HomeMy WebLinkAboutNOA_Mt._Olivet_Power_Generation_Faciliities_060725\,~y 0
:~':
~~<.
NOTICE OF APPLICATION
AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE-MITIGATED (DNS-M)
DATE: July 25. 2006
LAND USE NUMBER: LUA06-083 SA-H, V-H, ECF
PROJECT NAME: Mt. Olivet Emergency Power Generation Facility
PROJECT DESCRIPTION: Tile applicant is requesting Site Plan approval, Variance approval. and
Environmental (SEPA) Review for the construction of a 1,216 square foot power generator building to house one stationary
and one mobile diesel powered generator on a Residential Multi-Family (RM-F) zoned property. The subject property
totals 165,092 square feet in area. An existing 3 million gallon water reservoir and a booster pump station are located on
the subject property. The proposed generators would provide emergency power to the existing booster pump station and
wells 1, 2. and 3 when commercial power to these facilities is interrupted. The proposed power generator building would
require a 5-foot deep cut into a protected slope area. A critical areas variance has been requested to after a protected
slope
PROJECT LOCATION: 250 Bronson Way NE
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton
has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M
PERMIT APPLICATION DATE:
NOTICE OF COMPLETE APPLICATION:
June 30, 2006
July 25, 2006
APPLICANT/PROJECT CONTACT PERSON: Tom Malphrus, City of Renton -Utilities; Tel: (425) 430-7313;
Eml; tmalphrus@ci.renton.wa.us
Permits/Review Requested: Environmental (SEPA) Review, Hearing Examiner Site Plan and
Variance approval
Other Permits which may be required: Building, Fire, and Utility Construction Permits
Geotechnical and Drainage Reports Requested Studies:
Location where application may
be reviewed:
PUBLIC HEARING:
CONSISTENCY OVERVIEW:
Zoning/Land Use:
Environmental Documents that
Evaluate the Proposed Project:
Development Regulations
Used For Project Mitigation:
PlanningfBuilding/Public Works Department, Development Services
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98055
Public hearing is tentatively scheduled for September 26, 2006 before the
Renton Hearing Examiner in Renton Council Chambers. Hearings begin at 9:00
AM on the 7th floor of the new Renton City Hall located at 1055 South Grady
Way.
The subject site is designated Residential Multi-Family (RM-F) on the City of
Renton Comprehensive Land Use Map and Residential Multi-Family (RM-F) on
the City's Zoning Map.
Environmental (SEPA) Checklist
The project will be subject to the City's SEPA ordinance, 4-4-030 Development
Guidelines and Regulations and other applicable codes and regulations as
appropriate.
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project.
These recommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above
The applicant will be required to pay the appropriate Fire Mitigation Fee; and
The project will be required to comply with the 2001 Department of Ecology Stormwater Management Manual for
erosion and sediment control.
Comments on the above application must be submitted in writing to Jill Ding, Senior Planner, Development
Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on August 8, 2006. This matter is also
tentatively scheduled for a public hearing on September 26, 2006, at 9:00 AM, Council Chambers, Seventh Floor,
Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the
Development Services Division to ensure that the hearing has not been rescheduled at (425) 430~7282. If comments
cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments
on the proposal before the Hearing Examiner. If you have questions about this proposal. or wish to be made a party of
record and receive additional information by mail. please contact the project manager Anyone who submits written
comments will automatically become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Jill K. Ding, Senior Planner; Tel: (425) 430-7219;
Eml: jding@ci.renton.wa.us
I PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION I
If you would like to be made a party of record to receive further information on this proposed project, complete
this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055.
Name/File No.: Mt. Olivet Emergency Power Generation Facility/LUA06-083, SA-H, V-H, ECF
NAME:
MAILING ADDRESS:
TELEPHONE NO.: