Loading...
HomeMy WebLinkAboutC_Acceptance_LtrKathy Keolker, Mayor March 20, 2006 Matt Pool Pool Brothers Construction LLC PO Box 3023 Renton, WA 98056 Subject: Dear Mr. Pool: Kennydale Cafe Mixed-Use LUA06-020, SA-H, ECF CITY IF RENTON PlanningIBuildingIPublic Works Department Gregg Zimmermao· P.E., Administrator The Development Planning Section of the City of Renton has determined that the subject application is complete according to submittal requirements and, therefore, is accepted for review. Please note that, pursuant to RMC 4-3-050J.3 and 4-3-050F.7.i, an independent secondary review of the geotechnical information submitted with the application regarding development in an area of protected (steep) slopes will be required at the applicant's expense. The project is tentatively sCheduled for consideration by the Environmental Review Committee on May 2, 2006. Prior to that review, you will be notified if any additional information is required to continue processing your application. In addition, this matter is tentatively scheduled for a Public Hearing on May 30, 2006 at 9:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. The applicant or representative(s) of the appficant are required to be presenlat the public hearin9. A copy of the staff report will be mailed to you prior to the scheduled hearing. Please contact me at (425) 430-7382 if you have any questions. Keri Weaver Senior Planner -------------IO-s-s-So-u-fu-Gr--ad-y-w-a-y-.-R-en-to-n-,-W-as-h-in-~-on--9-80-S-S------------~ ® This paper contains 50% recyded material, 30% post oonsumer AHEAD OF THE CURVE