Loading...
HomeMy WebLinkAboutNOA_Accpetance_LUA-05-155• NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE-MITIGATED (DNS-M) DATE: January 6, 2006 LAND USE NUMBER: LUA05-155, SA-H, V-H, LLA, ECF PROJECT NAME: Rainier Station PROJECT DESCRIPTION: Applicant is requesting site development plan approval for 52,000 sq. ft. of commerical space in 3 buildings, with a 209-stall parking garage, on 3.3 acres zoned Commercial Arterial (CA). Site is located at 601 Rainier Ave N. Existing buildings onsite will be removed. PROJECT LOCATION: 601 Rainier Avenue N OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has detennined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as pennitted under the RCW 43.21 C.11 0, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Detennination of Non-Significance- Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M. PERMIT APPLICATION DATE: December 7,2005 NOTICE OF COMPLETE APPLICATION: January 6, 2006 APPLICANT/PROJECT CONTACT PERSON: Meredith Everist, Baylis Architects; Tel: (425) 454-0566; Eml: everistm@baylisarchitects.com Permits/Review Requested: Environmental (SEPA) Review, Site Plan & Variance approvals Other Permits which may be required: Building Permits Requested Studies: Wetland, Habitat & Wildlife Studies; Geotechnical, Drainage, & Traffic Reports Location where application may be reviewed: Planning/Building/Public Works Department, Development Services Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA 98055 PUBLIC HEARING: Public hearing is tentatively scheduled for March 7. 2006 before the Renton Hearing Examiner in Renton Council Chambers. Hearings begin at 9:00 AM on the 7th floor of the new Renton City Hall located at 1055 South Grady Way. CONSISTENCY OVERVIEW: Zoning/Land Use: Environmental Documents that Evaluate the Proposed Project: Development Regulations Used For Project Mitigation: The subject site is designated Commercial Arterial (CA) on the City of Renton Comprehensive Land Use Map and Commercial (C) on the City's Zoning Map. Environmental (SEPA) Checklist The project will be subject to the City's SEPA ordinance, RMC Chapter 4 and other applicable codes and regulations as appropriate. I • Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above. A temporary erosion control plan will be required and shall be installed and maintained to the satisfaction of the representative of the Development Services Division for the duration of the project. The project contractor shall perform daily review and maintenance of all erosion and sedimentation control measures at the site during the construction of both off-site and on-site improvements as well as building construction. Weekly reports on the status and condition of the erosion control plan with any re_commendations of change ()r-~ revision to maintenance schedules or installation §I:!.all be:submitteabylheproject Engineer of record to the ... -public works inspector for the construction cifthe civil improvements of the plat. Certification of the installation, maintenance and proper removal of the erosion control facilities shall be required prior to recording of the plat. Applicant shall follow the recommendations contained in the geotechnical report. The applicant shall pay the appropriate Fire Mitigation Fee based on $0.52 per square foot of building area. The fee shall be paid at the time of building permit issuance. The applicant shall pay the appropriate Transportation Mitigation Fee based on a rate of $75.00 per each new average daily trip associated with the project, estimated at 1,037 trips. The fee shall be paid prior to the issuance of building permits. Comments on the above application must be submitted in writing to Keri Weaver, Senior Planner, Development Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on January 20, 2006. This matter is also tentatively scheduled for a public hearing on March 7,2006, at 9:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Development Services Division to ensure that the hearing has not been rescheduled at (425) 430-7282. If comments cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional information by mail, please contact the project manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Keri Weaver, Senior Planner; Tel: (425) 430-7382 PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, Development Planning, 1055 So. Grady Way, Renton, WA 98055. Name/File No.: Rainier Station/LUA05-155, SA-H, V-H, LLA, ECF NAME: MAILING ADDRESS: TELEPHONE NO.: I