HomeMy WebLinkAboutNOA 12-066
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057.
File Name / No.: Renton Salvation Army Expansion / LUA12-066, CU-H, SME
NAME:
MAILING ADDRESS: City/State/Zip:
TELEPHONE NO.:
NOTICE OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: August 20, 2012
PROJECT NAME/NUMBER: Renton Salvation Army Expansion / LUA12-066, CU-H, SME
PROJECT DESCRIPTION: The applicant is requesting a Condition Use Permit to continue and expand
the existing Salvation Army Renton Corp. building located at 720 S Tobin Street. The Salvation Army is currently
occupying the building and includes a chapel, fellowship hall, kitchen, community classrooms, meeting room and offices.
The applicant is proposing to expand the existing 7,661 square foot building by 1,384 square feet and renovate the
interior of the existing building. The proposed expansion would not change the use at the existing facility but would
bring the building up to current Building and Fire codes as well as provide additional space for their services. The site is
located in the Residential Multi-Family Urban zone and is 18,835 square feet in size. In addition, the site is located within
the Shoreline of the Cedar River, Reach B which is designated Shoreline High Inte nsity. The applicant has requested a
Shoreline Exemption for proposed building upgrades. Access to the site would be gained off of both S Tillicum Street and
S Tobin Street. The proposed project would remove one existing tree. A Stormwater Report was submitted with the
application.
PROJECT LOCATION: 720 S Tobin Street
PUBLIC APPROVALS: Hearing Examiner Conditional Use Review, Shoreline Exemption Review
APPLICANT/PROJECT CONTACT PERSON: Grace Kim, AIA; Schemata Workshop Inc.; 1720 12th Avenue #3; Seattle, WA
98122
PUBLIC HEARING: Public hearing is tentatively scheduled for September 18, 2012 before the
Renton Hearing Examiner at 2:00 p.m., in Renton Council Chambers on the
7th floor of Renton City Hall.
Comments on the above application must be submitted in writing to Vanessa Dolbee, Senior Planner, Department of
Community & Economic Development, 1055 South Grady Way, Renton, WA 98057, by 5:00 p.m. on September 4,
2012. This matter is also tentatively scheduled for a public hearing on September 18, 2012, at 2:00 p.m., Council
Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the
hearing, please contact the Planning Division to ensure that the hearing has not been rescheduled at (425) 430-7282. If
comments cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present
your comments on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be
made a party of record and receive additional information by mail, please contact the Project Manager. Anyone who
submits written comments will automatically become a party of record and will be notified of any decision on this
project.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPLICATION: August 3, 2012
NOTICE OF COMPLETE APPLICATION: August 20, 2012