Loading...
HomeMy WebLinkAboutNOA_Valley_Center_070618NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE-MITIGATED (DNS-M) DATE: LAND USE NUMBER: PROJECT NAME: June 18, 2007 LUA07-060 SA-H. ECF Valley Center PROJECT DESCRIPTION: The applicant for this land use action has requested Site Plan Review for a 443,335 sf, 12 story building located adjacent to the Valley Medical Center at 305 S 43rd Street in Renton. Approximately 181,931 gsf would be medical offices and hospital supporting facilities. Parking for 769 vehicles would be provided on 5- 1/2 levels of underbuilding parking. A parking modification has been requested to reduce the parking from the amount required. The building would be 266'-5" to the top of the penthouse feature. An existing, 6,109 sf, one-story structure, built in 1966, would be demolished as part of this project. The project is in the Commercial Office (CO) zone within the Commercial Corridor Comprehensive Plan land use designation A SEPA Environmental Determination will be required and a Hearing Examiner Site Plan Review at a public hearing. PROJECT LOCATION: 305 S 43rc Street OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency. the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project Therefore, as permitted under the RCW 43. 21 C. 110, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance- Mit1gated (DNS-M). A 14-day appeal period will follovv the issuance of the DNS-M. PERMIT APPLICATION DATE: NOTICE OF COMPLETE APPLICATION: June 12 2007 June 18 2007 APPLICANT/PROJECT CONTACT PERSON: Dale & Helene Behar, Behar Company; Tel: (206) 233-1999; Eml: dale@beharcompany.com or helene@beharcompany.com Permits/Review Requested: Other Permits which may be required: Requested Studies: Location where application may be reviewed: PUBLIC HEARING: CONSISTENCY OVERVIEW: Zoning/Land Use: Environmental Documents that Evaluate the Proposed Project: Development Regulations Used For Project Mitigation: Environmental ($EPA) Review, Site Plan Review Construction, Grading and Building Permits Environmental Checklist, Environmental Assessment Phase I, Transportation Impact Study, Technical Information Report, and Geotechnical Engineering Study Planning/Building/Public Works Department, Development Services Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA 98057 Public rearing is tentatively scheduled for August 21, 2007 before the Renton Hearing Examiner in Renton Council Chambers. Hearings begin at 9:00 AM on the 7th floor of tne new Renton City Hall located at 1055 South Grady Way The subject s,te is designated Commercial Corridor (CC) on the City of Renton Comprehensive Land Use Map and Commercial Office (CO) on the City's Zoning Map Environmental (SEPA) Checklist The proJect will be subject to the City's SEPA ordinance, RMC 4-2; 4-4; 4-5; 4-6; 4-9 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: The followng M1tgation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above. The applicant will be required to pay the apprcpnare Transportation Mitigation Fee; The applicant will be required to pay the aµp1opnate Fire Mitigation Fee; and The applicant will be required to pay the appropriate Parks Mitigation Fee. Comments on the above application must be submitted in writing to Elizabeth Higgins, Senior Planner, Development Services Division, 1055 South Grady Way. Renton, WA 98057, by 5:00 PM on July 2, 2007. This matter is also tentatively scheduled for a public hearing on August 21, 2007, at 9:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way Renton. If you are interested in attending the hearing, please contact the Development Services Division to ensure that the hearing has not been rescheduled at {425) 430-7282. If comments cannot be submitted in writing by the date 1rdicated above. you may still appear at the hearing and present your comments on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional informa11on by rT,ail. piease contact the project manager. Anyone who submits written comments will automatically become a par·ty of record and will be notified of any decision on this project. CONTACT PERSON: Elizabeth Higgins, Senior Planner; Tel: (425) 430-7382; Eml: ehiggins@ci.renton.wa.us If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: Valley Center/LUA0?-060, SA-H. ECF NAME: MAILING ADDRESS: TELEPHONE NO.: