HomeMy WebLinkAboutNOA_Acceptance_LUA05-162®
tOTICE OF AFFLIC TIOt
AID PROPOSED DIETIERtltATIOt OF
tOIN-$1GIIFIC AtCIE-I ITIGATIED ([DIS-I)
DATE:January 10,2006
LAND USE NUMBER:LUA05-162,CU-H,SA-H,V-H,ECF
PROJECT NAME:Renton Bible Church
pROJECT DESCRIPTION:Proposal is to construct a 14,797 square foot addition to an existing church
structure.The addition is proposed to be constructed in two phases.The first phase would include the expansion of the
existing parking lot to a total of 102 cars and the construction of 6,083 square feetto the first floor of the church.The
second phase would incude a two-story addition totaling 8,714 square feet in area.The subject site is located within the
Residential-8 (R-8)dwelling unit per acre zoning designation.Access to the subject site is provided via driveways onto
Union Avenue NE.A church use is permitted in the R-8 zone subject to the approval of a conditional use permit.In
addition the applicant has requested Environemtal Reiview,Site Plan Approval,a vadance to the height requirements and
a modification to the refuse and recycleables storage requirements.
PROJECT LOCATION:973 Union Avenue NE
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE,MITIGATED (DNS-M):As •the Lead Agency,the City of Renton
has determined that significant environmental impacts are unlikely to result from the proposed project.Therefore,as
permitted under the RCW 43o21C.110,the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued.Comment periods for the project and the proposed DNS-M are integrated into a single comment
period.There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
.Mitigated (DNS-M).A 14-day appeal period will follow the issuance of the DNS-M.
PERMIT APPUCATION DATE:December 16,2005
NOTICE OF COMPLETE APPLICATION:
APPLICANT/PROJECT CONTACT PERSON:
January 10,2006
Patrick Paul,J.Patrick Mitchell &Associates;Tel:(425-821-6090;
Emh patricksea@aol.com
Permits/Review Requested:Environmental (SEPA)Review,Hearing Examiner Conditional Use
Permit,Site Plan &Variance
Other Permits which may be required:
Requested Studies:
Building,Fire,&Utility Construction Permit
Traffic Study &Drainage Report
Location where application may
be reviewed:Planning/Building/Public Works Department,Development Services
Division,Sixth Floor Renton City Hall,1055 South Grady Way,Renton,WA
98055 --
PUBLIC HEARING:Public headnq is tentatively scheduled for March 7,2006 before the Renton
Hearing Examiner in Renton Council Chambers.Hearings begin at 9:00 AM on
the 7th floor of the new Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW:
Zoning/Land Use:
Environmental Documents that
Evaluate the Proposed Project:
Development Regulations
Used For Project Mitigation:
The subject site is designated Residential -8 (R-8)on the City of Renton
Comprehensive Land Use Map and Residential Single-Family (RSF)on the City's
Zoning Map.
Environmental (SEPA)Checklist
The project will be subject to the City's SEPA ordinance,RMC 4-4-030
Devlopment Guidelines &Regulations,RMC 4-6-030 Drainage Standards and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures:The following Mitigation Measures will likely be imposed on the proposed project.
These recommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above.
.The applicant will be required to pay the appropriate Transportation Mitigation Fee;
.The applicant will be required to pay the appropriate Fire Mitigation Fee;
=The applicant will be required to pay the appropriate Parks Mitigation Fee;
.The applicant will be required to comply with the recommendations found in the submitted geotechnical
report;
°The applicant will be required to comply with the 2001 Department of Ecology Stormwater Manual for
Erosion and Sedimentation Control;and
.The applicant will be required to comply with the 2005 King County Surface Water Design Manual for the
purposes of drainage control
Comments on the above application must be submitted in writing to Jill Ding,Associate Planner,Development
Services Division,1055 South Grady Way,Renton,WA 98055,by 5:00 PM on January 24,2006.This matter is also
tentatively scheduled for a public hearing on March 7,2006,at 9:00 AM,Council Chambers,Seventh Floor,Renton
City Hall,1055 South Grady Way,Renton.If you are interested in attending the hearing,please contact the Development
Services Division to ensure that the hearing has not been rescheduled at (425)430-7282.If comments cannot be
submitted in writing by the date indicated above,you may still appear at the hearing and present your comments on the
proposal before the Hearing Examiner.If you have questions about this proposal,or wish to be made a party of record
and receive additional information by mail,please contact the project manager.Anyone who submits written comments
will automatically become a party of record and will be notified of any decision on this project.
P/'•I•IT A P T PERSON:Jill K.Ding,Associate Planner;Tel:(425)436-72t9;
Emh jding@ci.renton.wa.us
•...........PL+EA_SE_!NCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.......
If you would like to be made a party of record to receive further information on this proposed project,complete
this form and return to:City of Renton,Development Planning,1055 So.Grady Way,Renton,WA 98055.
Name/File No.:Renton Bible Church/LUA05-162,CU-H,SAoH,V-H,ECF
NAME:
MAILING ADDRESS:
TELEPHONE NO.: