HomeMy WebLinkAboutD_Valley_Center_070917September 17, 2007
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
Minutes
APPLICANT/CONTACT:
OWNER:
LOCATION:
SUMMARY OF REQUEST:
SUMMARY OF ACTION:
DEVELOPMENT SERVICES REPORT:
PUBLIC HEARING:
Dale and Helene Behar
The Behar Company
1000 Second Avenue, Ste. 3330
Seattle, WA 98104
Davis Street Associates, LLC
1000 Second Avenue, Ste. 3330
Seattle, WA 98104
Valley Center Building
File No.: LUA 07-060, SA-H, ECF
305 South 43'' Street
Applicant requested Site Plan approval for the construction of
12-story building on a 58,551 square foot property.
Development Services Recommendation: Approve with
conditions
The Development Services Report was received by the
Examiner on August 14, 2007
After reviewing the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding area; the Examiner
conducted a public hearing on the subject as follows:
MINUTES
The following minutes are a summary of the August 28, 2007 hearing.
The legal record is recorded 011 CD.
The hearing opened on Tuesday, August 28, 2007, at 9:02 a.m. in the Council Chambers on the seventh floor of
the Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No. 1: Yellow file containing the original Exhibit No. 2: Vicinity Map
application, proof of posting, proof of publication and
other documentation pertinent to this request.
Exhibit No. 3: Aerial Photograph of Site Exhibit No. 4: Zoning Map
Exhibit No. 5: West Building Elevation Exhibit No. 6: North Building Elevation
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page 2
Exhibit No. 7: East Buildin2: Elevation Exhibit No. 8: South Building Elevation
Exhibit No. 9: Site Plan Exhibit No. 10: Aerial PhotoITTaph of Streets
Exhibit No. 11: Topouraphv Man Exhibit No. 12: Site, Grading, and Stormwater Plan
Exhibit No. 13: Slopes Man Exhibit No. 14: Tree Cutting/Land Clearing Plan
Exhibit No. 15: Landscane Schematic Design
The hearing opened with a presentation of the staff report by Elizabeth Higgins, Senior Planner, Development
Services, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The project is located in the
Commercial Office zone within the Commercial Corridor of the Comprehensive Plan Designation.
The Environmental Review Committee issued a Determination of Non-Significance -Mitigated and included 5
mitigation measures. No appeals were filed.
Traffic and Fire Mitigation fees were assessed for this project.
The update on the Geotech letter will be required prior to issuance of the building permit.
The building would be located just south of 43'd Street in an area of commercial and institutional development
related to medical facilities and care. The site is approximately 1.34 acres. The grading of the site has created
some slopes along the east and south side, the proposed building would be built up into those slopes. The
building is proposed to be 12 stories including five and a half stories of parking. The building would be 167 feet
tall from the ground elevation to the top of the mechanical equipment on the top of the roof. The building would
be contemporary in architecture with the use of glass and metal. The mechanical equipment on the roof would
be screened.
The parking required for this building would be 778 stalls and they are providing 792 stalls, which is an
appropriate amount of parking for the building. The parking is arranged for maximum safety, the primary
entrance for patients would be off Davis Avenue. An additional entry to the parking on S 43"' that would be
right in, right out only for staff parking.
The project does meet the requirements of the Comprehensive Plan, its uses and policies. The Commercial
Corridor land use element has several objectives that encourage this type of development in the corridor. This
project also meets all the policies of the commercial office zone included in the Comprehensive Land Use Plan.
There would be retail space on the ground floor.
The project would be fully landscaped and they will try to maintain and preserve the existing street trees along
Davis Avenue S. The project further meets all the requirements of the site plan review. The project will have
an impact on the surrounding properties due to its height. It would be built into the slopes and will not appear to
be as high as it really is, but will affect light and shade on the adjacent property. Property values would be
enhanced and would provide office space for additional medical facilities.
The building is in the flight line of the Renton Municipal Airport, but it is a considerable distance away. The
impact would be more on users of the building than on aircraft going in and out of Renton Airport. An
A vigation Easement would be included with the lease agreements so that people are aware that there may be
some noise from aircraft. The Renton airspace is in somewhat of a conflict with the SeaTac airspace, so they
'
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page 3
must fly primarily over south, east and north Renton and not farther to the west, which conflicts with the Boeing
Airport. The height of the building is not anticipated to be an issue.
In terms of the helipad at Valley Medical Center, both Renton Airport management and FAA stated that the only
requirement would be that the helipad have a clear approach and departure route. That would not be affected by
this building.
Public services are available to the site and some improvements may be required due to the difference in size of
the building. There are no major utility changes that would need to be made.
