HomeMy WebLinkAboutSC_Submittal_Requirements_200513_V1DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
1
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev: 07/2019
VA SUBMITTAL REQUIREMENTS
VARIANCE
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7294 | www.rentonwa.gov
PURPOSE: A means by which citizens may be granted relief from the strict application of the provisions
of certain land use regulations. The process is intended to review situations where uniform
requirements would unduly burden one property more than other properties in the vicinity.
FREE CONSULTATION MEETING: Prior to submitting an application, the applicant should informally
discuss the proposed development with the Planning Division. The Planning Division will provide
assistance and detailed information on the City’s requirements and standards. Applicants may also take
this opportunity to request the waiver of the City’s typical application submittal requirements, which
may not be applicable to the specific proposal. For further information on this meeting, see the
instruction sheet entitled “Submittal Requirements: Pre-Application.”
APPLICATION SCREENING: Applicants are required to bring in a CD or USB portable (flash/hard) drive
(or other device or pathway as approved by your assigned project manager) with one PDF file of the
application package for informal review by staff, prior to scheduling an intake meeting. Please allow
approximately 45 minutes for application screening.
COMPLETE APPLICATION REQUIRED: In order to accept your application, each of the numbered items
must be submitted at the same time. If you have received a prior written waiver of a submittal item(s)
during a pre-application meeting, please provide the waiver form in lieu of any submittal item not
provided.
APPLICATION SUBMITTAL HOURS: Applications should be submitted to Planning Division staff at the
6th floor counter of Renton City Hall, 1055 South Grady Way, between 8:00 a.m. and 4:00 p.m. Monday
through Friday. Please call your assigned project manager to schedule an appointment or call 425-430-
7294 to reach the Planning Division. Due to the screening time required, applications delivered by
messenger cannot be accepted.
ADDITIONAL PERMITS: Additional permits from other agencies may be required. It is the applicant’s
responsibility to obtain these other approvals. Information regarding these other requirements may be
found at http://apps.oria.wa.gov/opas/.
All Plans and Attachments are subject to Electronic File Standards
2
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
APPLICATION MATERIALS:
1. Pre-Application Meeting Summary: If the application was reviewed at a “pre-application
meeting.”
2. Waiver Form: If you received a waiver form during or after a “pre-application meeting.”
3. Master Application Form: The standardized application form used for the majority of land
use permit applications including, but not limited to, the following:
a. Owner, applicant, and contact person names, addresses and telephone numbers;
b. Notarized signatures of all current property owners;
c. Name of the proposed project;
d. Project/property address;
e. King County Assessor’s tax account number;
f. Existing and proposed land uses;
g. Existing and, if applicable, proposed Comprehensive Plan map designation;
h. Existing and, if applicable, proposed zoning designation;
i. Site area;
j. Estimated project cost;
k. Whether or not the project site contains any environmentally sensitive areas; and
l. Property legal description.
4. Fees: The application must be accompanied by the required application fee (see Fee
Schedule). Please call 425-430-7294 to verify the exact amount required. Checks should be
made out to the City of Renton and cannot be accepted for over the total fee amount.
Credit cards may also be used to pay required application fees. Fees are paid at Cashier on
the 1st Floor City Hall.
5. Project Narrative: A clear and concise description and summary of the proposed project,
including the following:
a. Project name, size and location of site;
b. Zoning designation of the site and adjacent properties;
3
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
c. Current use of the site and any existing improvements;
d. Special site features (i.e., wetlands, water bodies, steep slopes);
e. Statement addressing soil type and drainage conditions;
f. Proposed use of the property and scope of the proposed development (i.e., height,
square footage, lot coverage, parking, access, etc.);
g. Proposed off-site improvements (i.e., installation of sidewalks, fire hydrants, sewer
main, etc.);
h. Total estimated construction cost and estimated fair market value of the proposed
project;
i. Estimated quantities and type of materials involved if any fill or excavation is proposed;
j. Number, type and size of trees to be removed;
k. Explanation of any land to be dedicated to the City; and
l. For shoreline applications only:
i. Name of adjacent water area or wetlands,
ii. Nature of existing shoreline – describe:
Type of shoreline (i.e., lake, stream, lagoon, marsh, bog, floodplain,
floodway);
Type of beach (i.e., accretion, erosion, high bank-low bank);
Type of material (i.e., sand, gravel, mud, clay, rock, riprap); and
The extent and type of any bulkheading, and
iii. The number and location of structures and/or residential units (existing and
potential) which might have views obstructed as a result of the proposed
project; and
m. The proposed number, size, and density of the new lots, for subdivision applications
only.
6. Variance Request Justification: Please provide a written statement separately addressing
and justifying each of the issues to be considered by the City. The burden of proof as to the
appropriateness of the application lies with the applicant. In order to approve a variance
request, the Reviewing Official must find ALL the following conditions exist:
The applicant suffers practical difficulties and unnecessary hardship and the variance
is necessary because of special circumstances applicable to subject property,
including size, shape, topography, and location or surroundings of the subject
property, and the strict application of the Zoning Code is found to deprive subject
property owner of rights and privileges enjoyed by other property owners in the
vicinity and under identical zone classification;
The granting of the variance will not be materially detrimental to the public welfare
or injurious to the property or improvements in the vicinity and zone in which
4
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
subject property is situated;
The approval shall not constitute a grant of special privilege inconsistent with the
limitation upon uses of other properties in the vicinity and zone in which the subject
property is situated; and
The approval is the minimum variance that will accomplish the desired purpose.
7. Density Worksheet
https://edocs.rentonwa.gov/Documents/ElectronicFile.aspx?docid=955782&dbid=1&repo=
CityofRenton
8. Plat Certificate or Title Report: Please provide a current Plat Certificate or Title Report
obtained from a title company documenting ownership and listing all encumbrances of the
involved parcel(s). The Title Report should include all parcels being developed, but no
parcels that are not part of the development. If the Plat Certificate or Title Report
references any recorded documents (i.e. easements, dedications, covenants), the
referenced recorded document(s) must also be provided. All easements referenced in the
Plat Certificate must be located, identified by type and recording number, and dimensioned
on the Site Plan.
9. Neighborhood Detail Map: A map, drawn at a scale of one inch equals one hundred feet (1"
= 100') or one inch equals two hundred feet (1" = 200') (or other scale approved by the
Planning Division Director or designee). The map shall show the location of the subject site
relative to the property boundaries of the surrounding parcels within approximately one
thousand feet (1,000') or approximately two thousand five hundred feet (2,500') for
properties over five (5) acres and identifying the subject site with a darker perimeter line
than that of surrounding properties. The map shall also show the property’s lot lines,
existing land uses, building outlines, City boundaries of the City of Renton (if applicable),
north arrow (oriented to the top of the plan sheet), graphic scale used for the map, and City
of Renton (not King County) street names for all streets shown.
10. Affidavit of Installation of Public Information Sign(s): A notarized statement signed by the
applicant of applicant’s representative attesting that the required public information sign(s)
has been installed in accordance with City Code requirements.
11. Site Plan: A single fully dimensioned plan sheet drawn at a scale of one inch equals twenty
feet (1" = 20') (or other scale approved by the Planning Division Director or designee) clearly
indicating the following:
a. Name of proposed project;
b. Date, scale, and north arrow oriented to the top of the plan sheet;
c. Drawing of the subject property with all property lines dimensioned and names of
adjacent streets;
d. Widths of all adjacent streets and alleys;
5
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
e. The location of all existing public improvements including, but not limited to, curbs,
gutters, sidewalks, median islands, street trees, fire hydrants, utility poles, etc., along the
full property frontage;
f. Location and dimensions of existing and proposed structures, parking and loading areas,
driveways, existing trees on and abutting the site, existing or proposed fencing or
retaining walls, freestanding signs, easements, refuse and recycling areas, freestanding
liquid fixtures, utility junction boxes, public utility transformers, storage areas, buffer
areas, open spaces, and landscaped areas;
g. The location and dimensions of natural features such as streams, lakes, marshes and
wetlands. Include boundaries of utility, open space, and/or critical area(s) tracts, square
footage, and purpose statement of each tract. Clearly delineate the critical area and
buffer boundaries within the tract and indicate a dimension for buffer width;
h. Ordinary high water mark, existing and proposed, and name of water body if applicable;
i. For wireless communication facilities, indicate type and locations of existing and new
plant materials used to screen facility components and the proposed color(s) for the
facility;
j. A legend listing the following must be included on one of the site plan sheets:
i. Total square footage of the site,
ii. Square footage (by floor and overall total) of each individual building and/or use,
iii. Total square footage of all buildings (footprint of each building),
iv. Percentage of lot coverage,
v. Square footage of all landscaping (total, parking lot, and wildlife habitat),
vi. Allowable and proposed building height,
vii. Building setbacks required by Code,
viii. Proposed building setbacks,
ix. Parking analysis, including:
• Number of stalls required, by use; number of stalls provided, by use,
• Sizes of stalls and angles,
• Location and number of handicap stalls, compact, employee and/or guest
parking stalls,
• Location and size of curb cuts,
• Traffic flow within the parking, loading, and maneuvering areas and ingress
and egress,
• Location of wheel stops,
• Loading space,
• Stacking space,
• Location and dimensions of bicycle racks, carpool parking spaces, and other
facilities designed to accommodate access to the site,
• Square footage of interior parking lot landscaping;
6
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
k. Footprint of all proposed buildings showing the location of building entrances, window
openings, and landscape features (required for Urban Center Design Overlay District
review packet only);
l. Footprint of all abutting and adjacent buildings showing the location of building
entrances, window openings, and landscape features (required for Urban Center Design
Overlay District review packet only);
m. For nonconforming use or structure rebuild approval permits: draw on the scaled plan
the exact sizes and locations of existing structures and uses, whether damaged or not;
write on the scaled plan the dates these structures/uses were established; on a separate
sheet, identify the subject property, abutting lots and buildings and list adjacent and
abutting land uses.
12. Landscape Analysis, Lot Coverage, and Parking Analysis (For commercial/industrial
properties only): Please provide a landscape and parking analysis including:
Total square footage of the site and the footprints of all buildings
Total square footage of existing and proposed impervious surface area(s)
Square footage (by floor and overall total) of each individual building and/or use
Percentage of lot covered by buildings or structures
Number of parking spaces required by City code
Number and dimensions of standard, compact, and ADA accessible spaces provided
Square footage of parking lot landscaping (perimeter and interior)
13. Floor Plans: A basic line drawing plan of the general building layout showing walls, exits,
windows, and designated uses indicating the proposed locations of kitchens, baths and floor
drains, bedrooms and living areas, with sufficient detail for City staff to determine if an
oil/water separator or grease interceptor is required and to determine sizing of side sewer.
14. Tree Retention/Land Clearing (Tree Inventory) Plan: A completed tree retention worksheet
accompanied by a full dimensional plan, drawn by a certified arborist or a licensed
landscape architect, based on finished grade, drawn at the same scale as the project site
plan with the northern property line at the top of the sheet, clearly showing the following:
a. All property boundaries and adjacent streets;
b. Location of all areas proposed to be cleared;
c. Species and sizes of vegetation to be removed, altered or retained and the boundaries
and predominant species of stands of trees consisting of five (5) or more trees. This
requirement applies only to trees six inch (6") caliper and larger, fifty four inches (54")
above grade, and the location, size and species of all protected trees on the site;
d. For trees proposed to be retained, a complete description of each tree’s health,
condition, and viability;
e. For trees proposed to be retained, a description of the method(s) used to determine the
limits of disturbance (i.e., critical root zone, root plate diameter, or a case-by-case basis
7
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
description for individual trees);
f. For trees proposed to be preserved within a tree protection tract, any special
instructions for maintenance (e.g., trimming, ground clearing, root pruning, monitoring,
aftercare, etc.);
g. For trees not viable for retention, the reason(s) for removal based on poor health, high
risk of failure due to structure, defects, unavoidable isolation (i.e., high blow down
potential), or unsuitability of species, etc., and for which no reasonable alternative
action is possible (pruning, cabling, etc.);
h. A description of the impact of necessary tree removal to the remaining trees, including
those in a grove or on abutting properties;
i. For development applications, a discussion of timing and installation of tree protection
measures that must include fencing and be in accordance with the tree protection
standards as outlined in RMC 4-4-130H9, Protection Measures During Construction;
j. The suggested location and species of supplemental trees to be used when required.
The report shall include planting and maintenance specifications;
k. Future building sites and drip lines of any trees which will overhang/overlap a
construction line;
l. Location and dimensions of rights-of-way, utility lines, fire hydrants, street lighting, and
easements;
n. Where the drip line of a tree overlaps an area where construction activities will occur,
this shall be indicated on the plan;
o. For allowed activities, including allowed exemptions, modifications, and variances, show
all trees proposed to be removed in priority tree retention areas: slopes twenty five
percent (25%) to thirty nine percent (39%), high or very high landslide hazard areas, and
high erosion hazard areas;
p. Show trees to be removed in protected critical areas: wetlands, Shorelines of the State,
streams and lakes, floodways, floodplain slopes forty percent (40%) or greater, very high
landslide hazard areas, and critical habitat if the activity is exempt or allowed by the
critical areas regulations in RMC 4-3-050C3, Exemptions – Critical Areas and Buffers;
q. Show all trees to be retained in critical area buffers; and
r. In all other areas of the site, trees to be removed may be indicated generally with
clearing limit lines except for protected trees. The location, size, and species of all
protected trees on a site shall be shown. The plan shall also differentiate any approved
replacement trees from the protected trees. Replacement trees may be authorized in
accordance with RMC 4-4-130H1e, Replacement Requirements, and the number of
replacement trees shall be determined pursuant to any planned replanting areas in
accordance with RMC 4-4-130H1c, Calculating Tree Retention.
15. Tree Retention Worksheet: Please provide a completed City of Renton tree retention
worksheet.
8
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
https://edocs.rentonwa.gov/Documents/1/edoc/955781/Tree%20Retention%20Worksheet
.pdf
16. Arborist Report: A report prepared by a certified arborist or licensed landscape architect
that correlates with the Tree Retention/Land Clearing Plan and identifies size, species,
health, and reason for any removal. The report shall identify the limits of disturbance for all
retained trees.
