�s C� INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
IIII IIIIIIIIII II IIIIIII VIII II IIII VIII IIIIIIIIIIIIIII II II II IIIIIIIII IIIIIIIIIIIIIIIIIIIIII Page 1 of 3
*03854 708-Inspector's Daily Reports 07/28/2016*
�. • • ••. hursday, July 28, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 4:30pm
Weather: Time Temp Sky Time Temp Sky
7:00am 62 Clear 4:30pm 87 Clear
I®- ContractorRepresentative/Title ., ID Contractor Representative/Title;
A Icon Materials Jeff Price/Foreman F
B AGS Jessie Dillard/TCS G
C O'Bunko Clint Air/Foreman I
D J
Work Activity
ID Descri tion .,,.,Location;.. Crew
X.k.,E ui
A Removing concrete and NE8th St and both medians 3M F550 U/T, Water Tk., Bobcat
excavating for medians. skid steer loader JD 50D exc.
B T/C All 1F, 3M F150 P/U, 2 PCM,Arrow board
C Survey All 3M Chev P/U Van
Traffic Control
Was Traffic Control Req'd Today?
Yes Was WZTC pera roved TCP? No
Comments:Second PCMS has been delivered.
Material Delivery
Visuallnspection
Descri•tion Est. Q Unit per ROM&QPL?
7-28-2016
Inspector's Signature Date
—7• 7ff-1(a
'viewed By(Signature) Date
INSPECTOR'S DAILY REPORT
t�r +� Duvall Ave NE Pavement Preservation Project
TE
' `✓` '--t ` Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite
In/Out of
ime Material Descri tion Location/OfFset Conformance
None
311"IT Discussion
8:00am AGS is on-site and preparing the T/C.
Icon is preparing to continue excavations for the median at Sta.29+50-33+00. An additional PCM will be
8:30am delivered today. S/W and C/G removal is being performed on the NW corner of 8th St.
Icon has relocated the pavement grinder to the median at Sta. 18+00-21+00+/-to continue exc. Work continues
9:30am on the NW corner of 811
10:30am Icon is exc. to establish grade for the walks
Crews continue at both locations. AGS has delivered the second PCMS and placed it at NE4th &Duval in the
11:30am planter strip northbound. Crushed surfacing is being laced in the PAR on the NW corner of 8th.
12:00pm Icon has begun to remove S/W and C/G from the SW corner at 8th.
Icon continues to exc. the
1:00pm S. median and remove cont. on the SW corner of 8th
Icon has completed the removals on the SW corner of 8th. Work continues in the S median. O'Bunko is on-site
2:00pm to perform survey
Icon has finished activity in the roadway.AGS is securing the site. I had a visit from Pat Miller pertaining to traffic
control;he stated that we can only perform work on 1 corner at a time per intersection due to the need to maintain
2 lanes of traffic. We had been placing a flagger at the corner and performing work on both sides of the
3:00 m intersection.
3:30pm Icon has finished for the day. AGS is removing T/C
4:30pm AGS has finished for the day.
Tocicl f�ei/c 7-28-2016
Inspector's Signature Date
City o(,► INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 3 of 3
Subject:
Traffic Control
.'zJ•p '�'.3'
Location:
Sta. 29+00-33+00 +/-
Comment:
Traffic control is not to plan
:O-w0?��09(� 94f
Subject:
Medians
� rZ � •. ,
Location:
k Sta. 29+00-33+00
ERWComment:r 1 f LL I r x
k- Icon is using the planer to excavate in the
medians
Subject:
`p Concrete Removal
Location:
SE corner of 81h & Duvall
� :.
Comment:
Icon is removing the ped ramp.
yt t'(tt tom'W.. b1 P L
5&6,4 7-28-2016
Inspector's Signature Date