HomeMy WebLinkAboutSR_Hex_Living_Hope_Church_Expansion_070313PUBLIC
HEARING
City of Renton
Deparlment of Planning I Building I Public Works
PRELIMINARY REPORT TO THE HEARING EXAMINER
A. SUMMARY AND PURPOSE OF REQUEST:
Public Hearing Date:
Project Name:
Applicant:
Contact:
File Number:
Project Summary:
Project Location:
V ~
V 18th
I iRM-F
RM-F
1' R-8
N
March 13, 2007
Living Hope Church Expansion
Living Hope Christian Fellowship; 2201 Edmonds Avenue SE; Renton, WA 98058
Durwood Smith; West Coast Church Designers; 3522 S. 1981h St.; Seatac, WA 98188
LUA-06-157, CU-H, SA-H, Project Manager: Elizabeth Higgins, Senior Planner
ECF
The applicant is requesting Site Plan Approval, Conditional Use Permit approval,
and Environmental (SEPA) Review to allow expansion of an existing church. The
project site is at the northwest corner of the intersection of Edmonds Ave SE and SE
161'1 Street. The property abuts the City of Renton -King County jurisdictional line.
The 2 story, 11.865 sf expansion would provide a new sanctuary, offices, meeting
rooms, multi-purpose room, and accessory use spaces.
2201 S. 1981
h St., Renton, WA. 98188
R-8
City of Renton PIBJPW Departmen.
LIVING HOPE CHURCH EXPANSION
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
PUBLIC HEARING DA TE: March 13, 2007 Page 2 of 11
8. HEARING EXHIBITS:
Exhibit 1: Project file ("yellow file") containing the application, reports, staff comments, and other
material pertinent to the review of the project.
Exhibit 2: Vicinity Map/ Zoning Map (dated 2/16/2006)
Exhibit 3: Context Map (dated 1/02/2007)
Exhibit 4: Site Plan (dated 11/20/2006)
Exhibit 5: Main Floor Plan (dated 11/20/2006)
Exhibit 6: Upper Floor Plan (dated 11/20/2006)
Exhibit 7: Site topography and Tree Cutting Plan (dated 11/20/2006)
Exhibit 8: Grading and Storm Drainage Plan (dated 10/13/2006)
Exhibit 9: Neighborhood Detail Map (no date)
Exhibit 10: Building Elevations (dated 11/20/2006)
C. GENERAL INFORMATION:
1. Owners of Record:
2. Zoning Designation:
3. Comprehensive Plan Land Use
Designation:
4. Existing Site Use:
5. Neighborhood Characteristics:
Living Hope Christian Fellowship
Residential 8
Residential Single-family
Church
North: Residential 8 zoning; single-family residential development
East: King County; Cascade Elementary School (Renton School District)
South: King County; Single-family residential development
West: Residential 8 zoning; single-family residential development
6. Access:
7. Site Area:
8. Project Data:
Existing Building Area:
New Building Area:
Total Building Area:
Edmonds Avenue SE (existing)
192.313 square feet (4.41 acres)
Area
10,500 sf
12,000 sf
22,500 sf
D. HISTORICAL/BACKGROUND:
Action
Annexation
Comprehensive Plan
Zoning
Hex Report 06-157 .doc
Land Use File No.
N/A
N/A
N/A
Ordinance No.
1871
5099
5191
Comments
Existing building
Addition
Date
03/08/61
11/01/2004
2/16/2006
City of Renton PIB!PW Oepartmen.
LIVING HOPE CHURCH EXPANSION
PUBLIC HEARING DA TE: March 13, 2007
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
Page 3 of 11
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
Section 4-2-020: Purpose and Intent of Zoning Districts
Section 4-2-070: Zoning Use Table
Section 4-2-11 O: Residential Development Standards
2. Chapter 4 Property Development Standards
Section 4-4-030: Development Guidelines and Regulations
Section 4-4-060: Grading, Excavation and Mining Regulations
Section 4-4-080: Parking, Loading and Driveway Regulations
Section 4-4-130: Tree Cutting and Land Clearing Regulations
4. Chapter 6 Streets and Utility Standards
Section 4-6-060: Street Standards
6. Chapter 9 Procedures and Review Criteria
7. Chapter 11 Definitions
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element: Public Facilities (includes quasi-public use such as religious facilities)
2. Community Design Element.
G. DEPARTMENT ANALYSIS:
1. PROJECT DESCRIPTION/BACKGROUND
The project site is located in southeast Renton at a location, Edmonds Ave SE and SE 161'1 St,
abutting unincorporated King County (Exhibit 2). Although the site is within an area developed as
single-family residential, it is well-buffered from surrounding houses (Exhibit 3). More than half the
property, to the west of the building and parking area, is undeveloped and heavily treed. This area is
not currently proposed to be developed. Beyond the west property boundaries, land is undeveloped
and owned by King County and the Soos Creek Water and Sewer District. Land to the south and east
lies in unincorporated King County and is currently large lots with residential uses. Another church is
located adjacent to the Fellowship property to the south. Cascade Elementary School, a Renton
School District facility, is located diagonally to the southeast.
The 4.41 acre project site was originally the Cascade Vista Free Methodist Church, a 4,512 sf single-
story, wood frame building built in 1966. Subsequent additions in 1968 and 1975 added 3,880 and 960
sf, respectively, which were used as classrooms. Cascade Vista Free Methodist Church is now known
as the Living Hope Christian Fellowship, a church of the national Free Methodist denomination.
Approximately 60 families are served by a licensed child daycare center on the premises.
The property is within the Residential 8 Zone (R-8). Religious uses, such as a church, are conditional
uses in all zones within the City. Expansion of such an existing use requires a Conditional Use Permit
approved by the Hearing Examiner.
The proposed project would consist of a 2 story addition to the north fa9ade of the existing building, in
what is currently a grass-covered yard. The addition would include a new sanctuary, offices, multi-
purpose room, meeting rooms, and accessory use spaces. The 11,865 sf addition would result in a
total building size of 22,500 sf (Exhibit 4 ).
The new sanctuary would be on the lower level (main floor) as would a foyer, meeting rooms, and a
room for chair storage (Exhibit 5). The partial second level/mezzanine would be primarily used for
offices and meeting rooms (Exhibit 6).
Hex Report 06-157 .doc
City of Renton PIB!PW Departmen.
LIVING HOPE CHURCH EXPANSION
Preliminaf'/ Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
PUBLIC HEARING DA TE: March 13, 2007 Page 4 of 11
The existing sanctuary would be remodeled for use as a fellowship hall (social hall). Other interior
renovations may occur as a part of this request.
The building would continue to have access from Edmonds Avenue SE. Edmonds, between the site
and Puget Drive to the north, is classified as a "minor arterial" by the City of Renton Transportation
Department. Puget Drive, also a minor arterial, provides connection to Benson Road S, a principal
arterial (Exhibit 7).
New landscaping would be required where parking and the structure would be added and on the west
side where an existing fence would be moved and existing trees removed (Exhibit 8).
The addition would be set back 20 feet from the north property line. Although parking would be in the
"front yard" the building would be over 90 feet from the street. There would be no change to the side
yard setback on the south or the rear setback. These setbacks meet the development standards of the
R-8 Zone.
The addition would have a foyer, a 327-seat sanctuary, 3 meeting rooms, enclosed chair storage area,
mechanical/electrical rooms, men's and women's restrooms, and custodial closet on the main floor.
The second level/mezzanine would have 6 offices, an office/meeting room, a large room for
undesignated use, and a copy room.
Building access would be from an existing walkway on the church grounds.
A 28-space parking area would be developed on the east side of the existing and new structures. This
would be in addition to parking located at the northeast and south areas of the property. The total
amount of parking would be 77 spaces.
The existing Fellowship chapel seats 265. Renton Municipal Code requires one additional space for
every 5 seats added (RMC 4-4-080F, "Number of Parking Spaces Required -Religious Institutions").
The new sanctuary would add seating for 62. Therefore, an additional 12 spaces would be required.
The new 28-space parking area would meet the parking requirement.
In order to provide fire access to the west portion of the new addition, a 20-foot wide paved road and
turnaround would be provided. This construction would require the removal of sixteen 12 to 20-inch
diameter evergreen trees.
This report includes Site Plan Review and Conditional Use Permit review. Site Plan Approval or
Approval with Conditions would be required in order to receive grading and building permits. The Site
Plan Review ensures that the proposed addition meets required development standards. The
Conditional Use Permit review provides the City with the opportunity to apply conditions on the project
that may increase the compatibility of the project with the neighborhood.
Each review is based on criteria delineated in the Renton Municipal Code.
2. ENVIRONMENTAL REVIEW
Pursuant to the City of Ren ton's Environmental Ordinance and SEPA (RCW 43.21 C, 1971 as
amended), on January 3, 2007, the Environmental Review Committee issued a Determination of Non-
Significance -Mitigated (DNS-M) for the Living Hope Fellowship Addition project. The DNS-M included
4 mitigation measures. A 14-day appeal period commenced on January 8, 2007, and ended on January
22, 2007. One appeal of the threshold determination was filed, by the applicant.
Hex Report 06-157.doc
City of Renton PIBIPW Deparlmen1
LIVING HOPE CHURCH EXPANSION
Preliminary Report to the Hean·ng Examiner
LUA-06-157, CU-H, SA-H, ECF
PUBLIC HEARING DA TE: March 13, 2007 Page 5 of 11
3. COMPLIANCE WITH ERG MITIGATION MEASURES
Based on an analysis of probable impacts from the proposal, the Environmental Review Committee
(ERG) issued the following mitigation measures with the Determination of Non-Significance -Mitigated:
(1) The project shall comply with the Washington State Department of Ecology's Erosion and
Sediment Control Requirements, outlined in Volume II of the most recent Stormwater
Management Manual.
(2) The project shall comply with the 2005 King County Surface Water Design Manual to meet both
detention (Conservation Flow control -a.k.a. Level 2) and water quality improvements.
(3) The applicant shall pay the applicable Transportation Mitigation Fee at the rate of $75.00 for
each new average weekday trip attributable to the project. The Transportation Mitigation Fee is
due prior to the issuance of a building permit.
(4) The applicant shall pay the Fire Mitigation Fee equal to $0.52 per gross square foot of the
expansion area. The Fire Mitigation Fee shall be paid prior to issuance of a building permit.
4. STAFF REVIEW COMMENTS
Representatives from various City departments have reviewed the application materials to identify and
address site plan issues from the proposed development. These comments are contained in the official
file, and the essence of the comments has been incorporated into the appropriate sections of this report
and the Departmental Recommendation at the end of the report.
5. CONSISTENCY WITH CONDITIONAL USE CRITERIA:
A Conditional Use Permit is required in order to permit the expansion of an existing conditional use.
Section 4-9-030.G lists 11 criteria that the Hearing Examiner is asked to consider, along with all other
relevant information, in making a decision on a Conditional Use application. These include the
following:
(1) CONSISTENCY WITH THE COMPREHENSIVE PLAN, ZONING CODE & OTHER
ORDINANCES:
The proposed use shall be compatible with the general purpose, goals, objectives and standard
of the Comprehensive Plan, the Zoning Ordinance and any other plan, program, map or
ordinance of the City of Renton.
(a) Comprehensive Plan Land Use Element
The applicable section of the Land Use Element is "VI. Public Facilities." For the purposes
of meeting objectives and policies of the Comprehensive Plan, "Public Facilities" includes
quasi-public uses such as religious organizations. The following objectives and policies are
applicable to the project being reviewed:
Objective LU-X: Site religious and ancillary facilities in a manner that provides convenient
transportation access and minimizes their adverse impacts on adjacent land uses.
The existing church is sited appropriately within the context of a residential neighborhood
that has other non-residential uses, such as a school and another church.
Existing streets appear to be adequate to serve the existing facility and as expanded,
without jeopardizing public safety.
Hex Report 06M157.doc
City of Renton P!BIPW Deparlmen.
LIVING HOPE CHURCH EXPANSION
PUBLIC HEARING DA TE: March 13, 2007
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
Page6of11
Policy LU-104: When locating in predominantly residential areas, religious facilities should
be on the periphery of the residential area rather than the interior.
The project site is at the southern edge of the Rolling Hills residential area (Exhibit 9). It
forms one corner at a node of similar uses, with the Cascade Congregation of Jehovah's
Witnesses located on the adjacent corner to the south, the Renton Church of God within one
block south, and Cascade Elementary School to the east.
Policy LU-105: Parking should be provided on-site and buffered from adjacent uses.
Sufficient parking would be provided on site. Parking is primarily located on the east and
south sides of the building. Landscaping would provide screening of the east parking area
from the arterial and adjacent residential uses. The south parking area would be
landscaped, but primarily faces the parking area of the adjacent church.
Policy LU-106: Large scale facilities should be encouraged to locate contiguous to an
existing or planned transit route.
Metro Transit Route 101 provides service to the site, along Edmonds Ave between Puget
Drive and SE 1681h Street, with potential connections at Fairwood (to the east) and Renton
(to the west).
Policy LU-107: Religious facilities should be located on and have direct access to either an
arterial or collector street.
The facility fronts on Edmonds Avenue SE, a minor arterial that intersects to the north with
Puget Drive, also a minor arterial.
(b) Zoning Code
The site of the proposed project is located within the Residential 8 (R-8) zoning designation.
The proposed addition would increase the use of the church within a residential zone.
Although churches are conditional uses within all zones, they are generally compatible with
residential neighborhoods, if higher traffic volumes generated by church activities can be
accommodated on local roads safely. The designation of Edmonds Ave SE as a minor
arterial indicates that the street meets standards to handle the traffic expected from this use.
( c) Development Standards
The proposed church addition meets the development standards of the R-8 zone, which
primarily consist of required minimum building setbacks.
(2) COMMUNITY NEED:
There shall be a community need for the proposed use at the proposed location. In the
determination of community need. the Hearing Examiner shall consider the following factors,
among all other relevant information:
(a) The proposed location shall not result in either the detrimental over concentration of a
particular use within the City or within the immediate area of the proposed use.
The proposed project would result in the increased capacity of a religious facility. The Living
Hope Christian Fellowship has recognized the need for additional space. Although there are
3 religious facilities within one block of each other, the Living Hope Christian Fellowship is
the only church of its particular denomination in the South King County area. It serves the
worship needs of people not only in Renton, but also Auburn, Des Moines, and Kent.
Therefore, there is not an over-concentration of such uses.
(b) That the proposed location is suited for the proposed use.
Hex Report 06-157 .doc
City of Renton P!BIPW Deparlmen_
LIVING HOPE CHURCH EXPANSION
PUBLIC HEARING DA TE: March 13, 2007
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, E.CF
Page?o/11
The subject site is abutting residential uses on the north, west, and south. Close proximity
of churches to residential areas is a situation that is Jong-standing in urban areas and in
some suburban neighborhoods. If church-related activities do not create negative impacts,
such as high degrees of light or elevated noise levels, they can be considered compatible
uses. Staff did not receive negative comments from neighbors following posting of the
proposed church expansion.
(3)EFFECT ON ADJACENT PROPERTIES:
The proposed use at the proposed location shall not result in substantial or undue adverse
effects on adjacent property. The following site requirements shall be required:
(a) Lot Coverage: Lot coverage shall conform to the requirements of zone in which the
proposed use is to be located.
The existing church, with the proposed addition, would have lot coverage of approximately
12 percent, and therefore would be below the allowable maximum for site coverage by
buildings of 35 percent.
(b) Yards: Yards shall conform to the requirements of the zone in which the proposed use is to
be located. Additions to the structure shall not be allowed in any required yard.
The addition would be set back 20 feet from the north property line, which is outside the
building setback area. Although parking would be in the "front yard" the building would be
over 90 feet from the street. There would be no change to the side yard setback on the
south or the rear setback. These setbacks meet the development standards of the R-8
Zone.
(c) Height: Building and structure heights shall conform to the requirements of the zone in
which the proposed use is to be located. Spires, bell towers, public utility antennas or
similar structure may exceed the height requirement upon approval of a variance. Building
heights should be related to surrounding used in order to allow optimal sunlight and
ventilation, and minimal obstruction of views from adjacent structures.
The church would have a maximum height of 28 feet 6 inches and would, therefore, be
below the maximum allowable height of 30 feet (Exhibit 9).
(4) COMPATIBILITY:
The proposed use shall be compatible with the residential scale and character of the
neighborhood.
The church abuts another church to the south. Landscaping and a 90 foot setback are between
the church and residential uses adjacent across Edmonds. Landscaping and a utility easement
buffer the church from residential uses on the north.
(5) PARKING:
Parking under the building structure should be encouraged. Lot coverage may be increased to
as much as seventy-five percent (75%) of the Jot coverage requirement of the zone, in which the
proposed use is located, if all parking is provided underground or within the structure.
All parking would be in surface parking areas.
(6) TRAFFIC:
Traffic and circulation patterns of vehicles and pedestrians relating to the proposed use and
surrounding area shall be reviewed for potential effects on, and to ensure safe movement in the
surrounding area.
Hex Report 06-157.doc
City of Renton PIB!PW Depaitmen,
LIVING HOPE CHURCH EXPANSION
PUBLIC HEARING DA TE: March 13, 2007
Preliminary Reporl to the Headng Examiner
LUA-06-157, CU-H, SA-H, ECF
Page 8 of 11
Staff has reviewed the circulation patterns of potential vehicles and pedestrians. A new 20 foot
wide, paved internal road would be constructed as would some additional pedestrian pathways
to improve on-site circulation and provide emergency access that meets City of Renton
standards.
Additional traffic would burden local streets on Sundays and throughout the week from commute
activities associated with a school within the church. The impacts of increased traffic would be
mitigated by a condition of approval imposed as part of the environmental review 9see
"Mitigation Measures," above).
(7) NOISE, GLARE:
Potential noise, light and glare impacts shall be evaluated based on the location of the proposed
use on the lot and the location of on-site parking areas, outdoor recreational areas, and refuse
storage areas.
It is anticipated that the most significant noise impacts would occur during the construction
phase of the project. The applicant has submitted a Construction Mitigation Plan that provides
measures to reduce construction impacts such as noise, control of dust, traffic controls, etc. In
addition, the project would be required to comply with the City's noise ordinance regarding
construction hours.
There would be periodic noise impacts from traffic and activities that are normally associated
with a church. These noise impacts, however, would be comparable to noises from the existing
school and church to the east and south.
(8)LANDSCAPING:
Landscaping shall be provided in all areas not occupied by building or paving. The Hearing
Examiner may require additional landscaping to buffer adjacent properties from potentially
adverse effects of the proposed use.
The project would be required to meet City of Renton landscaping requirements. All pervious
areas of the site must be landscaped. Existing vegetation may be used to meet this
requirement.
(9) ACCESSORY USES:
Accessory uses to conditional uses such as day schools, auditoriums used for social and sport
activities, health centers, convents, preschool facilities, convalescent homes and others of a
similar nature shall be considered to be separate uses and shall be subject to the provisions of
the use district in which they are located.