17. Wetland Assessment: A wetland assessment includes the following:
a. A description of the project and maps at a scale no smaller than one inch equals two
hundred feet (1" = 200') showing the entire parcel of land owned by the applicant and
the wetland boundary surveyed by a qualified surveyor, and pursuant to RMC 4-3-050F2,
Plans and Studies Required;
b. A description of the vegetative cover of the wetland and adjacent area including
identification of the dominant plant and animal species;
c. A site plan for the proposed activity at a scale no smaller than one inch equals two
hundred feet (1" = 200') showing the location, width, depth and length of all existing and
proposed structures, roads, stormwater management facilities, sewage treatment and
installations within the wetland and its buffer;
d. The exact locations and specifications for all activities associated with site development
including the type, extent and method of operations;
e. Elevations of the site and adjacent lands within the wetland and its buffer at contour
intervals of no greater than five feet (5') or at a contour interval appropriate to the site
topography and acceptable to the City;
f. Top view and typical cross-section views of the wetland and its buffer to scale;
g. The purposes of the project;
h. Such other information as may be needed by the City, including but not limited to a
study of hazards if present on site, the effect of any protective measures that might be
taken to reduce such hazards; and any other information deemed necessary to verify
compliance with the provisions of this Section. (Ord. 4587, 3-18-1996; Amd. Ord. 4835,
3-27-2000; Ord. 5137, 4-25-2005; Ord. 5757, 6-1-2015)
Note: Please provide a map and a report if ANY wetlands are located on the subject
property or within 100 feet of the subject property. The wetland report/ delineation must
be prepared by a qualified professional and include the information specified in RMC 4-8-
120D.23. In addition, if any alteration to the wetland or buffer is proposed, a wetland
mitigation plan is also required. See RMC 4-8-120D.23 for plan content requirements.
18. Wetland Mitigation Plan-Preliminary: A preliminary wetland mitigation plan shall include
the following:
a. A site plan demonstrating sufficient area for replacement ratios;
b. Proposed planting scheme for created, restored, and enhanced wetlands;
9
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
c. Written report, formatted to eight and one-half inches (8.5") by eleven inches (11"),
shall include:
i. Identifying direct and indirect impacts of the project to the wetland area and
wetland functions, environmental goals and objectives, and performance
standards, and evaluating alternative methods of developing the property using
the following criteria in this order:
• Avoiding any disturbances to the wetland or buffer;
• Minimizing any wetland or buffer impacts;
• Compensating for any wetland or buffer impacts;
• Restoring any wetlands or buffer impacted or lost temporarily;
• Creating new wetlands and buffers for those lost; and
• Enhancing an existing degraded wetland to compensate for lost functions
and values, in addition to restoring a wetland or creating a wetland.
ii. Evaluating each of the mitigation plan criteria found in RMC 4-3-050L.
iii. For projects proposing a reduction in wetland buffer width with enhancement,
providing a detailed analysis of the project’s compliance with each of the following
criteria:
• The reduced buffer will function at a higher level than the standard
buffer;
• An enhanced buffer shall never be less than seventy five percent (75%) of
the standard width at its narrowest point; and
• The buffer area has less than fifteen percent (15%) slopes and no direct
or indirect, short-term or long-term, adverse impacts to regulated
wetlands, as determined by the City, will result from a regulated activity;
and
• The proposal shall rely upon a site-specific evaluation and documentation
of buffer adequacy based upon Wetlands in Washington State, Volume 1:
A Synthesis of the Science (Ecology Publication No. 05-06-006, March
2005) and Wetlands in Washington State, Volume 2: Managing and
Protecting Wetlands (Ecology Publication No. 04-06-008, April 2005), or
similar approaches; and
• The proposed buffer standard is based on consideration of the best
available science as described in WAC 365-195-905.
iv. And, for projects proposing averaging in wetland buffer width with enhancement,
providing a detailed analysis of the project’s compliance with each of the following
criteria:
• There are existing physical improvements in or near the wetland and
buffer; and
10
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
• That width averaging will not adversely impact the wetland function and
values; and
• That the total area contained within the wetland buffer after averaging is
no less than that contained within the required standard buffer prior to
averaging; and
• A site-specific evaluation and documentation of buffer adequacy based
upon Wetlands in Washington State, Volume 1: A Synthesis of the
Science (Ecology Publication No. 05-06-006, March 2005) and Wetlands
in Washington State, Volume 2: Managing and Protecting Wetlands
(Ecology Publication No. 04-06-008, April 2005), or similar approaches
have been conducted. The proposed buffer standard is based on
consideration of the best available science as described in WAC 365-195-
905; and
• In no instance shall the buffer width be reduced by more than seventy
five percent (75%) of the standard buffer. Greater buffer width
reductions require review as a variance pursuant to RMC 4-9-250B; and
• An analysis of the effectiveness of the proposed Buffer Enhancement.
(Ord. 4835, 3-27-2000; Ord. 5137, 4-25-2005; Ord. 5757, 6-1-2015)
19. Standard Stream or Lake Study: A report shall be prepared by a qualified biologist and
include the following information:
a. Site Map: Site map(s) indicating, at a scale no smaller than one inch equals twenty feet
(1" = 20') (unless otherwise approved by the Community and Economic Development
Administrator):
i. The entire parcel of land owned by the applicant, including one hundred feet (100')
of the abutting parcels through which the water body(ies) flow(s);
ii. The ordinary high water mark (OHWM) determined in the field by a qualified
consultant pursuant to RMC 4-3-050G7, Streams and Lakes, (the OHWM must also
be flagged in the field);
iii. Stream or lake classification, as recorded in the City of Renton’s COR Maps, the
City’s online interactive mapping application available through the City’s website,
for the City of Renton Water Class or RMC 4-3-090 (if unclassified, see
“Supplemental Stream or Lake Study” below);
iv. Topography of the site and abutting lands in relation to the stream(s) and its/their
buffer(s) at contour intervals of two feet (2') where slopes are less than ten
percent (10%), and of five feet (5') where slopes are ten percent (10%) or greater;
v. One hundred (100) year floodplain and floodway boundaries, including one
hundred feet (100') of the abutting parcels through which the water body(ies)
flow(s);
vi. Site drainage patterns, using arrows to indicate the direction of major drainage
11
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
flow;
vii. Top view and typical cross-section views of the stream or lake bed, banks, and
buffers to scale;
viii. The vegetative cover of the entire site, including the stream or lake, banks, riparian
area, and/or abutting wetland areas, extending one hundred feet (100') upstream
and downstream from the property line. Include position, species, and size of all
trees of at least six inch (6") caliper and larger, fifty four inches (54") above grade,
and the location, size and species of all protected trees on the site that are within
one hundred feet (100') of the OHWM, and the location of measures to protect
trees on and abutting the site;
ix. The location, width, depth, and length of all existing and proposed structures,
roads, stormwater management facilities, wastewater treatment and installations
in relation to the stream/lake and its/their buffer(s); and
x. Location of site access, ingress and egress.
b. Grading Plan: A grading plan prepared in accordance with RMC 4-8-120D7, and showing
contour intervals of two feet (2') where slopes are less than ten percent (10%), and of
five feet (5') where slopes are ten percent (10%) or greater.
c. Stream or Lake Assessment Narrative: A narrative report, formatted to eight and one-
half inches (8.5") by eleven inches (11"), shall be prepared to accompany the site plan
and describes:
i. The stream or lake classification as recorded in the City of Renton’s COR Maps, the
City’s online interactive mapping application available through the City’s website,
for the City of Renton Water Class or RMC 4-3-090;
ii. The vegetative cover of the site, including the stream or lake, banks, riparian area,
wetland areas, and flood hazard areas extending one hundred feet (100') upstream
and downstream from the property line, including the impacts of the proposal on
the identified vegetation;
The ecological functions currently provided by the stream/lake and existing
riparian area and the impacts of the proposal on the identified ecological
functions;
Observed or reported fish and wildlife that make use of the area including,
but not limited to, salmonids, mammals, and bird nesting, breeding, and
feeding/foraging areas, including the impacts of the proposal on the
identified fish and wildlife;
Measures to protect trees, as defined in RMC 4-11-200, and vegetation; and
For shorelines regulated under RMC 4-3-090, Shoreline Master Program Regulations,
the study shall demonstrate if the proposal meets the criteria of no net loss of
ecological functions as described in RMC 4-3-090D2. If the proposal requires mitigation
for substantial impacts to the existing vegetation buffer in order to demonstrate no
net loss of ecological functions, a supplemental stream or lake study is required.
12
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
Note: Please provide a report containing the information specified in RMC Section 4-8-
120D.19. In addition, if the project involves an unclassified stream, a supplemental stream
or lake study is also required. If any alteration to a water-body or buffer is proposed a
supplemental stream or lake study and mitigation plan are also required.
20. Flood Hazard Data: Flood hazard data includes:
a. Plans in duplicate drawn to scale showing the nature, location, dimensions, and
elevations of the area in question; existing or proposed structures, fill, storage of
materials, drainage facilities, and the location of the foregoing;
b. Elevation in relation to mean sea level of the lowest floor (including basement) of all
structures;
c. Elevation in relation to mean sea level to which any structure has been floodproofed;
d. Certification by a registered professional engineer or architect that the floodproofing
methods criteria in RMC 4-3-050I3c; and for any nonresidential structure meet the
floodproofing; and
e. Description of the extent to which a watercourse will be altered or relocated as a result
of proposed development.
21. Biological Assessment/Critical Areas Study: All development projects located in a
floodplain and projects with the potential to impact fish (Chinook salmon, bull trout,
steelhead trout), unexpected, new, rare or other endangered species habitat (bald eagles)
shall provide a biological assessment/critical area study. The purpose of this assessment is
to determine whether a proposed action is likely to: (1) adversely affect listed or de-listed
species or designated critical habitat; (2) jeopardize the continued existence of species that
are proposed for listing, or unexpected, new or rare species; or (3) adversely modify
proposed critical habitat. A biological assessment/critical area study is a written study that
evaluates the proposal, all probable impacts and risks related to the critical area, and
recommends appropriate mitigation measures to adequately protect the functions and
values of the critical area, and preserve anadromous fish and their habitat.
The assessment/study shall be prepared by a person with experience and training in the
scientific discipline appropriate for the relevant critical area in accordance with WAC 365-
195-095(4). A qualified professional must have obtained a B.S. or B.A. or equivalent degree
in biology, engineering, environmental studies, fisheries, geomorphology, biological
assessment, or related field, and have at least five (5) years of related work experience.
a. A qualified professional for wetlands must be a professional wetland scientist with at
least two (2) years of full-time work experience as a wetlands professional, including
delineating wetlands using the federal manuals and supplements, preparing wetlands
reports, conducting function assessments, and developing and implementing mitigation
13
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
plans.
b. A qualified professional for Habitat conservation must have a degree in biology or a
related degree and professional experience related to the subject species.
c. A qualified professional for a geological hazard must be a professional engineer or
geologist, licensed in the state of Washington.
d. A qualified professional for Wellhead Protection Areas means a hydrogeologist,
geologist, engineer, or other scientist with experience in preparing hydrogeologic
assessments.
The assessment/study shall use scientifically valid methods and studies in the analysis of
critical area data and field reconnaissance and reference the source of the material used.
Best available science is that scientific information applicable to the critical area prepared
by local state or federal natural agencies or a qualified scientific professional that is
consistent with the criteria established in WAC 395-195-900 through 365-195-925.
The assessment/study shall contain, at a minimum, the following information, as applicable:
a. The name and contact information of the applicant;
b. The dates, names, and qualifications of the persons preparing the assessment/study and
documentation of any fieldwork performed on the site;
c. A description of the proposal and identification of the permits requested;
d. A site plan showing:
i. Identified critical areas, buffers and the development proposal with dimensions;
ii. Topography at two-foot (2') intervals;
iii. Limits of any areas to be cleared/impacted; and
iv. A description of the proposed stormwater management plan for the
development and consideration of impacts to drainage alterations;
e. Accurate identification, location, and characterization of critical areas, water bodies, and
buffers adjacent to the proposed project area or potentially impacted by the proposed
project;
f. A statement specifying the accuracy of the assessment/study, assumptions used in the
assessment/study, and explaining how best available science has been incorporated;
g. Determination of the degree of hazard and risk from the proposal both on the site and
on surrounding properties;
h. An assessment of the probable cumulative impacts to the critical areas, their buffers
and other properties resulting from the proposal;
i. An evaluation of the project’s compliance with sections 7 and 9 of the Endangered
Species Act;
j. A description of reasonable efforts made to apply mitigation sequencing to avoid,
14
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
minimize, and mitigate impacts to critical areas;
k. Plans for adequate mitigation to offset any impacts and an explanation of how best
management practices will be used to minimize impacts to critical area; and
l. Recommendations for maintenance, short-term and long-term monitoring, contingency
plans and security requirements.
22. Habitat Data Report: Habitat data reports include:
a. Site Plan: The site plan shall indicate:
i. The vegetative cover types reflecting the general boundaries of the different
plant communities on the site;
ii. The exact locations and specifications for all activities associated with site
development including the type, extent and method of operations;
iii. Top view and typical cross-section views of critical habitat/wildlife habitat to
scale;
iv. The results of searches of the State Department of Fish and Wildlife’s Natural
Heritage and Non-Game Data System databases;
v. The results of searches of the Washington State Department of Fish and Wildlife
Priority Habitat and Species database.
b. Narrative Report: A narrative report shall be prepared to accompany the site plan which
describes:
i. The layers, diversity and variety of habitat found on the site;
ii. The location of any migration or movement corridors;
iii. The species typically associated with the cover types, including an identification
of any critical wildlife species that might be expected to be found;
iv. Identification of any areas that have been previously disturbed or degraded by
human activity or natural processes;
v. A summary of existing habitat functions and values, utilizing a habitat
evaluation procedure or methodology approved by the City;
vi. A summary of proposed habitat alterations and impacts and proposed habitat
management program. Potential impacts may include but are not limited to
clearing of vegetation, fragmentation of wildlife habitat, expected decrease in
species diversity or quantity, changes in water quality, increases in human
intrusion, and impacts on wetlands or water resources. (Ord. 4835, 3-27-2000)
23. Geotechnical Report: A study prepared in accordance with generally accepted geotechnical
practices and stamped by a professional engineer licensed in the State of Washington which
includes soils and slope stability analysis, boring and test pit logs, and recommendations on
slope setbacks, foundation design, retaining wall design, material selection, and all other
15
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
pertinent elements. If the evaluation involves geologic evaluations or interpretations, the
report shall be reviewed and approved by a geologist. Further recommendations, additions
or exceptions to the original report based on the plans, site conditions, or other supporting
data shall be signed and sealed by the geotechnical engineer. If the geotechnical engineer
who reviews the plans and specifications is not the same engineer who prepared the
geotechnical report, the new engineer shall, in a letter to the City accompanying the plans
and specifications, express his or her agreement or disagreement with the
recommendations in the geotechnical report and state that the plans and specifications
conform to his or her recommendations. If the site contains a geologic hazard regulated by
the critical areas regulations, the preparation and content requirements of RMC 4-8-120D,
Table 18 shall also apply. If the site is within a channel migration zone, within shoreline
jurisdiction, the geotechnical report shall also include a geomorphic assessment by a
Washington State licensed geologist with engineering geology or hydrogeology specialty
license plus experience in conducting fluvial geomorphic assessments.