Dale Behar, Davis Street Associates, LLC, 1000 Second Avenue, Suite 3330, Seattle, WA 98104 stated that in
terms of the parking garage, the floors are very large and there is no spiral to move from floor to floor, the ramps
are short and shallow moving from one floor to the next. They would like to encourage employees not to use
the parking so they have provided shared bicycles, showers, a flexible car sharing arrangement so that people
who need to move in and out during the day, but not need to drive their car to work, can be accommodated.
They will also have valet parking available for people coming in to the building.
He did not know what type of glass would be in the windows, but stated that this was not their intention to
impede traffic or make it difficult for people to drive. They will make sure that that issue is addressed as the
building is designed.
Kayren Kittrick, Development Services stated that a very good overview of the area was done and there are
major roads on at least two sides of this building, which is why WSDOT was very concerned. They will also be
concerned about the reflective glass and will have comments to make.
All intersections are controlled by signals in this vicinity. Any improvements would be by computer or
regional.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 9:38 am.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
FINDINGS:
I. The applicants, Dale and Helene Behar, filed a request for a Site Plan approval for a commercial
building.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit #1.
3. The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non-Significance -Mitigated (DNS-M).
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 305 South 43rd Street. The property is located on the south side of South
43rd Street immediately east of Davis Avenue South. Valley Medical Center is located directly north of
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page4
the subject site across 43rd.
6. The map element of the Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of Commercial Corridor uses, but does not mandate such development
without consideration of other policies of the Plan.
7. The subject site is currently zoned CO (Commercial Office).
8. The subject site was annexed to the City with the adoption of Ordinance 2169 enacted in March 1968.
9. The subject site is approximately 58,551 square feet or 1.34 acres. The subject site is generally
rectangular although the western property line has a spike to the west near its center.
10. The subject site slopes downward to the west with slopes up to about 15 percent. Staff noted that there
are regulated slopes along the south and east sides of the site and the ERC required updated
geotechnical information. The applicant will grade the site, which will continue to have an elevation
change of approximately 6 to 8 feet along S 43rd. Underground parking will require removal of
approximately43,000 cubic yards of soils.
11. The subject site previously used by United Way of King County, which consisted of a 6,500 square foot,
single-story building.
12. The applicant proposes developing a 12-story building with approximately 443,335 square feet of office
space. The proposal would be to create space for medical offices and medical support activities.
13. The 12-story building would contain five and a half (5.5) stories of enclosed parking. The building
would be 167 feet 2 inches in height to the top of the screened rooftop equipment. The subject site is at
an elevation of approximately 107 feet above mean sea level. Apparently, while comprehensive plan
policies might limit a building to 10 stories, Code permits buildings up to 250 feet tall in this zone.
14. The building's exterior treatment will vary depending on the function of the floor. The parking garage
levels, Levels 3 to 5, would be painted wire screen. The upper level office floors, Levels 6 to 12, would
have alternating glass windows and metal panel siding. The lowest levels, Levels I and 2 would be the
main lobby, retail storefronts and additional parking. These two levels would be finished with windows,
composite wood treatment and accent lighting.
15. Building lot coverage would be approximately 86 percent. The applicant proposes a "green roof" that
would comprise 22 percent. Staff calculated that a green roof provides approximately 50 percent
compensation for impervious surface, thereby resulting in approximately 75 percent impervious surface.
16. The project will observe a variable setback from Davis that narrows to approximately 16'2" whereas a
30-foot setback would normally be required. The main lobby and entrance are located along Davis and
provide access to interior parking and to the lobby for drop-offs. A reduced setback is permitted
through the Site Review process and staff recommended the reduction. It would observe a 30-foot
setback from S. 43rd Street, which does meet code.
17. It appears that a modification for parking was not required. The applicant will be providing 792 stalls
for the 12-story building.
18. Access to the main entrance of the building and patient parking would be via a driveway along Davis
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page 5
Avenue S. Loading dock and employee parking access would be via S 43rd Street.
19. There would be approximately 367 employees in building.
20. Stormwater is now handled by existing systems, which convey water downstream, toward the hospital
and then into the Panther Creek drainage basin.
21. The new building would be across from the hospital's new helipad. The building was reviewed by the
FAA and found that it would not intrude into the Renton Airport airspace. Staff reported that an
avigation easement would be required as the building's tenants might be affected by airplane or
helicopter noise.
22. At full occupancy the proposal is anticipated to generate approximately 3,320 new daily trips with
approximately 255 A.M. peak hour trips and 280 P.M. peak hour trips.
23. The Washington State Department of Transportation was concerned about the traffic generated by this
project as it sits just east of SR-167. Staff noted that all intersections are signalized and that turn
pockets and channelization will be used to control turns. Staff also noted that access to and from the site
along S 43rd would be limited to right-in and right-out turning.
24. The impact ofreflections off the tower on nearby streets and SR 167 were not specifically addressed.
The applicant indicated that they would review potential impacts.