There are no new, additional accessory uses proposed.
(10) CONVERSION:
No existing building or structure shall be converted to a conditional use unless such building or
structure complies, or is brought into compliance, with the provisions of this Chapter.
No building conversion from the existing use is proposed.
(11) PUBLIC IMPROVEMENTS:
The proposed use and location shall be adequately served by and not impose an undue burden
on any public improvements, facilities, utilities, and services. Approval of a conditional use
permit may be conditional upon the provision and/or guarantee by the applicant of necessary
public improvements, facilities, utilities, and/or services.
Hex Report 06-157 .doc
City of Renton PIBIPW Departmen.
LIVING HOPE CHURCH EXPANSION
Preliminary Report to the Hean·ng Examiner
LUA-06-157, CU-H, SA-H, ECF
PUBLIC HEARING DA TE: March 13, 2007 Page 9 of 11
The proposed project would be required to install utilities and construct road improvements as
mandated by the City's regulations. Previous stated requirements to provide street
improvements to SE 161st Street have been revised. No such improvements are now required.
A "non-residential sewer use certification" would be required by the King County Wastewater
Treatment Division for the proposed building remodel, due to the increase in plumbing fixtures.
6. CONSISTENCY WITH SITE PLAN REVIEW CRITERIA:
In reviewing the proposal with respect to the Site Plan Approval Criteria set forth in Section 4-9-200.E
of the Site Plan Ordinance and Development Standards from RMC 4-3-040F, the following issues have
been identified by City Departmental Reviewers:
1. Conformance with the Comprehensive Plan, its Elements and Policies;
See discussion above.
2. Conformance with existing land use regulations;
See discussion above.
3. Mitigation of impacts to surrounding properties and uses;
The proposed addition to an existing church is not anticipated to result in any adverse impacts
to surrounding properties and uses.
There are potential short-term impacts to adjacent properties (e.g., noise), which would result
from the construction of the project. These impacts will be mitigated by the applicant's
construction mitigation plan, which limits work and haul hours to those permitted by City Code.
Long term impacts included increased traffic associated with a church (see Mitigation Measures,
above).
4. Mitigation of impacts of the proposed site plan to the site;
The proposed addition would be located on the north side of the building in an area that is
currently mown lawn. Landscaping would be provided in disturbed areas, open space, and
along the perimeter property lines.
5. Conservation of area-wide property values;
Property values would be preserved or possibly increased.
6. Safety and efficiency of Vehicle and Pedestrian Circulation;
The proposed project would be accessed by Edmonds Avenue SE. Pedestrian sidewalks would
be available in the public right-of-way and on the site.
7. Provision of adequate light and air;
The proposed addition would be designed appropriately to allow adequate light and air
circulation to the building and the site. The design of the building addition would not result in
excessive shading of the property. In addition, there is ample area surrounding the building to
provide for normal airflow.
8. Mitigation of noise, odors and other harmful or unhealthy conditions;
The proposal is not expected to create any harmful or unhealthy conditions. Noise, dust, and
odors, which may result from the temporary construction on the site, would be mitigated by the
applicant's construction mitigation plan and code requirements for the use of Best Management
Practices.
Hex Report 06· 157 .doc
City of Renton P/8/PW Departmen.
LIVING HOPE CHURCH EXPANSION
PUBLIC HEARING DATE: March 13, 2007
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
Page 10 of 11
9. Availability of public services and facilities to accommodate the proposed use;
Public services would be available to the site. See "Advisory Notes to Applicant," below)
10. Prevention of neighborhood deterioration and blight.
No deterioration or blight is expected to occur as a result of the proposal.
