Loading...
HomeMy WebLinkAboutNOA_Mt._Olivet_Power_Generation_Faciliities_060725\,~y 0 :~': ~~<. NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE-MITIGATED (DNS-M) DATE: July 25. 2006 LAND USE NUMBER: LUA06-083 SA-H, V-H, ECF PROJECT NAME: Mt. Olivet Emergency Power Generation Facility PROJECT DESCRIPTION: Tile applicant is requesting Site Plan approval, Variance approval. and Environmental (SEPA) Review for the construction of a 1,216 square foot power generator building to house one stationary and one mobile diesel powered generator on a Residential Multi-Family (RM-F) zoned property. The subject property totals 165,092 square feet in area. An existing 3 million gallon water reservoir and a booster pump station are located on the subject property. The proposed generators would provide emergency power to the existing booster pump station and wells 1, 2. and 3 when commercial power to these facilities is interrupted. The proposed power generator building would require a 5-foot deep cut into a protected slope area. A critical areas variance has been requested to after a protected slope PROJECT LOCATION: 250 Bronson Way NE OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period There will be no comment period following the issuance of the Threshold Determination of Non-Significance- Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M PERMIT APPLICATION DATE: NOTICE OF COMPLETE APPLICATION: June 30, 2006 July 25, 2006 APPLICANT/PROJECT CONTACT PERSON: Tom Malphrus, City of Renton -Utilities; Tel: (425) 430-7313; Eml; tmalphrus@ci.renton.wa.us Permits/Review Requested: Environmental (SEPA) Review, Hearing Examiner Site Plan and Variance approval Other Permits which may be required: Building, Fire, and Utility Construction Permits Geotechnical and Drainage Reports Requested Studies: Location where application may be reviewed: PUBLIC HEARING: CONSISTENCY OVERVIEW: Zoning/Land Use: Environmental Documents that Evaluate the Proposed Project: Development Regulations Used For Project Mitigation: PlanningfBuilding/Public Works Department, Development Services Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA 98055 Public hearing is tentatively scheduled for September 26, 2006 before the Renton Hearing Examiner in Renton Council Chambers. Hearings begin at 9:00 AM on the 7th floor of the new Renton City Hall located at 1055 South Grady Way. The subject site is designated Residential Multi-Family (RM-F) on the City of Renton Comprehensive Land Use Map and Residential Multi-Family (RM-F) on the City's Zoning Map. Environmental (SEPA) Checklist The project will be subject to the City's SEPA ordinance, 4-4-030 Development Guidelines and Regulations and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above The applicant will be required to pay the appropriate Fire Mitigation Fee; and The project will be required to comply with the 2001 Department of Ecology Stormwater Management Manual for erosion and sediment control. Comments on the above application must be submitted in writing to Jill Ding, Senior Planner, Development Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on August 8, 2006. This matter is also tentatively scheduled for a public hearing on September 26, 2006, at 9:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Development Services Division to ensure that the hearing has not been rescheduled at (425) 430~7282. If comments cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the proposal before the Hearing Examiner. If you have questions about this proposal. or wish to be made a party of record and receive additional information by mail. please contact the project manager Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Jill K. Ding, Senior Planner; Tel: (425) 430-7219; Eml: jding@ci.renton.wa.us I PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION I If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055. Name/File No.: Mt. Olivet Emergency Power Generation Facility/LUA06-083, SA-H, V-H, ECF NAME: MAILING ADDRESS: TELEPHONE NO.: