Loading...
HomeMy WebLinkAboutERC_DNS_Determination_Applicant_Ltr_200625 June 30, 2020 Lyle Snaders L D Snaders Construction LLC 24920 SE 369th Pl Enumclaw, WA 98022 SUBJECT: ENVIRONMENTAL THRESHOLD (SEPA) DETERMINATION La Mexicana Change of Use, LUA20-000123, ECF Dear Mr. Sanders: This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they have completed their review of the subject project and have issued a threshold Determination of Non-Significance. Appeals of the environmental determination must be filed pursuant to RMC 4-9-070.R. Please refer to the enclosed ERC Report and Decision for more details. If you have any questions or desire clarification of the above, please call me at (425) 430-6598. For the Environmental Review Committee, Alex Morganroth Senior Planner Enclosure cc: Terreno 3401 Lind LLC/ Owner DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map ERC REPORT LUA20-000123 ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC MEETING DATE: June 29, 2020 Project File Number: PR20-000153, ECF Project Name: LaMexicana Change of Use Land Use File Number: LUA20-000123 Project Manager: Alex Morganroth, Senior Planner Owner: Terreno 3401 Lind LLC, 101 Montgomery St, Ste 200, San Francisco, CA 98104 Applicant/Contact: Lyle Sanders, 24920 SE 369th Pl, Enumclaw, WA 98022 Project Location: 3401 Lind Ave SW Project Summary: The applicant, L D Sanders Construction, is requesting Environmental (SEPA) Review to convert a 47,000 sq. ft. tenant space within an existing building at 3401 Lind Ave SW from warehouse/laboratory (light)/office space to manufacturing/office space. The building is approximately 118,176 sq. ft. in size and is located on a 5.14 acre site . The subject parcel (APN 1253810010) is located in the Industrial, Light (IL) zone and Employment Area Comprehensive Plan Land Use designation. The proposed tenant improvement would be located in a vacant tenant space on the north side of the building previously occupied by Baden Sports. The proposed new use would include the manufacturing of tortillas for LaMexicana, Inc, and corporate office space for Taco Time Northwest, Inc. All work would be interior and no trees or vegetation would be removed as part of the project. According to the applicant’s submittal, no new impervious surface would be added to the site as a result of the project. The site is located in a High Seismic Hazard Area. The applicant submitted a Traffic Memo with the application. Exist. Bldg. Area SF: 118,176 Proposed New Bldg. Area (footprint) Proposed New Bldg. Area (gross): N/A N/A Site Area: 224,316 SF (5.2 acres) Total Building Area GSF: 118,176 STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance (DNS). DocuSign Envelope ID: B389A6E7-4320-41DD-9EEF-306E2CEF4A76 City of Renton Department of Community & Economic Development Environmental Review Committee Report LAMEXICANA CHANGE OF USE LUA20-000123, ECF Report of June 29, 2020 Page 2 of 3 ERC REPORT LUA20-000123 PART ONE: ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS B. Mitigation Measures None C. Exhibits Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site Plan Exhibit 3: Plan Drawings Exhibit 4: Traffic Memo prepared by Jake Traffic Engineering (dated May 26, 2020) Exhibit 5: Email from Puget Sound Clean Air Agency (dated June 24, 2020) Exhibit 6: Department of Ecology Letter (dated June 12, 2020) Exhibit 7: Advisory Notes D. Environmental Impacts The proposal was circulated and reviewed by various city departments and divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1.Air Impacts: It is anticipated that air quality impacts could be associated with the proposed new use at the site due the expected use of ovens or other heating appliances in the production of tortillas and various food products. Staff contacted the Puget Sound Clean Air Agency (PSCAA) in order to determine whether the agency had any concerns with air quality impacts related to the proposed use. An email from Madeline Camp, an engineer at PSCAA, was received by staff on June 24, 2020 (Exhibit 5). In her correspondence, Ms. Camp stated that the proposed action may require a permit from PSCAA and asked the applicant to review the permit requirements on the agency’s website (www.pscleanair.gov) and contact the agency with any questions. Staff communicated Ms. Camp’s concerns with the applicant on June 24, 2020 regarding the potential need for a permit from PSCAA. The applicant has agreed to contact to the agency prior to operating. Therefore at this time, no site-specific mitigation is recommended for the potential impacts from the food processing facility. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable DocuSign Envelope ID: B389A6E7-4320-41DD-9EEF-306E2CEF4A76 City of Renton Department of Community & Economic Development Environmental Review Committee Report LAMEXICANA CHANGE OF USE LUA20-000123, ECF Report of June 29, 2020 Page 3 of 3 ERC REPORT LUA20-000123 2. Traffic Impacts: The applicant submitted a Traffic Memo prepared by Jake Traffic Engineers and dated May 26, 2020 (Exhibit 4). The memo utilizes data related to the existing warehouse use (provided by the tenant, Baden Sports), including both number of trips and total number of employees. The memo compares the data on the existing use to the number of trips and new employees that expected to be associated by the new use. Based on the data provided by the existing tenant and trip rates in the ITE manual calculated for the new use, the consultant concludes that the LaMexicana facility would generate slightly less traffic than the existing warehouse use including a lower number of total daily trips, AM peak hour trips, and PM peak hour trips. Staff has reviewed the data and methods utilized in the memo and concurs with the finding that the new use would not generate any new traffic impacts. Staff also concurs with the finding that the new use would actually decrease the total number of trips to and from the facility. Therefore at this time staff does not recommend any site-specific mitigation measures related to traffic impacts. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable 3. Environmental Health Impacts: Staff received a letter from the Department of Ecology (DOE) dated June 12, 2020 (Exhibit 6) regarding the proposed project. In the letter, the agency identifies the project site as being located in an area that may have been contaminated with heavy metals due to the air emissions originating from the old Asarco smelter in north Tacoma. The letter requests that the SEPA lead agency (City of Renton) include three mitigation measures as part of the threshold determination related to entry into the agency’s Voluntary Cleanup Program (VCP) under the Washington Model Toxics Control Act. Staff confirmed that the Tacoma Smelter Plume map indicates the potential presence of heavy metals on the site, as is similar to a large swath of Renton’s jurisdictional area. However, the proposed project is a change of use in an existing building and does not involve any demolition, new construction, or site grading that would result in soil disturbance or vegetation removal. Due to the project only involving a change of use within an existing, occupied building in good repair, staff does not recommend any site-specific mitigation measures related to environmental health impacts. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or listed under Exhibit 6 “Plan Review Comments to Applicant.”  Copies of all Review Comments are contained in the Official File and may be attached to this report. DocuSign Envelope ID: B389A6E7-4320-41DD-9EEF-306E2CEF4A76 ERC REPORT LUA20-000123 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: LaMexicana Change of Use Project Number: PR20-000153, ECF Date of Meeting June 29, 2020 Staff Contact Alex Morganroth Senior Planner Project Contact/Applicant Lyle Sanders, 24920 SE 369th Pl, Enumclaw, WA 98022 Project Location 3401 Lind Ave SW THE FOLLOWING EXHIBITS ARE INCLUDED WITH THE ERC REPORT: Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: Exhibit 6: Site Plan Plan Drawings Traffic Memo prepared by Jake Traffic Engineering (dated May 26, 2020) Email from Puget Sound Clean Air Agency (dated June 24, 2020) Department of Ecology Letter (dated June 12, 2020) DocuSign Envelope ID: B389A6E7-4320-41DD-9EEF-306E2CEF4A76 Exhibit 7: Advisory Notes DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Martin Pastucha, Administrator Public Works Administrator Date For Rick M. Marshall, Administrator Renton Regional Fire Authority Date Kelly Beymer, Administrator Community Services Department Date Cliff Long, Econ. Dev. Director Date CED Interim Administrator Interim Chair ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE (DNS) PROJECT NUMBER: PR20-000153/LUA20-000123, ECF APPLICANT: Lyle Sanders, 24920 SE 369th Pl, Enumclaw, WA 98022 PROJECT NAME: LaMexicana Change of Use PROJECT DESCRIPTION: The applicant, L D Sanders Construction, is requesting Environmental (SEPA) Review to convert a 47,000 sq. ft. tenant space within an existing building at 3401 Lind Ave SW from warehouse/laboratory (light)/offic e space to manufacturing/office space. The building is approximately 118,176 sq. ft. in size and is located on a 5.14 acre site. The subject parcel (APN 1253810010) is located in the Industrial, Light (IL) zone and Employment Area Comprehensive Plan Land Use designation. T he proposed tenant improvement would be located in a vacant tenant space on the north side of the building previously occupied by Baden Sports. The proposed new use would include the manufacturing of tortillas for LaMexicana, Inc, and corporate office spa ce for Taco Time Northwest, Inc. All work would be interior and no trees or vegetation would be removed as part of the project. According to the applicant’s submittal, no new impervious surface would be added to the site as a result of the project. The site is lo cated in a High Seismic Hazard Area. The applicant submitted a Traffic Memo with the application. PROJECT LOCATION: 3401 Lind Ave SW LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This Determination of Non-Significance is issued under WAC 197-11-340. When the DNS becomes appealable, the appeal period will be 14 days. DATE OF DECISION: June 30, 2020 DocuSign Envelope ID: B389A6E7-4320-41DD-9EEF-306E2CEF4A76 6/30/2020 | 2:31 PM PDT 6/30/2020 | 1:18 PM PDT 6/30/2020 | 12:33 PM PDT DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR20-000153 La Mexicana / LUA20-000123, ECF NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ______ TELEPHONE NO.: ___  I prefer to receive project information and documents in hard copy via US mail OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DNS) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: June 30, 2020 PROJECT NAME/NUMBER: PR20-000153 La Mexicana / LUA20-000123, ECF PROJECT LOCATION: 3401 Lind Ave SW (APN 1253810010) APPLICANT/PROJECT CONTACT PERSON: Lyle Sanders, L D Sanders Construction LLC / 24920 SE 369th Pl, Enumclaw, WA 98022 / ldsandersconstruction@yahoo.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/gyFUOHu PROJECT DESCRIPTION: The applicant, L D Sanders Construction, is requesting Environmental (SEPA) Review to convert a 47,000 sq. ft. tenant space within an existing building at 3401 Lind Ave SW from warehouse/laboratory (light)/office space to manufacturing/office space. The building is approximately 118,176 sq. ft. in size and is located on a 5.14 acre site. The subject parcel (APN 1253810010) is located in the Industrial, Light (IL) zone and Employment Area Comprehensive Plan Land Use designation. The proposed tenant improvement would be located in a vacant tenant space on the north side of the building previously occupied by Baden Sports. The proposed new use would include the manufacturing of tortillas for LaMexicana, Inc, and corporate office space for Taco Time Northwest, Inc. All work would be interior and no trees or vegetation would be removed as part of the project. According to the applicant’s submittal, no new impervious surface would be added to the site as a result of the project. The site is located in a High Seismic Hazard Area. The applicant submitted a Traffic Memo with the application. When the DNS becomes appealable, the appeal period will be 14 days. NOTICE