Major Franchise Permit: MFP19006535
IVR Number: 19006535
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/09/2019Application Date:3023059067Parcel Number: 3400 EAST VALLEY RD
Permit Type:04/03/2020Issue Date:Franchise
Permit Work Class:04/05/2021Expiration Date:Major Utility
Job Number: 111025457Franchise Type:Electric
Description: Upgrading 3 existing transmission Poles to taller poles to meet clearances for new customer lights. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (425) 892-0416Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
D & C INVESTMENTS 555 SW GRADY WY
RENTON , WA 98057
Owner
Marita Bond
Puget Sound Energy - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
111025457
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
3400 E VALLEY RD
WORKING IN THE ROW UPGRADING 3 EXISTING TRANSMISSION POLES (316746-165792)
(316714-165791),(316686-165790) TO TALLER POLES TO MEET CLEARANCES FOR NEW CUSTOMER LIGHTS
NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED
✔✔✔
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.09 14:55:42 -08'00'12/9/19
MFP19006535
Scott Warlick 3/19/2020
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
111025457
Potelco, Inc
FABIAN GOMEZ (206) 573-0031
6905 S 228th St, Kent, WA 98032
FABIAN.GOMEZ@PSE.COM
3400 E VALLEY RD
TBD
TBD
CORRIE RYDBERG
12/9/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.12.09 14:55:26 -08'00'
MFP19006535
Monday - Friday
8:00AM - 3:00PM Scott Warlick
4/3/2020
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Plotted:11/15/2019@8:57:30 AMzktabat111025457.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
ST LIGHT
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
1"=100'
ENGINEERING
ELECTRIC SYSTEM
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
/2
02
425-516-3525
714-699-0866 11/15/19TRANSMISSION DRAWING SOURCE:T-00108 sh 2 SW 34TH ST & E VALLEY RD
RENTON, WA 98057
206-573-0031 T-00108111025457111025457
56KING
111025457
108116665
571016793
2305E120
TALBOT HILL - OBRIEN #2 (115 KV)
T. MARTINYUK
K. TABAT
508174730
F. GOMEZ
Sec30 T23 R05E
07C
PRECONSTRUCTION
WORK DRAWINGS AND DOCUMENTS
SAFETY
AT ALL TIMES.
- WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE
COMPLETION OF JOB.
- RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT
INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH.
- MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE
GENERAL NOTES PROJECT NOTES
VERT
W/
W
UG
TPLX
XMSN
XFMR
X-FER
TERM
TEL/TV
TAN
SW#
SW GRDS
SWBD
S
SA
SGL
SVC
R/C
REMV
REPL
RELOC
PRI
PTP
PH
OH
N
NEUT
MT
LB
LATL
INST
E
DWN GUY
DDE
DA
DBL
DISC
DE
C/O
CU
C/N
CL
CHG
BRKT
ANCH
VERTICAL
WITH
WEST
UNDERGROUND
TRIPLEX
TRANSMISSION
TRANSFORMER
TRANSFER
TERMINATION
TELEPHONE/TELEVISION
TANGENT
SWITCH NUMBER
SWITCH GROUNDS
SWITCH BOARDS
SOUTH
SINGLE ARM
SINGLE
SERVICE
RIGID CLEVIS
REMOVE
REPLACE
RELOCATE
PRIMARY
POLE TOP PIN
PHASE
OVERHEAD
NORTH
NEUTRAL
MOUNT
LOADBREAK
LATERAL
INSTALL
EAST
DOWN GUY
DOUBLE DEADEND
DOUBLE ARM
DOUBLE
DISCONNECT
DEADEND
CUTOUT
COPPER
COMMON NEUTRAL
CLASS
CHANGE
BRACKET
ANCHOR
ABBREVIATION KEYTRANSMISSION SYMBOL LEGEND
CONSTRUCTION NOTES
LINE CROSSING (PROFILE)
STREET LIGHT WITH POLE
STREET LIGHT
PUSH BRACE
SPAN GUY
MULTIPLE DOWN GUYS
DOWN GUY
REMOVED CONDUCTOR
NEW CONDUCTOR
EXISTING 230KV CONDUCTOR
EXISTING 115KV CONDUCTOR
EXISTING 55KV CONDUCTOR
NEW LATTICE TOWER
EXISTING LATTICE TOWER
NEW STEEL POLE
EXISTING STEEL POLE
NEW LAMINATE POLE
EXISTING LAMINATE POLE
REMOVED POLE
NEW POLE
EXISTING POLE
VICINITY MAP
- RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE.
IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
TO PSE STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY
- RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE
MATERIALS, EQUIPMENT AND PACKING SHALL BE REMOVED DAILY.
- WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION
OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST.
- ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES ENGINEER: TARAS MARTINYUK PHONE: 425-516-3525
WITH PERMIT REGULATIONS AND LOCAL TRAFFIC REGULATIONS.
- PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE
INSTRUCTED BY THE SYSTEM OPERATOR.
RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE
- PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND
- REFER TO PSE STANDARDS 6275.xxxx FOR SYSTEM GROUND REQUIREMENTS.
DISTRIBUTION SYMBOL LEGEND
- SEE 0300.1000 FIGURE 5 FOR
REFERENCED IN THIS DRAWING.
- DESIGN DETAILS AND NOTES SHALL SUPPLEMENT THE STANDARDS
ANY AND ALL CONSTRUCTION CHANGES.
INFORMATION. THE ENGINEER SHALL HAVE SOLE AUTHORITY TO APPROVE
- THE ENGINEER SHALL BE CONTACTED WITH REGARDS TO ALL TECHNICAL
FOR WOOD POLES CONSTRUCTION, DWG D-12842 SH 1 OF 1.
- ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARD NOTES
PROJECT SCOPE
1
BY THE PROJECT MANAGER.
HAVE BEEN SECURED. FINAL NOTIFICATION TO PROCEED SHALL BE GIVEN
- WORK SHALL NOT BEGIN UNTIL ALL EASEMENTS AND STREET USE PERMITS
"TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL".
THE MINIMAL REQUIREMENTS SPECIFIED IN PSE STD 0150.3200
- EROSION CONTROL PROCEDURES SHALL BE USED IN ACCORDANCE WITH
- NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
IN ADVANCE.
SWITCHING SHALL BE SCHEDULED WITH THE LOAD OFFICE A MINIMUM OF 3 WEEKS
OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE. ALL TRANSMISSION SYSTEM
- ALL DISTRIBUTION SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM
IN RIGHT-OF-WAY INVOLVING A PERMIT.
OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK
- NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS,
- REPLACE 3 TRANSMISSION POLES FOR NEW CUSTOMER STREET LIGHTS
GRE E NRIVER
SE
31ST
ST
SHUFF - O'BRIEN 115kV(DE-ENERGIZED)
TALBOT-ASBURY
(SCL SECTION)
RENTON
OLYMPIC
PARK
VICTORIA
HILLS
ROLLING
JCT.
RENTON
ORILLIA
STA.
CABLE
NELSEN
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svfPSE Cable Sta Click to see One Line Diagram
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/SVF/sml_??.svf
PSE Dist Sta Click to see One Line Diagramfile://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdf
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram
file://sgen000b/cad/ELECTRIC/PSEWEB/TSOLD/pdf/sml_??.pdfPSE Dist Sta Click to see One Line Diagram
181 2930
25
36 31 32R 5 ER 4 EBNSF RAILWAYAREA
CONSTRUCTION
AREA
CONSTRUCTION
167
515
ES
EVA HT
801
S EVA HT08TS DR34 ES
)TS HT081 S(DR YELLAV ETS TS14 WS
TS HT43 WSWS EVA ELADSKAOTS HT72 WS
DR YELLAV ETS TS12 S
ST
180TH
S S DR YELLAVDR RRAC ES
DR RRAC S
ES HT671 ES
ES EVA HT801S RD N
O
SNEBS DR TOBLATWS EVA DNILNEIRB'O - LLIH TOBLATREHPOTSIRHC - LLIH TOBLATBER
RY
D
A
L
E #3
TALBOT HIL
L-SO
UTH SUB #2
SCL COVINGTON-METRO RENTONO'BRIEN - 111025457.dgn 11/15/2019 8:57:30 AM
11/19/19
11/19/2019
MFP19006535
Plotted:11/15/2019@8:57:30 AMzktabat111025457.dgnASBUILT TO:THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES
CALL (800)424-5555 2 BUSINESS DAYS BEFORE YOU DIG
PROJECT PHASE ORDER#POWERNOTIFICATION
SUPERIOR
CAPITAL
REMOVAL
EXPENSE
ST LIGHT
"Locates Required"
"Outages Required"
"Flagging Required"
Yes
Yes
Yes
No
No
No
DESCRIPTIONREV#DATE BY
3
2
1
FUNCTION CONTACT PHONE NO DATE
PROJECT MGR
ENGR-POWER
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
REAL ESTATE/EASEMENT PERMIT
FOREMAN (Check Box if Complete)
INSTALLED & VERIFIED
LOCKED/SECURED CLEAN/SAFE
RED-LINED
CHANGES
PRIMARY
RECORDED
PHASEFUSE SIZE
GRID, CABLE AND SWITCH NUMBERS .