H. RECOMMENDATION:
Staff recommends APPROVAL of the Living Hope Christian Fellowship Addition, Conditional
Use Permit and Site Plan, Project File No. LUA-06-157, SA-A, CU-A, ECF, subject to the
following conditions:
1. The applicant shall comply with all requirements of the Determination of Non-Significance -
Mitigated that was issued by the Environmental Review Committee on January 3, 2007.
2. A landscape plan shall be submitted, meeting the standards of RMC 4-4-070,
"Landscaping." Submittal of a final landscape plan shall be required prior to issuance of
building permit.
EXPIRATION PERIODS:
Site Plan Approval (SA-H): Two (2) years from final approval (signature) date.
Conditional Use Permit (CU-H): Two (2) years from final approval (signature) date.
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the
appeal process for environmental determinations.
Construction
1. The architectural design shall be by a licensed architect.
2. The structural design shall be by a licensed engineer.
Plan Review
1. All construction utility permits for utilities, drainage, and street improvements will require separate
plan submittals. All utility plans shall conform to the Renton Drafting Standards. Plans shall be
prepared by a licensed Civil Engineer.
2. When the utility plans are complete, submit three (3) copies of the drawings, two (2) copies of the
drainage report; permit application and an itemized cost of construction estimate and application fee
at the counter on the sixth floor of Renton City Hall. Prior to preparing a check, it is recommended
to call 425-430-7266 for a fee estimate as generated by the permit system.
3. The fee for review and inspection of these improvements is 5% of the first $100,000 of the
estimated construction costs; 4% of anything over $100,000 but less than $200,000, and 3% of
anything over $200,000. Half the fee must be paid upon application.
4. A Water Availability Certificate from Soos Creek Water and Sewer is required to be submitted with
the building permit application.
5. A Sewer Availability Certificate from Soos Creek Water and Sewer is required to be submitted with
the building permit application.
6. Surface Water System Development Charges will be required prior to issuance of building permits.
Hex Report 06-15 7. doc
City of Renton P/8/PW Department
LIVING HOPE CHURCH EXPANSION
Preliminary Report to the Hearing Examiner
LUA-06-157, CU-H, SA-H, ECF
PUBLIC HEARING DATE: March 13, 2007 Page11of11
7. Half street improvements including, but not limited to paving, sidewalks, curb and gutter, and storm
drainage will be required in Edmonds Ave SE and SE 160th. The site plan shows improvements in
Edmonds only.
8. All wire utilities shall be installed underground per the City of Renton Undergrounding Ordinance. If
three or more poles are required to be moved by the development design, all existing overhead
utilities shall be placed underground.
9. A Transportation Mitigation Fee of $8,100.00 will be required prior to obtaining building permits.
This is based on a fee of $75.00 per new average weekday trip generated by the project.
Fire Prevention
1. The preliminary fire flow is 2250 gpm, one hydrant is required within 150 feet of the structure and
two additional hydrants are required within 300 feet of the structure.
2. Separate plans and permits are required for the installation of fire alarm and sprinkler systems.
3. Fire Department access roadways are required to within 150 feet of all portions of the building
exterior. Roadways are a minimum 20 feet in width with a turning radius of 45 feet outside and 25
feet inside.
4. Dead end fire access roadways over 150 feet in length are required to have an approved
turnaround.
5. A list of flammable, combustible liquids or hazardous chemicals that are used or stored on the site
must be provided to the City of Renton Fire Prevention Bureau prior to occupancy.
6. A plan for Pre-Fire planning is required to be submitted for the project, in an approved format, prior
to occupancy.
7. A Fire Mitigation Fee based on $0.52 per square foot of the building addition is required prior to
obtaining building permits.
Hex Report 06-157.doc
S 18th
RM-F
R-8
~ ZONING
~-F-'-4-· 17 T23N R5E E 1/2
~.
~ R-8·c-1------~
R-8
R-8
R-8
RM-F
H4 • 29 T23N RSE E 1/2 0 2 00 :'?°
1,'600
~ = TBCIINICAL SBaVlCES 20 T23N R5E
EXHIBIT
2