HomeMy WebLinkAboutInspector's Daily Reports - 7/29/2016 a
INSPECTOR'S ®AILS( REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
II IIIA I II I III II IIIIIII I II II
11111111111111111111111111$11111111111111 N 11111
Page 1 of 3
'03854 708-Inspector's Daily Reports 07/29/2016'
.•. Friday, July 29, 2016
Inspector: Todd Freih Inspector's Shift firs: 7:00am To
iNeather: Time Temp Sky Time Temp Sky
7:00am 66 Cloudy 4:00pm 88 Clear
1
Representative/Title_ ID p
ID Contractor"' �;. Contractor ;'`" Re resen4ative/Title
A Icon Materials Jeff Price/ Foreman F
B AGS Jessie Dillard/TCS G
C I
D --- — - J
E K
Work Activity
ID r,;;,.. DescTi "tion a LocatiEquip
on Crew ";
,
A Removing Cone. Multiple Loc. 11F, 2M JD 50D mini Exc, F450 U/T,
F250 P/U
B Traffic control All 2M, 1F 2PCMS, 2Arrow boards, F150
P/U
Traffic Control
Was Traffic Control Req'd Today? Yes — Was WZTC per approved TCP? Yes
Comments:
i/1all�lspection
Descri tion Est. Q_
On per ROMYaPL.
road 141,44 8-3-2016
In cto ' Signature Date
Revie, ed By(Signature) Date
�Citvof;y_ „/. INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite
In/Out o
rmaf
ime Material Descri tion LocationlOffset Confonce
None
� e
NO Discussion
7:OOam Finished documentation from 9/28/116
8:OOam AGS is preparing to place T/C
8:30am Icon is preparing to continue removals at NE 8th
9:OOam Work continues
2:30 m Icon has finished removals and are rernovi ig their equipment.
3:00 m Icon has finished for the day.AGS is removing T/C.
:00 m JAGS is finished for the day.
No Pictures for today.
Todd fi°ei/c 8/3/2016
Inspector's Signature Date
city(ir.,
iINSPECTOR'S DAILY REPORT
E\J
rt rb,
\ Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1 113(003)
Page 3 of 3
.......------
------------------
8/3/2016
Inspector's Signature Date