HomeMy WebLinkAbout0895.06 DFR 156-160.pdf
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
To: RJ Development Date: April 2, 2020
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
Copies Date Description
1 3/19-3/24/20 Daily Field Report(s) # 156-160
Comments:
CC:
1: John Wilson ATTN: johnw@rinocon.com
2: Mark Richardson ATTN: mark@accrete.build
3: Jeff Brain ATTN: jeff@accrete.build
4: Jennifer Vogele ATTN: jennifer@accrete.build
5: Jonathan Chavez ATTN: jchavez@rentonwa.gov
6: Joe W ATTN: joew@accrete.build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 156
Time On Site Time Off Site Date Day of Week
11:00 AM 3:30 PM
3/19/20 Thursday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe cut slopes and test footing backfill.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12” lifts and compacted with a jumping jack or a hoe pack when able. Rep took compaction tests on backfill and
observed material to be adequate (at least 95% of its maximum dry density that was adjusted based on calculations
with the cement treatment) (Fig 1) (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 156
Time On Site Time Off Site Date Day of Week
11:00 AM 3:30 PM
3/19/20 Thursday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Number
Test Location
(Footing Backfill) Elevation
Reference
Compaction
Curve
Maximum
Dry Density
(pcf)
Fill
Moisture
(%)
Test
Dry Density
(pcf)
% of
Maximum
Dry Density
144 See map for approximate location -2 SG 2 125.7 21.5 119.1 95
145 See map for approximate location -2 SG 2 125.7 20.1 119.0 95
146 See map for approximate location -2 SG 2 125.7 19.5 119.6 95
147 See map for approximate location -2 SG 2 125.7 19.9 121.2 96
148 See map for approximate location SG 2 125.7 20.6 120.6 96
149 See map for approximate location SG 2 125.7 18.7 119.2 95
150 See map for approximate location SG 2 125.7 19.1 118.7 95
151 See map for approximate location SG 2 125.7 20.2 122.3 97
2/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 156
Time On Site Time Off Site Date Day of Week
11:00 AM 3:30 PM
3/19/20 Thursday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Fig. 1 Approximate location of compaction tests on footing backfill CTB material
146
145
144
147 14
149
150
151
3/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 157
Time On Site Time Off Site Date Day of Week
11:00 AM 3:00 PM
3/20/20 Friday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe cut slopes and test footing backfill.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix (Fig 1). Rep observed contractor
place 12” lifts and compacted with a jumping jack or a hoe pack when able. Rep took compaction tests on backfill
and observed material to be adequate (at least 95% of its maximum dry density that was adjusted based on
calculations with the cement treatment) (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
Fig. 1 Contractor placing 5/8’’ crushed rock and geotextile along wall before backfilling with CTB
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 157
Time On Site Time Off Site Date Day of Week
11:00 AM 3:00 PM
3/20/20 Friday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Number
Test Location
(Footing Backfill) Elevation
Reference
Compaction
Curve
Maximum
Dry Density
(pcf)
Fill
Moisture
(%)
Test
Dry Density
(pcf)
% of
Maximum
Dry Density
152 See map for approximate location -4 SG 1 130.7 18.9 125.9 96
153 See map for approximate location -4 SG 1 130.7 21.1 125.4 96
154 See map for approximate location -2 SG 1 130.7 17.5 126.2 96
155 See map for approximate location -2 SG 1 130.7 19.3 128.5 98
156 See map for approximate location SG 1 130.7 20.2 127.0 97
157 See map for approximate location SG 1 130.7 19.7 124.8 95
Fig. 2 Approximate location of compaction tests on footing backfill CTB material
2/2
153
154
155
156
157
152
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 158
Time On Site Time Off Site Date Day of Week
11:00 AM 3:00 PM
3/23/20 Monday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe cut slopes and test footing backfill.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix (Fig 1). Rep observed contractor
place 12” lifts and compacted with a jumping jack or a hoe pack when able. Rep took compaction tests on backfill
and observed material to be adequate (at least 95% of its maximum dry density that was adjusted based on
calculations with the cement treatment) (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 158
Time On Site Time Off Site Date Day of Week
11:00 AM 3:00 PM
3/23/20 Monday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Number
Test Location
(Footing Backfill) Elevation
Reference
Compaction
Curve
Maximum
Dry Density
(pcf)
Fill
Moisture
(%)
Test
Dry Density
(pcf)
% of
Maximum
Dry Density
158 See map for approximate location -10 SG 1 130.7 20.4 126.0 96
159 See map for approximate location -10 SG 1 130.7 19.7 129.1 98
160 See map for approximate location -10 SG 1 130.7 16.9 130.0 98
161 See map for approximate location -8 SG 1 130.7 18.3 125.1 95
162 See map for approximate location -8 SG 1 130.7 17.8 126.8 97
163 See map for approximate location -8 SG 1 130.7 19.5 124.9 95
164 See map for approximate location -6 SG 1 130.7 20.0 129.2 98
165 See map for approximate location -6 SG 1 130.7 21.6 128.7 98
166 See map for approximate location -6 SG 1 130.7 21.4 126.0 96
167 See map for approximate location -4 SG 1 130.7 15.7 127.8 97
168 See map for approximate location -4 SG 1 130.7 19.2 127.3 97
169 See map for approximate location -4 SG 1 130.7 18.9 124.6 95
170 See map for approximate location -2 SG 1 130.7 17.8 126.9 97
171 See map for approximate location -2 SG 1 130.7 20.2 129.0 98
172 See map for approximate location -2 SG 1 130.7 21.2 128.2 98
2/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 158
Time On Site Time Off Site Date Day of Week
11:00 AM 3:00 PM
3/23/20 Monday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Fig. 2 Approximate location of compaction tests on footing backfill CTB material
Area of compaction tests 158-172
3/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 159
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM
3/24/20 Tuesday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe cut slopes and test footing backfill.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix (Fig 1). Rep observed contractor
place 12” lifts and compacted with a jumping jack or a hoe pack when able. Rep took compaction tests on backfill
and observed material to be adequate (at least 95% of its maximum dry density that was adjusted based on
calculations with the cement treatment) (133.1 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 159
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM
3/24/20 Tuesday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Number
Test Location
(Footing Backfill) Elevation
Reference
Compaction
Curve
Maximum
Dry Density
(pcf)
Fill
Moisture
(%)
Test
Dry Density
(pcf)
% of
Maximum
Dry Density
173 See map for approximate location -9 SG 2 133.1 20.3 130.1 97
174 See map for approximate location -9SG 2 133.1 19.6 129.3 97
175 See map for approximate location -9 SG 2 133.1 17.8 128.9 96
176 See map for approximate location -7 SG 2 133.1 20.7 126.8 95
177 See map for approximate location -7 SG 2 133.1 19.2 127.1 95
178 See map for approximate location -7 SG 2 133.1 19.3 126.2 95
179 See map for approximate location -5 SG 2 133.1 20.1 131.0 98
180 See map for approximate location -5 SG 2 133.1 19.6 128.4 96
181 See map for approximate location -3 SG 2 133.1 19.0 127.7 95
2/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 159
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM
3/24/20 Tuesday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Fig. 2 Approximate location of compaction tests on footing backfill CTB material
173
174 175 176
177
178
179 180
181
3/3
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 160
Time On Site Time Off Site Date Day of Week
11:00 AM 12:00 PM
3/24/20 Wednesday
Travel Time Weather
1.00Hr. RT 40s, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe cut slopes and test footing backfill.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
No footing backfill or compaction was in progress onsite.
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/1