HomeMy WebLinkAboutAdden 1CAG-20-010, Adden #1-20
April 27th
(Approved via email from Cheryl Beyer)
April 15, 2020
Betsy Severtsen
Capital Projects Coordinator
City of Renton
Parks Planning and Natural Resources
1055 S Grady Way, 6th Floor
Renton, WA 98057
Subject: Gene Coulon Park North Water Walk – Corrosion Protection Study Proposal
Dear Betsy:
Please see attached proposal from Northwest Corrosion Engineering (NCE) to perform a field study
and determine the feasibility of applying corrosion protection systems to the North Water Walk piles
at Coulon Park. The proposal also includes concept-level designs for the purpose of estimating costs.
NCE proposes to complete these tasks on a time-and-expenses basis, not to exceed $7,500.
PND will provide coordination between the City and NCE and incorporate the concepts and costs
into our ongoing support and options analysis work with the City. We do not consider this additional
work to have significant cost implications and we propose to complete these tasks within our existing
contract and scope. PND will apply a typical 10% markup to costs from NCE for a total task budget
of $8,250.
If the City decides to proceed with the addition of a corrosion protection system for the North
Water Walk piles, a scope and fee for final design will be determined at a later date.
Thank you for the opportunity to present this proposal. We look forward to continuing to work with
the City and delivering the best and most cost-effective solutions to your citizens.
Sincerely,
Jon B. Keiser, P.E Colin Kuester, P.E.
Vice President Senior Engineer
NORTHWEST CORROSION ENGINEERING
PROJECT: PND - City of Renton Coulon Park North Water Walk - Alternatives Analysis
SCOPE OF WORK AND BUDGET
Proposed Scope of Work Tasks
TOTAL HOURS
FEES Cost
ESTIMATED PROJECT COST
ESTIMATED PROJECT COST 7,414.55$