HomeMy WebLinkAboutCO 2CAG-19-243, CO #2-20 Terra Dynamics Sunset Park CO #1 Accurate Electric & Service Inc 1429 Ave D #356 Snohomish, WA 98290 Phone: 425-263-9477 Fax: 425-263-9156 Change Order #1 Date: April 17, 2020 Customer Name: Terra Dynamics Address: City: Zip: 9 Phone: Fax: E-mail: Site Address: Sunset Neighborhood Park Renton, WA Job Description: Re-route conduits for Rain Garden 1 – Go through and demo out the wires & all conduit that is going to be in the way of running new conduits 2 – Install (2) new 2” conduits from existing handhold over to the next one in line 3 – From the 2nd handhold, run a conduit straight over to the last pole for fiber 4 – From the 2nd handhold, run (1) conduit to each handhold. From there, over to where the light pole is Labor: 72hrs @ $85/per 6120.00 15% M/U 918.00 Total Labor 7038.00 Terra Dynamics Sunset Park CO #1 Material: 2092.07 15% M/U 313.81 Total Material 2405.88 Bid Price: $9443.00 One year warranty on all parts and labor Not included in price: Sales Tax Any additional work not stated Terms of Agreement Progressive Accept _____________ Signature: ________________________________________________ Steve Billington 425-263-9477 or 206-778-1186 Accurate Electric & Service Inc SNP2 COP-003 Relocate existing conduits at Raingarden 4/27/2020 Labor Rate/MH No.Hours Subtotal Foreman 64.26$ 1 4 257.04$ Group 4 Operator 66.23$ 1 6 397.38$ General Labor 61.72$ 2 6 740.64$ Labor 1,395.06$ Overhead 12%167.41$ Profit 6%93.75$ Total 1,656.22$ Equipment Rate/MH No.Hours Subtotal Takeuchi TB 285 Excavator 45.81$ 1 6 274.86$ Equipment 274.86$ Overhead 12%32.98$ Profit 6%18.47$ Total 326.31$ Materials Qty Unit Cost/Unit Subtotal Sand Bedding 2.00 Tons 24.00$ 48.00$ Materials 48.00$ Overhead 12%5.76$ Profit 6%3.23$ Total 56.99$ Subcontractors Qty Unit Cost/Unit Subtotal Accurate Electric 1 LS 9,443.00$ 9,443.00$ -$ Subcontactors 9,443.00$ Overhead 4%377.72$ Profit 4%392.83$ Total 10,213.55$ Small Tools 3%41.85$ Sub Total 12,294.92$ Insurance/bond 2.0%245.90$ GRAND TOTAL 12,540.81$ Vern Orr Vern Orr Project Manager SNP2 COP-002 Weather Days 3/10/2020 Labor Rate/MH No.Hours Subtotal Labor -$ Overhead 12%-$ Profit 6%-$ Total -$ Equipment Rate/MH No.Hours Subtotal Equipment Overhead 12% Profit 6%-$ Total -$ Materials Qty Unit Cost/Unit Subtotal Materials Overhead 12% Profit 6%-$ Total -$ Weather Days Date 1/6/2020 1/10/2020 1/14/2020 1/15/2020 1/16/2020 1/23/2020 1/28/2020 1/29/2020 1/31/2020 2/4/2020 2/5/2020 2/6/2020 2/7/2020 Total Days 13 Total Days 13 Vern Orr Vern Orr Project Manager