HomeMy WebLinkAboutMFP20001951.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP20001951
IVR Number: 20001951
Permit Information
Permit Name: AT&T Franchise Permits
Address/Location:04/29/2020Application Date:9228900070Parcel Number: 203 S 4TH PL
Permit Type:05/12/2020Issue Date:Franchise
Permit Work Class:05/12/2021Expiration Date:Major Utility
Job Number: 19-170 - AT&T fiber pullFranchise Type:Telephone
Description: AT&T to proof and pull 408ct fiber in existing occupied conduit.
Contacts
Name Address PhoneTypeBilling
Kyle Conn
Cannon Construction Inc
Applicant
Greg Robert
AT&T
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Electrical Contractor: CANNOCI873CL
Construction Contractor: CANNOCI055CS
DSB COMMERCIAL PROPERTIES L 95 S TOBIN ST SUITE 201
RENTON , WA 98905
Owner
Cliff Roberts
AT&T Corp
11241 Willow Rd, 130
Redmond, WA 98052
Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Scott WarlickJustin Johnson5/12/20205/12/2020MFP20001951
Monday - Friday8:00AM - 3:00PMScott Warlick CED5/12/2020MFP20001951
19-170
MFP20001951
Work Hours:6am To 6pmMonday-FridayMFP20001951
Work Hours:6am To 6pmMonday-FridayMFP20001951
Work Hours:6am To 6pmMonday-FridayMFP20001951
5
6
7
8
9
5
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
CONTACTS:
PROJECT MAP:
N
CANNON
Sam Sartain-253-363-7384 saratain@cannonconstructioninc.com
AT&T
Greg Roberts-206-496-7976 gr255y@att.com
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -OVERVIEW
5-9 -DESIGN
408 CT FIBER: 2025 FT + 20% STORAGE = 2430 FT
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
2025 FT.
0 FT.
2025 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =2025 FT.
-PROOF & PULL (1) 408CT FIBER THROUGH EXISTING OCCUPIED
CONDUIT
203 S 4TH PL
RENTON, WA 98057
AT&T FIBER PULL
19-170
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
MFP20001951
N
EOP
FL
P
C
S
D
G
W
TS
T
ST
UT
ROW
DD DD DD DD
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
V
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CB
CB
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
LEGEND 2 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS
MFP20001951
GENERAL NOTES
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
GENERAL NOTES 3 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS
MFP20001951
PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
N
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
OVERVIEW 4 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS
MFP20001951
400
315 321
ROW ROW ROWROWROWEOP EOP
EOP EOP EOPEOPEOP EOP
EOPMH
N
SEE SHEET 6MATCHLINE OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
DESIGN 5 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS
PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
EXISTING MANHOLE
745'FIBER TIE
IN LOCATION
MFP20001951
200
212
300
211
322
220
215
316
211
222
ROW ROW ROWROWROWROWROWROWROW ROW ROWROWROWROWROWEOP
EOPEOPSHATTUCK AVE SSHATTUCK AVE SN
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
DESIGN 6 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS(745')PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
SEE SHEET 5MATCHLINE
SEE SHEET 7MATCHLINE
MFP20001951
315
205
220
207
201
319
301 305 309
325
ROWROWROW ROWROWROWROW ROW ROWROWROWROWROWROWROW
EOPEOP EOPEOPEOPMHSHATTUCK AVE SS 3RD ST
S 3RD PL
S 3RD ST
N
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
DESIGN 7 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS(745')PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT 880'PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
EXISTING MANHOLE
SEE SHEET 6MATCHLINE
SEE SHEET 8MATCHLINE
MFP20001951
407
440
314
414
408
415
404
327
416
416
409
408
400
417
406
336
ROWROWROWROWROW ROW ROW
ROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPSHATTUCK AVE SSHATTUCK AVE SSHATTUCK AVE SS 4TH PL
N
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
DESIGN 8 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS(880')PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
SEE SHEET 7MATCHLINE
SEE SHEET 9MATCHLINE
MFP20001951
ROWROWEOP
EOPMH
424
432
425
430
450
419 420418
433
231
241 ROWROWROWROWEOP
EOPROWROWROWROWROWROWEOPEOPEOPSHATTUCK AVE SSHATTUCK AVE SS 4TH PL
ROWROWROWROWMH
N
OF
DATE REVISION BY QC
CANNON COMPANIES
19-170AT&T RENTON TO TUKWILA AUGMENT
203 S 4TH PLRENTON, WA 98057
DESIGN 9 9
8/12/2019 DRAFTED BASE W/ GIS REF.MK SS(880')PROOF & PULL (1) 408CT
FIBER THROUGH EXISTING
OCCUPIED CONDUIT
EXISTING MANHOLE
SEE SHEET 8MATCHLINE
400'EXISTING MANHOLE
MFP20001951
MFP20001951