Loading...
HomeMy WebLinkAboutMFP19006535.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP19006535 IVR Number: 19006535 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:12/09/2019Application Date:3023059067Parcel Number: 3400 EAST VALLEY RD Permit Type:04/03/2020Issue Date:Franchise Permit Work Class:04/05/2021Expiration Date:Major Utility Job Number: 111025457Franchise Type:Electric Description: Upgrading 3 existing transmission Poles to taller poles to meet clearances for new customer lights. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL D & C INVESTMENTS 555 SW GRADY WY RENTON , WA 98057 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 111025457 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 3400 E VALLEY RD WORKING IN THE ROW UPGRADING 3 EXISTING TRANSMISSION POLES (316746-165792) (316714-165791),(316686-165790) TO TALLER POLES TO MEET CLEARANCES FOR NEW CUSTOMER LIGHTS NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED ✔✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.09 14:55:42 -08'00'12/9/19 MFP19006535 Scott Warlick 3/19/2020 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 111025457 Potelco, Inc FABIAN GOMEZ (206) 573-0031 6905 S 228th St, Kent, WA 98032 FABIAN.GOMEZ@PSE.COM 3400 E VALLEY RD TBD TBD CORRIE RYDBERG 12/9/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.09 14:55:26 -08'00' MFP19006535 Monday - Friday 8:00AM - 3:00PM Scott Warlick 4/3/2020 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). Plotted:11/15/2019@8:57:30 AMzktabat111025457.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG PROJECT PHASE ORDER#POWERNOTIFICATION SUPERIOR CAPITAL REMOVAL EXPENSE ST LIGHT "Locates Required" "Outages Required" "Flagging Required" Yes Yes Yes No No No DESCRIPTIONREV#DATE BY 3 2 1 FUNCTION CONTACT PHONE NO DATE PROJECT MGR ENGR-POWER DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING REAL ESTATE/EASEMENT PERMIT FOREMAN (Check Box if Complete) INSTALLED & VERIFIED LOCKED/SECURED CLEAN/SAFE RED-LINED CHANGES PRIMARY RECORDED PHASEFUSE SIZE GRID, CABLE AND SWITCH NUMBERS . FIELD CHANGES ON AS-BUILTS. MATERIAL VERIFIED AND NOTED ON PAPERWORK. TOTAL CABLE NOTED ON AS-BUILT. COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT. Foreman's Signature Company Employee ID# DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON PSE EQUIPMENT & WORK AREA LEFT IN CONDITION. INDICATE CORRECT ON AS-BUILT & VERIFY PROPER . UTILITIES CONTACT PHONE# INCIDENT # SAP ORDER NUMBER JOINT FACILITIES ARRANGEMENTS PAGESCALE REV # 1"=100' ENGINEERING ELECTRIC SYSTEM TLN #COUNTY TSG MAP POWER WK CTR 1/4 SEC OH CIRC MAP UG CIRC MAP U-MAP CIRCUIT NO. /2 02 425-516-3525 714-699-0866 11/15/19TRANSMISSION DRAWING SOURCE:T-00108 sh 2 SW 34TH ST & E VALLEY RD RENTON, WA 98057 206-573-0031 T-00108111025457111025457 56KING 111025457 108116665 571016793 2305E120 TALBOT HILL - OBRIEN #2 (115 KV) T. MARTINYUK K. TABAT 508174730 F. GOMEZ Sec30 T23 R05E 07C PRECONSTRUCTION WORK DRAWINGS AND DOCUMENTS SAFETY AT ALL TIMES. - WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE COMPLETION OF JOB. - RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH. - MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE GENERAL NOTES PROJECT NOTES VERT W/ W UG TPLX XMSN XFMR X-FER TERM TEL/TV TAN SW# SW GRDS SWBD S SA SGL SVC R/C REMV REPL RELOC PRI PTP PH OH N NEUT MT LB LATL INST E DWN GUY DDE DA DBL DISC DE C/O CU C/N CL CHG BRKT ANCH VERTICAL WITH WEST UNDERGROUND TRIPLEX TRANSMISSION TRANSFORMER TRANSFER TERMINATION TELEPHONE/TELEVISION TANGENT SWITCH NUMBER SWITCH GROUNDS SWITCH BOARDS SOUTH SINGLE ARM SINGLE SERVICE RIGID CLEVIS REMOVE REPLACE RELOCATE PRIMARY POLE TOP PIN PHASE OVERHEAD NORTH NEUTRAL MOUNT LOADBREAK LATERAL INSTALL EAST DOWN GUY DOUBLE DEADEND DOUBLE ARM DOUBLE DISCONNECT DEADEND CUTOUT COPPER COMMON NEUTRAL CLASS CHANGE BRACKET ANCHOR ABBREVIATION KEYTRANSMISSION SYMBOL LEGEND CONSTRUCTION NOTES LINE CROSSING (PROFILE) STREET LIGHT WITH POLE STREET LIGHT PUSH BRACE SPAN GUY MULTIPLE DOWN GUYS DOWN GUY REMOVED CONDUCTOR NEW CONDUCTOR EXISTING 230KV CONDUCTOR EXISTING 115KV CONDUCTOR EXISTING 55KV CONDUCTOR NEW LATTICE TOWER EXISTING LATTICE TOWER NEW STEEL POLE EXISTING STEEL POLE NEW LAMINATE POLE EXISTING LAMINATE POLE REMOVED POLE NEW POLE EXISTING POLE VICINITY MAP - RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE. IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS. TO PSE STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY - RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE MATERIALS, EQUIPMENT AND PACKING SHALL BE REMOVED DAILY. - WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST. - ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES ENGINEER: TARAS MARTINYUK PHONE: 425-516-3525 WITH PERMIT REGULATIONS AND LOCAL TRAFFIC REGULATIONS. - PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE INSTRUCTED BY THE SYSTEM OPERATOR. RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE - PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND - REFER TO PSE STANDARDS 6275.xxxx FOR SYSTEM GROUND REQUIREMENTS. DISTRIBUTION SYMBOL LEGEND - SEE 0300.1000 FIGURE 5 FOR REFERENCED IN THIS DRAWING. - DESIGN DETAILS AND NOTES SHALL SUPPLEMENT THE STANDARDS ANY AND ALL CONSTRUCTION CHANGES. INFORMATION. THE ENGINEER SHALL HAVE SOLE AUTHORITY TO APPROVE - THE ENGINEER SHALL BE CONTACTED WITH REGARDS TO ALL TECHNICAL FOR WOOD POLES CONSTRUCTION, DWG D-12842 SH 1 OF 1. - ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARD NOTES PROJECT SCOPE 1 BY THE PROJECT MANAGER. HAVE BEEN SECURED. FINAL NOTIFICATION TO PROCEED SHALL BE GIVEN - WORK SHALL NOT BEGIN UNTIL ALL EASEMENTS AND STREET USE PERMITS "TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL". THE MINIMAL REQUIREMENTS SPECIFIED IN PSE STD 0150.3200 - EROSION CONTROL PROCEDURES SHALL BE USED IN ACCORDANCE WITH - NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE. IN ADVANCE. SWITCHING SHALL BE SCHEDULED WITH THE LOAD OFFICE A MINIMUM OF 3 WEEKS OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE. ALL TRANSMISSION SYSTEM - ALL DISTRIBUTION SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM IN RIGHT-OF-WAY INVOLVING A PERMIT. OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK - NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, - REPLACE 3 TRANSMISSION POLES FOR NEW CUSTOMER STREET LIGHTS GRE E NRIVER SE 31ST ST SHUFF - O'BRIEN 115kV(DE-ENERGIZED) TALBOT-ASBURY (SCL SECTION) RENTON OLYMPIC PARK VICTORIA HILLS ROLLING JCT. RENTON ORILLIA STA. CABLE NELSEN file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Cable Sta Click to see One Line Diagram PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram 181 2930 25 36 31 32R 5 ER 4 EBNSF RAILWAYAREA CONSTRUCTION AREA CONSTRUCTION 167 515 ES EVA HT 801 S EVA HT08TS DR34 ES )TS HT081 S(DR YELLAV ETS TS14 WS TS HT43 WSWS EVA ELADSKAOTS HT72 WS DR YELLAV ETS TS12 S ST 180TH S S DR YELLAVDR RRAC ES DR RRAC S ES HT671 ES ES EVA HT801S RD N O SNEBS DR TOBLATWS EVA DNILNEIRB'O - LLIH TOBLATREHPOTSIRHC - LLIH TOBLATBER RY D A L E #3 TALBOT HIL L-SO UTH SUB #2 SCL COVINGTON-METRO RENTONO'BRIEN - 111025457.dgn 11/15/2019 8:57:30 AM 11/19/19 11/19/2019 MFP19006535 Plotted:11/15/2019@8:57:30 AMzktabat111025457.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG PROJECT PHASE ORDER#POWERNOTIFICATION SUPERIOR CAPITAL REMOVAL EXPENSE ST LIGHT "Locates Required" "Outages Required" "Flagging Required" Yes Yes Yes No No No DESCRIPTIONREV#DATE BY 3 2 1 FUNCTION CONTACT PHONE NO DATE PROJECT MGR ENGR-POWER DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING REAL ESTATE/EASEMENT PERMIT FOREMAN (Check Box if Complete) INSTALLED & VERIFIED LOCKED/SECURED CLEAN/SAFE RED-LINED CHANGES PRIMARY RECORDED PHASEFUSE SIZE GRID, CABLE AND SWITCH NUMBERS . FIELD CHANGES ON AS-BUILTS. MATERIAL VERIFIED AND NOTED ON PAPERWORK. TOTAL CABLE NOTED ON AS-BUILT. COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT. Foreman's Signature Company Employee ID# DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON PSE EQUIPMENT & WORK AREA LEFT IN CONDITION. INDICATE CORRECT ON AS-BUILT & VERIFY PROPER . UTILITIES CONTACT PHONE# INCIDENT # SAP ORDER NUMBER JOINT FACILITIES ARRANGEMENTS PAGESCALE REV # 1"=100' ENGINEERING ELECTRIC SYSTEM TLN #COUNTY TSG MAP POWER WK CTR 1/4 SEC OH CIRC MAP UG CIRC MAP U-MAP CIRCUIT NO. /2 02 425-516-3525 714-699-0866 11/15/19TRANSMISSION DRAWING SOURCE:T-00108 sh 2 SW 34TH ST & E VALLEY RD RENTON, WA 98057 206-573-0031 T-00108111025457111025457 56KING 111025457 108116665 571016793 2305E120 TALBOT HILL - OBRIEN #2 (115 KV) T. MARTINYUK K. TABAT 508174730 F. GOMEZ Sec30 T23 R05E 07C DR YELLAV ESW 34TH ST2/3 120+132/4 117+142/5 114+012/6 110+932/7 107+65STL #1 DOUBLE LIGHTSTL #2 SINGLE LIGHTSTL #3 DOUBLE LIGHTSTL #4 SINGLE LIGHTSTL #5 DOUBLE LIGHT299' 313' 217' 328' 117+14 80/1 HPA 2/4 114+01 85/1 HPA 2/5 120+13 60/2 HPA-C 2/3 110+93 80/1 HPA 2/6 107+65 60/2 HPA-C 2/7 308' 64' 84'86' 84'74' 12' 4500# NESC MEDIUM RS=292' 795 KCMIL ACSR 45/7 TERN 2 PROFILE SCALE 1002003004000VERT : 1"= 20' HORIZ : 1"= 200'10015020001"= 100'50PLAN SCALE REMARKS POLE RETIREMENT TABLE 2/6 2/5 2/4 60 60 60 2 2 2 316686-165790 316714-165791 316746-165792 STAKE NO POLE OR GRID NUMBER CLASS POLE TEL TV FIBER ID NUMBERTRANRMVD 1983 1983 1983 TOPPED RMVD POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS LENGTH POLE INSTALLED YEAR 105+00 110+00 115+00 120+00 125+00 100 50 0 100 50 0 POLE TABLE STATION TYPE REMARKSACTIONGRID NUMBER 2/3 2/4 2/5 2/6 2/7 EXIST REPLACE REPLACE REPLACE EXIST 2 1 1 1 2 HPA-C HPA HPA HPA HPA-C 6085.2000 6085.1000 6085.1000 6085.1000 6085.2000 316776-165792 316746-165792 316714-165791 316686-165790 316654-165789 DEEPSET 2' DEEPSET 2' PRACTICE STANDARD POLE TOP FROM FRAMING DIST.DRILLING SPECIFICATIONS 1025.1400CLASS POLE LENGTH POLE NO STAKE OR POLE FIG.18 FIG.10 FIG.10 FIG.10 FIG.18 60 80 85 80 60 120+13 117+14 114+01 110+93 107+65 TEMP DESIGN TRANS 100°C 100°C 100°C 100°C 100°C 111025457.dgn 11/15/2019 8:57:30 AM 11/19/19 11/19/2019 MFP19006535 RR11 12 11 EAST VALLEY RDSW 34TH ST 11 12 11 P01 # 3400 EAST VALLEY RDSHOULDER WORK W21-5UTILITY WORKAHEAD W21-7350'350'UTILITYWORKAHEADW21-7 350'UTILITYWORKAHEADW21-7350'R9-9SIDEWALK CLOSED R9-9SIDEWALKCLOSEDAHEAD USE OTHER SIDE SIDEWALK CLOSEDAHEAD USE OTHER SIDESIDEWALK CLOSEDCHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY -O%#111025457 3400 E Valley Road, Renton, WA 11/8/2019 nick.klyzhko@pse.com (425) 424-7796 SHEET 1 of 3 TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP19006535 