FIELD CHANGES ON AS-BUILTS.
MATERIAL VERIFIED AND NOTED ON PAPERWORK.
TOTAL CABLE NOTED ON AS-BUILT.
COMPANY ID #'s IN CORRECT LOCATION ON AS-BUILT.
Foreman's Signature
Company Employee ID#
DEVIATIONS NOTED ON THE AS-BUILT AND THEIR REASON
PSE EQUIPMENT & WORK AREA LEFT IN CONDITION.
INDICATE CORRECT ON AS-BUILT & VERIFY PROPER .
UTILITIES
CONTACT
PHONE#
INCIDENT #
SAP ORDER NUMBER
JOINT FACILITIES ARRANGEMENTS
PAGESCALE
REV #
1"=100'
ENGINEERING
ELECTRIC SYSTEM
TLN #COUNTY TSG MAP POWER WK CTR
1/4 SEC OH CIRC MAP UG CIRC MAP
U-MAP CIRCUIT NO.
/2
02
425-516-3525
714-699-0866 11/15/19TRANSMISSION DRAWING SOURCE:T-00108 sh 2 SW 34TH ST & E VALLEY RD
RENTON, WA 98057
206-573-0031 T-00108111025457111025457
56KING
111025457
108116665
571016793
2305E120
TALBOT HILL - OBRIEN #2 (115 KV)
T. MARTINYUK
K. TABAT
508174730
F. GOMEZ
Sec30 T23 R05E
07C
DR YELLAV ESW 34TH ST2/3 120+132/4 117+142/5 114+012/6 110+932/7 107+65STL #1 DOUBLE LIGHTSTL #2 SINGLE LIGHTSTL #3 DOUBLE LIGHTSTL #4 SINGLE LIGHTSTL #5 DOUBLE LIGHT299'
313'
217'
328'
117+14
80/1
HPA
2/4
114+01
85/1
HPA
2/5
120+13
60/2
HPA-C
2/3
110+93
80/1
HPA
2/6
107+65
60/2
HPA-C
2/7
308'
64'
84'86'
84'74'
12'
4500# NESC MEDIUM RS=292'
795 KCMIL ACSR 45/7 TERN
2
PROFILE SCALE
1002003004000VERT : 1"= 20'
HORIZ : 1"= 200'10015020001"= 100'50PLAN SCALE
REMARKS
POLE RETIREMENT TABLE
2/6
2/5
2/4
60
60
60
2
2
2
316686-165790
316714-165791
316746-165792
STAKE NO
POLE OR GRID NUMBER
CLASS
POLE
TEL TV FIBER ID NUMBERTRANRMVD
1983
1983
1983
TOPPED RMVD
POLE DATA TEMP TRANSFERS ST. LIGHT TRANSFERS
LENGTH
POLE
INSTALLED
YEAR
105+00 110+00 115+00 120+00 125+00 100
50
0
100
50
0
POLE TABLE
STATION TYPE REMARKSACTIONGRID NUMBER
2/3
2/4
2/5
2/6
2/7
EXIST
REPLACE
REPLACE
REPLACE
EXIST
2
1
1
1
2
HPA-C
HPA
HPA
HPA
HPA-C
6085.2000
6085.1000
6085.1000
6085.1000
6085.2000
316776-165792
316746-165792
316714-165791
316686-165790
316654-165789
DEEPSET 2'
DEEPSET 2'
PRACTICE
STANDARD
POLE TOP
FROM
FRAMING
DIST.DRILLING
SPECIFICATIONS
1025.1400CLASS
POLE
LENGTH
POLE
NO
STAKE
OR
POLE
FIG.18
FIG.10
FIG.10
FIG.10
FIG.18
60
80
85
80
60
120+13
117+14
114+01
110+93
107+65
TEMP
DESIGN
TRANS
100°C
100°C
100°C
100°C
100°C
111025457.dgn 11/15/2019 8:57:30 AM
11/19/19
11/19/2019
MFP19006535
RR11 12 11 EAST VALLEY RDSW 34TH ST
11 12 11
P01
# 3400
EAST VALLEY RDSHOULDER
WORK W21-5UTILITY
WORKAHEAD W21-7350'350'UTILITYWORKAHEADW21-7
350'UTILITYWORKAHEADW21-7350'R9-9SIDEWALK
CLOSED R9-9SIDEWALKCLOSEDAHEAD
USE OTHER SIDE
SIDEWALK CLOSEDAHEAD USE OTHER SIDESIDEWALK CLOSEDCHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
-O%#111025457
3400 E Valley Road, Renton, WA
11/8/2019
nick.klyzhko@pse.com
(425) 424-7796
SHEET 1 of 3
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP19006535
RR11 12 11 EAST VALLEY RDSW 34TH ST
11 12 11
P02
# 3400
EAST VALLEY RDUTILITYWORKAHEADW21-7
350'350'350'R9-9SIDEWALK
CLOSED R9-9SIDEWALKCLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDSHOULDER
WORK W21-5UTILITY
WORK
AHEAD W21-7AHEAD
USE OTHER SIDE
SIDEWALK CLOSEDUTILITYWORKAHEADW21-7350'CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
-O%#111025457
3400 E Valley Road, Renton, WA
11/8/2019
nick.klyzhko@pse.com
(425) 424-7796
SHEET 2 of 3