CONCLUSIONS:
1. The site plan ordinance provides a number of specific criteria for reviewing a site plan. Those criteria
are generally represented in part by the following enumeration:
a. Conformance with the Comprehensive Plan;
b. Conformance with the Building and Zoning Codes;
c. Mitigation of impacts on surrounding properties and uses;
d. Mitigation of the impacts of the proposal on the subject site itself;
e. Conservation of property values;
f. Provision for safe and efficient vehicle and pedestrian circulation;
g. Provision of adequate light and air;
h. Adequacy of public services to accommodate the proposed use;
The proposed use satisfies these and other particulars of the ordinance.
2. The proposed tower will obviously be somewhat out of character with the area, being 12-stories high
although it appears to be in keeping with trends in the area as well as both the comprehensive plan and
zoning code. The hospital across the street is also raising the traditional height of structures in this area.
The comprehensive plan suggests urban development patterns including particularly dense, centered
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page6
development rather than linear sprawl. The tower complex incorporates both office and commercial
uses as well as their complementary parking into one compact footprint rather than spread out parking
and low-rise buildings over multiple acres. The proposed medically allied services that will be provided
also complement the hospital and other medical services available in this area. The use, anticipated to
house nearly 400 employees, will obviously create additional employment opportunities.
3. Staff noted that the Zoning Code, the primary governing law in land use review, permits buildings up to
250 feet tall so the proposed use is compatible with code. The comprehensive plan policies need
revision since they might be read to restrict the height limits in this area. In other particulars the
proposal is compatible with other elements of the Zoning Code including setbacks and permitted uses.
A modification was granted to deviate from parking standards. The reduced setback along Davis
appears appropriate due to the curving nature of the street and that it is matched by the building's facade.
4. The 167 foot tall building will inevitably create some shadow and shading impacts on surrounding uses
but these were anticipated when the Zoning Code, which allows 250-foot tall buildings was adopted. It
appears that the additional traffic will also be felt in the community but staff noted that current streets
can handle the additional traffic and that appropriate turning lanes and restrictions will offset some of
these impacts.
5. The site will be denser and more intensely developed than it has been in the past. The "green roor•
treatment will offset some of the impacts of creating more impermeable surfaces.
6. The development of the medical center will increase the tax base of the City and while it might impact
nearby development initially, as the community grows, the building will blend more with the
neighborhood including the taller building proposed by the hospital.
7. The traffic will be routed differently for patrons and for delivery and employee vehicles making for
safer access to the site.
8. As noted, this building will create shading but it observes the appropriate setbacks from its property
lines as do other uses in the area observe their appropriate setbacks.
9. There are adequate public services in the area to serve the proposed use.
10. In conclusion, the proposed use will make a definitive impression in the area and probably in the City as
one of the tallest, if not the tallest building in Renton. It appears to have addressed most issues
presented by the Code and comprehensive plan.
DECISION:
The Site Plan is approved subject to the following conditions:
1. Compliance with ERC Mitigation Measures: The applicant is required to comply with the
Mitigation Measures which were required by the Environmental Review Committee Threshold
Detennination prior to the issuance of a building permit.
2. The applicant shall consult with the Washington State Department of Transportation and the
City to assure that reflective glare from window and wall panels shall not create hazards on
nearby roads and highways.
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September I 7, 2007
Page 7
3. A "color board" shall be submitted, prior to issuance of a building permit, to the attention of the
Development Services Department plan reviewer. This submittal shall include materials,
finishes, and colors for all exterior building elements.
4. A detailed landscape plan shall be submitted, prior to issuance of a building permit, indicating
the final landscaping of the project site.
ORDERED THIS 17'h of September 2007.
HEARING EXAMINER
TRANSMITTED THIS 17"' of September 2007 to the parties of record:
Elizabeth Higgins
1055 S Grady Way
Renton, WA 98055
Kayren Kittrick
Development Services
City of Renton
Dale & Helene Behar
Davis Street Associates, LLC
1000 Second Avenue, Suite 3330
Seattle, WA 98 l 04
Dave E. Smith
General Counsel
Valley Medical Center
400 S 43'ct Street
Renton, WA 98058
TRANSMITTED THIS 17"' day of September 2007 to the following:
Mayor Kathy Keolker Mark Peterson, Fire
Kayren Kittrick
Development Services
City of Renton
Paul N Joos, MD
Valley Eye & Laser Center, Inc., P.S.
4011 Talbot Road S., Ste. 210
Renton, WA 98055
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
Renton Reporter
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter 8, Section !OOGofthe City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., October 1, 2007. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors oflaw or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
Valley Center Building Site Approval
File No.: LUA-07-060, SA-H, ECF
September 17, 2007
Page 8
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m .• October 1. 2007.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Council or final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This means that parties to a land use decision may not communicate in
private with any decision-maker concerning the proposal. Decision-makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
Project Location: 305 South 43rd Street