HomeMy WebLinkAboutCO 2CAG-20-006, CO #2-20
CITY OF RENTON
Community Services Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAG-20-006 5/28/2020
CONTRACTOR: Emtech, LLC.
CHANGE ORDER: #2
SUMMARY OF PROPOSED CHANGE:
Reason/Justification: During construction, the Contractor discovered a pile assembly was floating several
inches above the existing footing. This Change Order addresses the modifications required for the
Contractor to replace the timber footing with a concrete strip footing as recommended by the Engineer.
DESCRIPTION:
Item
No.
Qty.
Description
Unit Price
Amount
w/ WSST
1
1
Pile Assembly Footing Replacement
$ 7,769.40
$ 8,546.34
Total this Change Order: 1 $ 8,546.34
ORIGINAL CONTRACT
AMOUNT (W/ WSST)
CURRENT CONTRACT
AMOUNT
NET CHANGE
THIS ORDER (W/ WSST)
REVISED CONTRACT
TOTAL AFTER CHANGE
$ 367,400.00
$ 384,328.23
$ 8,546.34
$ 392,874.57
Additional Calendar Days:
(0) No Extension of Time. Completion Date is December 30, 2020.
The payment specified and agreed to in this change order includes every claim by the contractor for any
extra payment with respect to the work described in this change order. The work covered by this change
order must be performed under the same terms and conditions as that included in the original
agreement. All of the other terms of the original agreement remain in effect.
SIGNATURES:
Contractor:: *,10 Date: 6/2/2020
�I�
Project Manager: Date 6/2/2020
0
emtech
To: Betsv Severtsen
NarKs Manning ana Natural Kesources
1055 S. Grady Way
Renton, WA 98057
Re: Replacing footing at location called out on RFI 001A
Scope of Changes:
Change Order
Emtech, LLC
1133 Kresky Ave. STE 106
Centralia, WA 98531
(360) 748-4891
Date:
5/28/20
CO No.
002
Rev#:
1
RFI No.
001A
Providing labor and materials to completely replace timber footing per sheet S-5, Sec. 4 of plans below pile
assembly as called out in RFI 001A (see attached RFI for reference).
Total price per attached breakdown: $7,769.40
State and local sales tax: included X not included
Extension of time: 0
We have proceeded with the work
X Work will not proceed without formal authorization
This price is good for 30 days from the above date, after which this request is subject to revision.
Sincerely,
»Pon
Ben Booher, General Manager
Emtech, LLC.
CHANGE ORDER REQUEST SUMMARY
Cedar River Bridge Repairs
PCO:
RR: �DATE:
DESCRIPTION:
Owner CPR/CCD #:
LABOR
HOURS
RATE
TOTAL
FIELD TECHNICIAN
24
X
$
68.00
- $
1,632.00
X
- $
X
- $
-
X
- $
X
- $
-
X
- $
-
X
- $
SUBTOTAL
$
1,632.00
SMALL TOOL ALLOWANCE @
0.00%
$
-
SUBTOTAL
$
1,632.00
MARK-UP @
15.00%
$
244.80
TOTAL LABOR
$
1,876.80
MATERIALS/EQUIPMENT
PHASE CODE UNITS
RATE
Concrete
X
$
800.00
$
800.00
Hardware
X
$
500.00
- $
500.00
Form
X
$
259.00
- $
259.00
Shoring
X
$
1,739.00
- $
1,739.00
Rebar
X
$
600.00
- $
600.00
Bases
X
$
1,226.00
- $
1,226.00
SUBTOTAL
$
5,124.00
USE TAX ON MATERIALS AND EQUIPMENT
0.00%
$
-
MARK-UP @
15.00%
$
768.60
TOTAL MATERIAL/EQUIPMENT
$
5,892.60
SUBCONTRACTS
PHASE CODE UNITS
RATE
X
- $
-
X
- $
-
X
- $
X
$
X
$
X
$
-
X
$
SUBTOTAL
$
-
MARK-UP @
6.00%
$
TOTAL SUBCONTRACTS
$
-
PROPOSAL SUBTOTAL
$
7,769.40
BONDS/Liability/Builders Risk/B&O Tax
0.00%
$
-
PROPOSAL TOTAL
$
7,769.40
CITY OF RENTON TRANSMITTAL LETTER
• Community Services Department
Parks Planning and Natural Resources
.
To: David Reich Transmittal No.: RFI #001A Response
Address: Emtech Date: 05.20.20
1133 Kresky Ave. Suite 106 Copy to: Micah Carlson, Adrianah Heike, Alan
Centralia, WA 98531 Wyatt, Leslie Betlach, Garth Nelson
Contract #
CAG-20-006
Routing
Sent
Received
Project Title
Cedar River Trestle Bridge Repairs
Contractor
X
Owner
X
X
Contractor
Emtech, LLC
Consultant
X
X
Owner
I X
I X
Contractor
I
I X
X❑Attached
X❑For Your Information
❑Returned for corrections
Under separate cover via
For review and comment
Request for Information
11
[]Approved as Noted
Remarks:
Attached RFI Response 001A. City of Renton requests that Emtech provide a Scope of Work proposal for City's
connsideration to perform the recommendations outlined by the Engineer in the RFI Response.
Item
No.
Copies
Date
Spec.
Section
Description
Rev. Action
Reviewer
Comments
1
1
05.20.20
Dwgs. S-1
Pile Assembly and Footing
As Noted
WSP
As Noted
NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item
MA. We have verified that the material or equipment contained in this submittal meets all the requirements,
including coordination with all related Work, as specified, no exceptions.
F-1B. We have verified that the material or equipment contained in this submittal meets all the requirements
specified, except the attached deviations.
No. Deviation
Submitted by: Betsy Severtsen Date: 05.20.20
1055 South Grady Way, 6th Floor; Renton, WA 98057
0
tech
Request for Information
Project Name: I Cedar River Trail Trestle Bridge Repairs
To: Parks Planning & Natural Resources
1055 S. Grady Way
Renton, WA 98057
Attn: Betsy Severtsen
Action Requested X Clarification Possible Effect
X Direction
Approval
Alternate Proposal
Other:
Reference Drawing No: S-1
RFI
Emtech,LLC
1133 Kresky Ave STE 106
Centralia, WA 98531
360-748-4891
Contract No. CAG-20-006
RFI No. 001
Date: 5/19/20
Desired Response: 5/21/20
Increase/Decrease Cost
Increase/Decrease Time
No Change
Detail No: Spec. Section: Article:
Description: The pile assembly circled in red (see attached) is floating several inches above the old timber footing. It is
hanging from the bridge, completely free from the old footing. Our crew noticed this after clearing away some brush to begin
shoring. We would like to confirm the five locations that will recieve concrete footings as called out in the plans are correct.
Adrianah Heike, Asst. Project Manager, Emtech LLC
Subm fitter
Response:
In review of the for construction plans, from April 2020 and the previous inspection reports the footings to
be replaced at bents 3,4,6,7, and 17 are correct. Looking at photos from previous inspection it appears
that this footing has settled and it is our recommendation that this footing be replaced as shown on the
attached concrete strip footing sketch.
Respondent
20 May 2020
Date
L
C
L
z
O
w
Q NIW
«0 L
Un
X
Q
+"U
m
O
O
O
O
O
O
z
F—
O
O
LL
F—
W
F-
W
V
Z
O
V
Zo
O'
c�
� II
r-I
V w
W a
N U
cn
0
N
0
N
m
0
N
U
(D
U)
CL
Cl)
i
SINHWIIDOQ QIS "
ry
w m -��I �
Jo
a.
I
Ja z
Loy _- - _ w N
¢
w saf w � a3F a3E I I "' 0_ � o
o .. Oil
®
I I ¢ z
i W
u o > O
M013933S3NMIM p tea oo ¢ LL
—__—__—__—__—__— a N x0 a
rZ w U
G
I I I z
I I I I U
I I I I
I I c
I I Y
I I I I
I I _
LIJ
I I I I
I I * I I L
I �M a H
I I
I I a I I
I I I I J
I I I I a
I I
I I I s„9-,95 I Z
I N I I I O
I m I I I
a'
z all
Z�
g ' 4
ori
I I I m I
I I I I
I I
I i F I I
I I *I * I
I I I I
I I I O H
I I
I I I I
I I
I I I I
� a�a
I --
�� o
o i m I I
a
3AOSV 33S 3NnH7ItlW OOP
0
I
I I
'psNe6eN siq&8 IIN .ouI VS(1 dSM a 14BuAAoO 6s'P'LOS Zps6xQ�gOtl LOL00'6LMSLGAkMIs+sPs3,D'ell� WV BSB 6LOL'B �sO:uo 6LOSL9NO5f1:M GsnsS lss