residential units are anticipated to generate 53.76 new trips daily, including peak hour trips. To mitigate impacts on city streets from this usage, a Transportation Impact Fee would be imposed. The fee, at $75 per trip for the 53.76 new daily trips anticipated, has been estimated at $4,032.00 (53.76 x $75 = $4,032.00). This fee would be payable prior to issuance of the building permit. Mitigation Measures: The applicant shall pay a Traffic Mitigation Fee in the amount of $75.00 for each new net daily trip prior to issuance of building permits. The fee is estimated to be $4,032.00. Nexus: Transportation Impact Fee Resolution 3100; Ordinance 4489; SEPA S. Fire & Police Impacts: The project can be expected to have impacts on fire and police services. Staff recommends a mitigation measure requiring the applicant to pay a Fire Mitigation Fee of $388.00 for each new multi -family residential unit. This fee is estimated to be $3,104.00 (8 units x $388.00 = $3,104.00) which would be payable prior to the issuance of building permits. Mitigation Measures: The applicant shall pay a Fire Mitigation Fee of $388.00 for each new multi -family residential unit. This fee is estimated to be $3,104.00 which would be payable prior to the issuance of building permits. Nexus: Fire Impact Fee Resolution 2895, SEPA E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or "Advisory Notes to Applicant." ✓ Copies of all Review Comments are contained in the Official File and may be attached to this report. Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing on or before 5:00 PM, November 13, 2009. Renton Municipal Code Section 4-8-110.6 governs appeals to the Hearing Examiner. Appeals must be filed in writing at the City Clerk's office along with the required fee. Additional information regarding the appeal process may be obtained from the City Clerk's Office, Renton City Hall - 7th Floor, 1055 S. Grady Way, Renton WA 98057. ERC Report City of Renton Department of Communi Economic Development DROFIAK APARTMENTS Report of October 26, 2009 )nmental Review Committee Report LUA09-112, ECF, SA -N Page 5 of 5 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use actions. Planning: 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 a.m. to 3:30 p.m., Monday through Friday unless otherwise approved by the Development Services Division. Water: 1. This project is located in the Soos Creek Water District service area. The applicant shall submit a Certificate of Water Availability to verify that the District can provide adequate fire flow and domestic water to service the site. 2, Per the City of Renton Fire Marshal the preliminary fire flow is 1,500 GPM. 3. Any new construction must have a fire hydrant capable of delivering a minimum of 1,000 GPM and a primary hydrant shall be located within 150 feet to the front of the building and one additional hydrant shall be located within 300 feet to the front of the building. This distance is measured along a travel route. Additional fire hydrants may be required as a part of this project to meet this criterion. All fire hydrants shall be per the City specifications. These City of Renton requirements are applicable to the entire proposed site regardless of water district boundaries. 4. The existing fire hydrants may need to be fitted with Stortz fittings to bring them up to current City code. Sanitary Sewer: 1. The applicant needs to contact the Soos Creek sanitary sewer district for availability, fees, plan review and permits. 2. Although the Soos Creek district will have the final review and approval the city still needs to see the sewer on the engineering design plans. Surface Water: 1. A conceptual drainage plan and report is required to be submitted with application for engineering permits. 2. The drainage plan is to be designed per the 1990 King County Surface Water Drainage Manual. 3. The report and conceptual plan are not approved at this time. The engineer needs to submit a drainage report as outlined by the KC Manual. The report needs to include a sketch of the downstream discharge along with the downstream analysis. The drainage report needs to include the existing imperious area and the new impervious area. The project must provide runoff controls to limit the developer conditions peak rates of runoff to the predevelopment peak rates. 4. The storm report needs to show the calculations that determine if onsite detention is or is not required and it needs to be stamped by a PE. 5. The Surface Water SDC fees are $0.405 (but not less than $1,012) per square foot of new impervious area. These fees are collected at the time a construction permit is issued. Transportation: 1. Engineering plans will need to be submitted for the new driveway approaches along with any new or repaired sidewalk. 2. A Traffic Mitigation fee shall be assessed as appropriate and payable with the final plat. Miscellaneous: 1. Construction plan indicating haul route and hours, construction hours and a traffic control plan shall be submitted for approval prior to any permit being issued. 2. Separate permits and fees for side sewer, domestic water meter, landscape irrigation meter, and any backflow devices will be required. 3. All plans shall be tied to a minimum of two horizontal and vertical controls per the City's current horizontal and vertical control network. ERC Report G5 - 21 T23N R5E W 112 I SE 101st 51 v R.8 9E 102nd St - .•.. - "'", •' R� R -B ft 8a — - _ _ -- - - 4- '-- - BE 103rd S7 SE �.. I p 64th St R R -B ... SE 105th St E - I - v L u, 11651h01h SI s B ifift 7R-8 ft \ s I \ — se +ann s1 \ Cts N I - R-8 _ - -_ BE 167th St � m Cn _ N � z BE ,00th St N CA ! - ---R�: a C!1 R-8 I / CA R-8 _ - — R -B ., r .....,. I ! 1... E, CA i SE 172M Si SE 172M Ln R-8 - € .....,...., ....... _ f I ..,....... r : ti73rd 5t _ - - $'y ) RM.F— §� N ' R-10 IR$ s I �Ci R q ....... I ` SST rm R.1 D 10 { -7 45F SE 5750; _ SE 775th RM -F I SE PeeoahkY Rd w K I RC EXHIBIT 1 .5 - 33 T23N R5E W 112 H 5 ZONING ;.t ; PW TECIINICA1. SERVICES 0 2� Feet 28 T23N R5E W 1/2 FT 07!15108 1 *800 1328