24. Letter of Understanding Geologic Risk: The applicant, or the owner of the site, shall submit
a letter to the City, with the plans and specifications, stating that he or she understands and
accepts the risk of developing in an unstable area and that he or she will advise, in writing,
any prospective purchasers of the site, or any prospective purchasers of structures or
portions of structures on the site, of the unstable potential of the area. (Ord. 4835, 3-27-
2000
25. Utilities Plan, Generalized: A plan drawn on twenty two inch by thirty four inch (22" x 34")
plan sheets using a graphic scale of one inch equals twenty feet (1" = 20') (or other scale or
size approved by the Planning Division’s Development Engineering Manager or designee)
clearly showing all existing (to remain) and proposed public or private improvements to be
dedicated or sold to the public including, but not limited to: curbs, gutters, sidewalks,
median islands, street trees, fire hydrants, utility poles, refuse areas, signage, freestanding
lighting fixtures, utility junction boxes, public utility transformers, etc., along the full
property frontage. The finished floor elevations for each floor of proposed and existing (to
remain) structures shall be shown. (Amd. Ord. 4835, 3-27-2000)
26. Architectural Elevations: Please provide for each building and each building face (N, S, E, &
W) a 24” x 36” fully-dimensioned architectural elevation plan drawn at a scale of 1/4” = 1’
or 1/8” = 1’ (or other size or scale approved by the Planning Division). The plans must clearly
indicate the information required by the “Permits” section of the currently adopted
International Building Code (IBC) and RCW 19.27 (State Building Code Act, Statewide
amendments), including, but not limited to the following:
a. Identify building elevations by street name (when applicable) and orientation i.e.
Burnett Ave. (west) elevation;
b. Existing and proposed ground elevations;
c. Existing average grade level underneath proposed structure;
d. Height of existing and proposed structures showing finished roof top elevations based
upon site elevations for proposed structures and any existing/abutting structures;
e. Building materials and colors including roof, walls, any wireless communication facilities,
NA
16
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
and enclosures;
f. Fence or retaining wall materials, colors, and architectural design;
g. Architectural design of on-site lighting fixtures;
h. Screening detail showing heights, elevations, and building materials of proposed
screening and/or proposed landscaping for refuse/recycling areas; and
i. Cross section of roof showing location and height of roof-top equipment (include air
conditioners, compressors, etc.) and proposed screening.
27. Drainage Control Plan: Please provide a plan drawn to scale and stamped by a Washington
State licensed professional engineer and complying with the requirements of RMC 4-6-030
and the 2016 King County Surface Water Design Manual, as adopted and amended by the
City of Renton. (Amd. Ord. 4835, 3-27-2000; Ord. 5526, 2-1-2010)
28. Grading Plan: A twenty two inch by thirty four inch (22" x 34") plan drawn by a State of
Washington licensed civil engineer at a scale of one inch to forty feet (1" to 40') (horizontal
feet) and one inch to ten feet (1" to 10') (vertical feet) (or other size plan sheet or scale
approved by the Planning Division Development Engineering Manager or designer) clearly
indicating the following:
a. Graphic scale and north arrow;
b. Dimensions of all property lines, easements, and abutting streets;
c. Location and dimension of all on-site structures and the location of any structures
within fifteen feet (15') of the subject property or which may be affected by the
proposed work;
d. Accurate existing and proposed contour lines drawn at five foot (5'), or less, intervals
showing existing ground and details of terrain and area drainage to include surrounding
off-site contours within one hundred feet (100') of the site;
e. Location of natural drainage systems, including perennial and intermittent streams, the
presence of bordering vegetation, and floodplains;
f. Setback areas and any areas not to be disturbed, including the location, size and species
of all protected trees on site. Protected trees shall have the approximate drip line
shown. The method of tree protection during grading and construction shall be shown.
If grade changes in the vicinity of the protected trees are necessary, the method of
reconciling the drip line with the finished elevation shall be included (see RMC 4-4-130,
Tree Retention and Land Clearing Regulations);
g. Finished contours drawn at five foot (5') intervals as a result of grading;
h. Proposed drainage channels and related construction with associated underground
storm lines sized and connections shown; and
i. General notes addressing the following (may be listed on the cover sheet):
i. Area in square feet of the entire property.
ii. Area of work in square feet.
17
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
iii. Both the number of tons and cubic yards of soil to be added, removed, or
relocated.
iv. Type and location of fill origin, and destination of any soil to be removed from
site.
x. Finished floor elevation(s) of all structures, existing and proposed.
29. Photographs of the Property: Photographs may be submitted with the application as
exhibits.
30. Colored Rendering: A computer-generated exterior color view of the proposed building(s),
site, and landscaping in three (3) dimensional form.
31. Covenants, Existing: The recorded limitation on property which may be set forth in the
property deed and/or identified in a title report.
32. Easements, Existing: A recorded document by the property owner granting one or more
privileges to use the owner’s land to and/or for the use by the public, a corporation or
another person or entity. Easements may be referenced by property deed and are identified
in the property title report.
33. Hazardous Materials Management Statement: A statement which includes:
a. A description of refueling of construction vehicles that will occur on the site and an
inventory of hazardous materials expected to be temporarily stored, dispensed, used, or
handled on the site.
b. A description of how the requirements in RMC 4-4-030C7, Construction Activity
Standards – Zones 1 and 2, will be met by the applicant. (Ord. 4851, 8-7-2000; Amd. Ord.