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP19006535
RRSW 34TH ST
11 12 11
P03
# 3400EAST VALLEY RD350'350'350'350'350'R9-9SIDEWALK
CLOSED R9-9SIDEWALKCLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDSHOULDER
WORK W21-5UTILITY
WORKAHEAD W21-7AHEAD
USE OTHER SIDE
SIDEWALK CLOSEDUTILITYWORKAHEADW21-7350'CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
-O%#111025457
3400 E Valley Road, Renton, WA
11/8/2019
nick.klyzhko@pse.com
(425) 424-7796
SHEET 3 of 3
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP19006535
To: City of Renton; Franchise Permits
Attn: Holly Powers
RE: PSE Job Number #111025457, #105093581
Permit #:
LOCATION OF WORK: 3400 E Valley RD, Renton WA 98057
SCOPE OF WORK:
We are requesting a permit for 3 pole replacements and a transformer upgrade. The City
of Renton has informed our customer that part of the frontage improvement needs to
include the proper street lighting. In this case we would need to install taller poles to
accomidate the proper clearance from our high voltage conductor and the street lights.
There will be three poles that will be affected. See attached design for reference. Also we
will be upgrading the existing transformer on private property and might need to use a
lane or the side walk to complete work for our trucks. Give me a call if there are any
further questions on the work to be done.
Sincerely,
Fabian Gomez
Puget Sound Energy
Project Manager
Customer & System Projects
Cell: (206) 573-0031
Fabian.gomez@pse.com
April 3, 2020
Fabian Gomez
Puget Sound Energy - Electric
P.O. Box 97034
Bellevue, WA 98009-9734
Via Email: Fabian.gomez@pse.com
SUBJECT: Request for Undergrounding Exemption
(PSE#111025457, MFP19006535, 3400 East Valley Rd)
Dear Mr. Gomez:
The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from
Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities
shall be required to be installed underground, pursuant to the standards of the section of RMC.
PSE proposes to have Potelco Inc. replace 3 Transmission Poles providing more than 55kv of voltage along
the frontage of 3400 East Valley Rd. in order to provide height clearance for new street lighting.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5834
grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain,
repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical
energy and gas, in, upon, over, under, along, across and through the franchise area.
The proposal would replace 3 existing transmission poles that provide greater than 55kv of voltage in
order to provide the height clearance necessary to install street lighting beneath the transmission lines.
Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(c) which allows for
transmission systems greater than 55kv voltage to remain above ground.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(c).
PSE Electric #11025457
Page 2 of 2
April 3, 2020
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, April 17, 2020.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Sandy Leek, PSE, sandy.leek@pse.com
Corrie Rydberg, PSE, Corrie.Rydberg@pse.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19006535
Engineering
1 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
Page 1 of 1