HomeMy WebLinkAboutMFP19001338.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19001338
IVR Number: 19001338
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:03/17/2019Application Date:3223059075Parcel Number: 18809 116TH AVE SE
Permit Type:05/20/2020Issue Date:Franchise
Permit Work Class:05/20/2021Expiration Date:Minor Utility
Job Number: 107057825Franchise Type:Natural Gas
Description: Installing tee tie in on existing 2" STW IP. Installing about 18' of MPE 2" main. Restoration Per City of Renton
standards.
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 395-6346Applicant
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRACL899CZ
Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Gas
107057825
Marita Bond
(253) 395-6346
marita.bond@pse.com
18809 116TH AVE SE
INSTALLING TEE TIE-IN ON EXISTING 2" STW IP (150' S C/L OF SE 188TH ST AND 12'W C/L ).
INSTALLING ABOUT 18' OF MPE 2"MAIN (26'N C/L ON TRACT E) UNTIL REACHING CUSTOMERS PROPERTY.
ASPHALT CUT/TRENCHING 18' IN HARD SURFACE
18' +/-
PSE/Infrasource (253) 395-6346
INFRASL871C2 BL.036742
3-17-19Marita G. Bond Digitally signed by Marita G. Bond DN: cn=Marita G. Bond, o=Municipal Relations, ou=Street Use Permitting, email=marita.bond@pse.com, c=US Date: 2019.03.17 16:16:40 -07'00'
MFP19001338
RESTORATION PER CITY OF RENTON STANDARDS
Scott Warlick 5/20/2020
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
107057825
PSE/Infrasource
Lee Brown (425) 417-8620
6905 S 228th St, Kent 98032
Lee.brown@PSE.COM
18809 116TH AVE SE
TBD
TBD
Marita Bond 3-17-19
Marita G. Bond Digitally signed by Marita G. Bond
DN: cn=Marita G. Bond, o=Municipal Relations, ou=Street Use Permitting, email=marita.bond@pse.com, c=US Date: 2019.03.17 16:18:18 -07'00'
MFP19001338
Scott Warlick
5/20/2020
8:00AM - 3:00PM
Monday - Friday
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
STOPSTOPUTILITYWORKAHEAD
W21-7
ONE LANEROADAHEAD CW20-4STOPW20-7A
ONE LANEROADAHEAD
CW20-4
UTILITYWORKAHEAD
W21-7
UTILITYWORKAHEAD
W21-7
ONE LANEROADAHEAD
CW20-4
W20-7A
18812100'100'
UTILITYWORKAHEAD
W21-7
ONE LANEROADAHEAD
CW20-4W20-7A
200'
200'
200'
200'
200'
200'
SE 188th St SE 188th St
SE 189th Pl
SE 189th Pl 116th Ave SE 116th Ave SE 116th Ave SE 116th Ave SE SE 189th Ln
SE 190th Ln
NOT TO SCALE
N
S
EW
NOTIFY EMS, FIRE
AND POLICE
72 HOURS IN ADVANCE
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
Designed By:
Robert Pratt
Off: 503-723-7287 Ext 1013
Cell # 503-539-0548
WATCP@KNDSERVICES.NET
WSTCS#010077
ORTCS#05152
PSE
Mitch Peterson
(425)-398-6071
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 10' lanes
3. Maintain local access
4. Notify Transit Authority
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
Legend
ConeONE LANEROADAHEAD CW20-4 one lane road ahead
Flagger
W20-7A Flagger AheadUTILITYWORKAHEADW21-7 utility work ahead
Work Area
Work Truck
INVENTORY:
4-UTILITY WORK AHEAD
4-ONE LANE ROAD AHEAD
3-FLAGGER AHEAD
2-FLAGGERS
20-CONES
18809 116th Ave SE
Renton WA
03/05/19 107057825
Tie into existing main GAS
107057825
MFP19001338
SE 188TH STREET
116TH AVE SETRACT DTRACT E 2'' STW IP 12'WCL (2'6'' D)5205-1963TRACT B
2'' STW IP 14'SCL
6205-1963
1/2'' STW-U
1970
5/8'' MPE
2007-E
110'S
5/8" PE IP
166'S
ELEC ONLY
FLOW60'
35'
20'42'WELEC ONLYN
Vicinity Map
47.434006, -122.187094
Owner / Developer Contact Info
officeATTN:
LAKHVIR SANDHU
9329 S 200TH ST
KENT, WA 98031
LAKHVIR SANDHU 206-617-7309
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
GENERAL NOTES - GAS (JOINT TRENCH):
1" = 30'105091126107057825Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two
working days prior to construction. 1-800-424-5555
Notify appropriate permitting agency prior to job start (see permit requirements).
Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion
and Sediment Control and any additional local jurisdiction requirements.
Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the
appropriate Engineer/Project Manager.
Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.
Check box on report for wire box (Test Lead) installation.
Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating
Standard 2525.2500.
To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on
this design, unless approved by the appropriate Engineer/Project Manager.
System MAOP denoted by System MAOP = 60 PSIG
Install Main Valves out of traffic where possible.
Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.
Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas
Operating Standards 2525.1200 and 2525.2300.
If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .
Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas
Field Procedures Manual 0812 and 0813.
Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.
Unless otherwise noted:
All pipes installed in plat to be 2" MPE-7.
All crossings to be Yellow 4" PVC.
All Services to be 1-1/8" PE.
/ denotes service stub location.
(________') denotes footage between fittings.
Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas
Operating Standards 2525.1500, 2525.1600 and 2525.1700.
Note all recordable footages, locations and material changes on the as-built in red.
Upon completion of the project send the print copy, along with the completed work order, listing crew & actual
materials used to the appropriate design group.
On site pre-con required before start of job.
At symbol: install natural gas main piping and fixtures. Size as indicated on tables and
work sketch (gas main is to parallel power system unless otherwise shown on work sketch).
Inclement weather conditions may cause delays in construction times and dates.
19.
20.
18.
16.
17.
15.
14.
13.
6.
9.
11.
12.
10.
8.
7.
3.
5.
4.
2.
1.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELEC Order Number
SAP Sup Order Nbr
PC APPROVAL
L.BROWN 425-417-8620 1/29/19
A.PAULSEN 253-259-1740 2/20/19
J.YANG 206-503-0706 2/7/19
REDT # ( RW-112629 )RENTON
HAEVIN RIDGE SHORT PLAT
2" MPE-7 GAS MAIN EXTENSION - 6 S/F LOTS
18809 116TH AVE SE, RENTON WA 98058
PUGET SOUND ENERGY
107057825
105091126
1" = 30'1 OF 1
KING 32 CIKNC
SE32-23N-05E 212.080 215.083
COMCAST
DANIEL LAROCHE
253-358-5460
CENTIRY LINK
KENNETH LUU
206-346-0144
RIGHT OF WAY
AMBER YANG
425-456-2774
PSE PROJECT MANAGER
LEE BROWN
425-417-8620
William Johnson 206-716-2730 2/11/2019
...
21.
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
507168794 107057825
N/A 106351893
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service Stubs
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Service/Meter
4680 06/11
GAS MAIN INSTALLATION/RETIREMENT
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
Cell Phone:
Project Manager Contact Information:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:LEE BROWN
425-417-8620
Lee.Brown@pse.com
William Johnson 206-716-2730
SITE PLAN
xx
INSTALL 2'' = 18 FT
JOINT 2'' = 244 FT
...
...
...
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
overlapping existing coating 3".
Tape wrap weld joint
Wrapped Steel Gas MainSteelPEPE Main
Transition Fitting
Test Lead Wires
Tracer Wire
CP Test Box
TYPICAL TEST LEAD CONNECTION FOR PE MAIN
NOT TO SCALE
CONNECTED TO WRAPPED STEEL MAIN
CP NOTES:
INSTALL PER PSE STANDARDS
(4510.1020 - FIG. 4) IF LOW
PSP READ. INSTALL 9LB ANODE
AND BRING WIRE UP IN BOX
WITH TEST LEAD OFF MAIN.
NOTIFY
CORROSION TECH. @ 206-716-2730
William Johnson
SITE
LAKH.SANDHU@GMAIL.COM
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
60 IP 132-60
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
INSTALL 2"MPE-7 18 FT
JOINT 2"MPE-7 244 FT
....
....
....
....
TEE 2"X2" INLINE STW IP
158'S C/L & 12'W C/L
_____'S C/L & _____'W C/L
POLYVALVE 2"MPE-7 OPEN
26'NCL, 50'WCL
( )'NCL, ( )'WCL INSTALL 2" MPE-7
1' @ 12'WCL
( )' @ ( )'WCL
2" T.L. & T.F.
158'SCL & 13'WCL
_____'S C/L & _____'W C/L
END OF MAIN
CAP 2"MPE-7
26'N C/L & 274'W C/L
_____'N C/L & _____'W C/L
BEGIN JOINT MAIN
26'NCL & 30'WCL
_____'N C/L & _____'W C/L
JOINT 2" MPE-7
224' @ 26'NC/L
(_______)'@ ( )'NCL JOINT 2" MPE-7
20' @ 30'W C/L
(_______)'@ ( )'WCL
GAS SERVICE PIPE TABLE
DESCRIPTION
OF
ACTIVITIES
LOCATION PIPE DESIGN AS-BUILT
FROM TO LOT
SIZE
(IN)TYPE
LENGTH
(FT)LOCATION
LENGTH
(FT)
EFV
SIZE LOCATION REMARKS
SS SINGLE 2" MAIN 1 1 1/8 MPE-7 10 ( ')WCL 2600
SS SINGLE 2" MAIN 2 1 1/8 MPE-7 10 ( ')WCL 2600
SS SINGLE 2" MAIN 3 1 1/8 MPE-7 10 ( ')ECL 2600
SS SINGLE 2" MAIN 4 1 1/8 MPE-7 10 ( ')WCL 2600
SS SINGLE 2" MAIN 5 1 1/8 MPE-7 10 ( ')WCL 2600
LS SINGLE 2" MAIN 6 1 1/8 MPE-7 45 ( ')SCL 2600
SS SINGLES =5 95 FT 1 1/8" PE PIPE 6 =TOTAL 2600 SERIES
LS SINGLES =1
NOT TO SCALE
CROSS SECTION - TRACT E
LOOKING WEST
N
35' ACCESS
PROP. 2" MPE IP - 26'NCL G
S
E
G
W 60' ACCESS
NOT TO SCALE
CROSS SECTION - 116TH AVE SE
LOOKING NORTH
EX 2" STW
IP - 12'W
GEX 5/8" PE IP - 166'S
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X1A P01 'A'NO GAS 2 80 1 30 PRIMARY
X01 'A'LOT 1 NO GAS 2 80 1 60 PRIMARY
X02 LOT 3 LOT 4 4 40 1 S 3 80 2 30 GAS MAIN, SECONDARY
4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 30 FT 2" SCH 80 GREY PVC = 90 FT 2" PVC PLUG /CAPS = 4
3" SCH 80 GREY PVC = 60 FT 3" PVC PLUG /CAPS = 4
INSTALL 2" MPE-7
17' @ 158'SCL
( )' @ ( )'SCL
NOTE: MUST HAVE A 5' CLEARANCE
FROM ANY WET UTILITIES
MFP19001338