4992, 12-9-2002)
34. Parking, Lot Coverage, Landscaping Analysis: A listing of the following information (may
also be included on the first sheet of the site plan):
a. Total square footage of the site;
b. Total square footage of existing area(s) of impervious surfacing;
c. Total square footage of existing natural/undeveloped area;
d. Square footage (by floor and overall total) of each individual building and/or use;
e. Total square footage of the footprints of all buildings;
f. Percentage of lot covered by buildings or structures;
18
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
g. Total pavement square footage, both existing pavement to remain plus new pavement
proposed to be installed;
h. Square footage of any on-site wetlands;
i. Parking analysis to include the total number of parking spaces required and provided,
number of compact and “ADA accessible” spaces provided, and parking space
dimensions;
j. Square footage of landscaping for each area, for interior parking lot landscaping, and
total;
k. Allowable and proposed building height;
l. Building setbacks required by Code; and
m. Proposed building setbacks. (Ord. 4587, 3-18-1996)
35. Topography Map: A map showing the existing land contours using vertical intervals of not
more than five feet (5'). For any existing buildings the map shall show the finished floor
elevations of each floor of the building.
All Plans and Attachments are subject to Electronic File Standards
REVIEW PROCESS: Once a complete land use application package has been accepted for initial review,
the Planning Division will post one notice of the pending application at or near the subject site and mail
notices to property owners within 300 feet of the project site. The proposal will be routed to other City
departments and other jurisdictions or agencies that may have an interest in the application. The
reviewers have two (2) weeks to return their comments to the Planning Division. Within approximately
two weeks, the Planning Division will prepare a report regarding the proposal’s compliance with
applicable codes and the City’s review criteria. The review process that follows varies depending on the
type of application request.
Administrative Variances: A public hearing is not required. The Planning Division reviews the
proposal and any staff or public comments prior to making a decision. The decision to approve,
conditionally approve, or deny the proposal will be provided to all persons listed on the Master
Application and all parties of record.
Hearing Examiner Variances: A public hearing is required. After review of the proposal and any
staff or public comments, the Planning Division staff will forward a report and recommendation
to the Hearing Examiner prior to the hearing. This report will be mailed to all persons listed on
the Master Application and all parties of record. Notice of the public hearing will be published in
the Renton Reporter at least 10 days prior to the hearing. Applicants are strongly encouraged to
attend the public hearing for their proposal. City staff will first make a presentation to the
19
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Variance.doc Rev:10/2019
Hearing Examiner about the proposal. Then the applicant and any citizens in support of the
proposal will give testimony. When giving testimony, names and addresses must be stated for
the record. Following this, individuals with neutral or opposing comments will give their
testimony to the Hearing Examiner. City staff or the applicant will address additional questions
raised throughout the hearing. The Hearing Examiner will review the proposed application and
issue a final decision within 14 days of the hearing unless, at the time of the public hearing, the
Hearing Examiner indicates additional time will be required for issuance of the decision. The
decision to approve, conditionally approve, or deny the proposal will be mailed to all persons
listed on the Master Application and all parties of record.
APPEAL AND RECONSIDERATION PROCESS FOR DECISIONS: Any person, including the applicant,
aggrieved by the granting or denial of an application, may make a written application for reconsideration
to the Reviewing Official within 14 calendar days of the date of the decision. After review of the request,
the Reviewing Official may take whatever action is deemed proper. The Reviewing Official’s written
decision on the reconsideration request will be mailed to all parties of record within 10 days from the
date the request was filed. If any party is still not satisfied after a reconsideration decision has been
issued, an appeal may be submitted within fourteen (14) days to the City Clerk’s Office.
An appeal may be filed without first requesting reconsideration by the Reviewing Official; however, it
must be filed within 14 days of the date when the original decision was issued. See RMC 4-8-110 for
further information on the appeal process and time frames.
BUILDING AND CONSTRUCTION PERMIT ISSUANCE AND INSTALLATION OF IMPROVEMENTS: In the
City of Renton, a Building Permit must be obtained to build buildings and structures. A Construction
Permit must be obtained to install utility lines, transportation improvements and undertake work in City
right-of-ways. Building and Construction Permits are separate permits.
Applicants may not apply for building and construction permits concurrently with their request for a
land use application.
If no appeals or reconsideration requests are filed within 14 days of the effective date of the decision to
approve the application, the applicant may obtain building and construction permits. A construction
permit for the installation of on-site and off-site utilities will be issued upon the review and approval of
civil engineering drawings by Development Engineering and receipt of all applicable development and
permit fees. A building permit will be issued upon the Building Section’s approval of building plans and
receipt of all applicable fees.
EXPIRATION AND EXTENSIONS: Once an application has been approved, the applicant has two (2) years
to comply with all conditions of approval, apply for any necessary permits, and/or commence
construction or otherwise implement effectively the variance granted before the approval becomes null
and void. The approval body that approved the original application may grant a single one (1) year
extension if the applicant requests an extension prior to the expiration, specifying the reasons for the
request. The approval body may require a public hearing for such extension.