RR11 12 11 EAST VALLEY RDSW 34TH ST 11 12 11 P02 # 3400 EAST VALLEY RDUTILITYWORKAHEADW21-7 350'350'350'R9-9SIDEWALK CLOSED R9-9SIDEWALKCLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDSHOULDER WORK W21-5UTILITY WORK AHEAD W21-7AHEAD USE OTHER SIDE SIDEWALK CLOSEDUTILITYWORKAHEADW21-7350'CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY -O%#111025457 3400 E Valley Road, Renton, WA 11/8/2019 nick.klyzhko@pse.com (425) 424-7796 SHEET 2 of 3 TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP19006535 RRSW 34TH ST 11 12 11 P03 # 3400EAST VALLEY RD350'350'350'350'350'R9-9SIDEWALK CLOSED R9-9SIDEWALKCLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDSHOULDER WORK W21-5UTILITY WORKAHEAD W21-7AHEAD USE OTHER SIDE SIDEWALK CLOSEDUTILITYWORKAHEADW21-7350'CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY -O%#111025457 3400 E Valley Road, Renton, WA 11/8/2019 nick.klyzhko@pse.com (425) 424-7796 SHEET 3 of 3 TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP19006535 To: City of Renton; Franchise Permits Attn: Holly Powers RE: PSE Job Number #111025457, #105093581 Permit #: LOCATION OF WORK: 3400 E Valley RD, Renton WA 98057 SCOPE OF WORK: We are requesting a permit for 3 pole replacements and a transformer upgrade. The City of Renton has informed our customer that part of the frontage improvement needs to include the proper street lighting. In this case we would need to install taller poles to accomidate the proper clearance from our high voltage conductor and the street lights. There will be three poles that will be affected. See attached design for reference. Also we will be upgrading the existing transformer on private property and might need to use a lane or the side walk to complete work for our trucks. Give me a call if there are any further questions on the work to be done. Sincerely, Fabian Gomez Puget Sound Energy Project Manager Customer & System Projects Cell: (206) 573-0031 Fabian.gomez@pse.com April 3, 2020 Fabian Gomez Puget Sound Energy - Electric P.O. Box 97034 Bellevue, WA 98009-9734 Via Email: Fabian.gomez@pse.com SUBJECT: Request for Undergrounding Exemption (PSE#111025457, MFP19006535, 3400 East Valley Rd) Dear Mr. Gomez: The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. PSE proposes to have Potelco Inc. replace 3 Transmission Poles providing more than 55kv of voltage along the frontage of 3400 East Valley Rd. in order to provide height clearance for new street lighting. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area. The proposal would replace 3 existing transmission poles that provide greater than 55kv of voltage in order to provide the height clearance necessary to install street lighting beneath the transmission lines. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(c) which allows for transmission systems greater than 55kv voltage to remain above ground. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(c). PSE Electric #11025457 Page 2 of 2 April 3, 2020 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, April 17, 2020. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Sandy Leek, PSE, sandy.leek@pse.com Corrie Rydberg, PSE, Corrie.Rydberg@pse.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP19006535 Engineering 1 Engineering General Conditions Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2 Engineering General Conditions Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 Engineering General Conditions A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. Page 1 of 1