HomeMy WebLinkAboutInspector's Daily Reports - 7/28/2016 - A �s C� INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) IIII IIIIIIIIII II IIIIIII VIII II IIII VIII IIIIIIIIIIIIIII II II II IIIIIIIII IIIIIIIIIIIIIIIIIIIIII Page 1 of 3 *03854 708-Inspector's Daily Reports 07/28/2016* �. • • ••. hursday, July 28, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 4:30pm Weather: Time Temp Sky Time Temp Sky 7:00am 62 Clear 4:30pm 87 Clear I®- ContractorRepresentative/Title ., ID Contractor Representative/Title; A Icon Materials Jeff Price/Foreman F B AGS Jessie Dillard/TCS G C O'Bunko Clint Air/Foreman I D J Work Activity ID Descri tion .,,.,Location;.. Crew X.k.,E ui A Removing concrete and NE8th St and both medians 3M F550 U/T, Water Tk., Bobcat excavating for medians. skid steer loader JD 50D exc. B T/C All 1F, 3M F150 P/U, 2 PCM,Arrow board C Survey All 3M Chev P/U Van Traffic Control Was Traffic Control Req'd Today? Yes Was WZTC pera roved TCP? No Comments:Second PCMS has been delivered. Material Delivery Visuallnspection Descri•tion Est. Q Unit per ROM&QPL? 7-28-2016 Inspector's Signature Date —7• 7ff-1(a 'viewed By(Signature) Date INSPECTOR'S DAILY REPORT t�r +� Duvall Ave NE Pavement Preservation Project TE ' `✓` '--t ` Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite In/Out of ime Material Descri tion Location/OfFset Conformance None 311"IT Discussion 8:00am AGS is on-site and preparing the T/C. Icon is preparing to continue excavations for the median at Sta.29+50-33+00. An additional PCM will be 8:30am delivered today. S/W and C/G removal is being performed on the NW corner of 8th St. Icon has relocated the pavement grinder to the median at Sta. 18+00-21+00+/-to continue exc. Work continues 9:30am on the NW corner of 811 10:30am Icon is exc. to establish grade for the walks Crews continue at both locations. AGS has delivered the second PCMS and placed it at NE4th &Duval in the 11:30am planter strip northbound. Crushed surfacing is being laced in the PAR on the NW corner of 8th. 12:00pm Icon has begun to remove S/W and C/G from the SW corner at 8th. Icon continues to exc. the 1:00pm S. median and remove cont. on the SW corner of 8th Icon has completed the removals on the SW corner of 8th. Work continues in the S median. O'Bunko is on-site 2:00pm to perform survey Icon has finished activity in the roadway.AGS is securing the site. I had a visit from Pat Miller pertaining to traffic control;he stated that we can only perform work on 1 corner at a time per intersection due to the need to maintain 2 lanes of traffic. We had been placing a flagger at the corner and performing work on both sides of the 3:00 m intersection. 3:30pm Icon has finished for the day. AGS is removing T/C 4:30pm AGS has finished for the day. Tocicl f�ei/c 7-28-2016 Inspector's Signature Date City o(,► INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 3 of 3 Subject: Traffic Control .'zJ•p '�'.3' Location: Sta. 29+00-33+00 +/- Comment: Traffic control is not to plan :O-w0?��09(� 94f Subject: Medians � rZ � •. , Location: k Sta. 29+00-33+00 ERWComment:r 1 f LL I r x k- Icon is using the planer to excavate in the medians Subject: `p Concrete Removal Location: SE corner of 81h & Duvall � :. Comment: Icon is removing the ped ramp. yt t'(tt tom'W.. b1 P L 5&6,4 7-28-2016 Inspector's Signature Date