Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 7/27/2016 cit.��c,.; INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project IIII Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIVIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIullllllll__ Page 1 of 3 '03854 708-Inspector's Daily Reports 07/27/2016* ,•, ednesday, July 27, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:OOam To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:OOam 60 Clear 3:30pm 83 Clear o: ID Contractor Representative/Title ID', Contractor Representative/Title A Icon Materials Jeff Price/Foreman F S AGS Jessie Dillard/TCS G C I D J E K Work Activity ID Description Location Crew A Concrete and asphalt Median at Sta.29+00-33+00+/- 1F, 6M Water Trk 2F550 U/Ts, JD D50 removal and multiple corners mini exc. 3 Dump trucks, Wirtgen pavement grinder, sweeper B Traffic Control All 3M,1 F 1 Arrow Board, Ford F150 P/U Traffic Control Was Traffic Control Re 'd Today? Yes Was WZTC pera roved TCP? No Comments:Additional equipment and personnel on-site today. Material Delivery viswal Inspection Descri fiion Est.ORL Unit per ROM/QPL? Tdd Fi ei/c 7-27-2016 Inspector's Signature Date i 7. 7_7 i!o reviewed By(Signature) Date of` �� INSPECTOR'S DAILY REPORT �; Duvall Ave NP Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of �Mime �� Material Deseri tion Location/Offset Conformance None Diary ime Discussion 7:30am Crews are on-site preparing for the day. Crews have begun to set up for the day. I have reviewed the traffic control issue from yesterday with Gary from Icon and Jessie from AGS; we discussed set up and the need for more flaggers and T/C devices. AGS has an additional flagger and more equipment on site today. I have discussed maintaining the PAR with Gary and Ken; 8:30am it has been decided to allow the use of recycled concrete to stabilize the PAR. /C is in place for the work in the median and on the SW corner at 6th and removals are being performed. 9:30am Pavement removal has begun in the median at Sta. 33+00-29+00+/-. 10:30am Concrete removal on the SW corner at 611 has been completed.Asphalt removal continues. Concrete removal has been completed at the SW corner of 6th, Clearing and grubbing is being performed to 11:30am establish grade for the walks. Asphalt removal continues. 12:30pm Work Continues. Crews have struck an irrigation line during exc. For the walks on the SW corner of 6th Icon has finished prep work for the ramp and are getting crushed surfacing to stabilize the PAR. Pavement 1:30pm removal has been completed and Icon is exc. for the planter. 2:00pm Icon is on-site with the crushed surfacing for the PAR. Icon has finished exc.For the day and are removing equipment from the road.AGS is removing T/C. PAR appears 3:00pm to be solid and smooth. 4:00pm AGS has finished for the day. rdal6164a 7-27-2016 Inspector's Signature Date of, � INSPECTOR'S DAILY REPORT _M,<,-,4� ,�(`1 Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: F<< _ Concrete Removal Location: ` r } NE 6th St. SW corner Comment: a Icon is removing concrete J 1 1 . Subject: Clearing and grubbing �s Location: NE 6th St. SW corner. Comment: zwry Subject: Excavation -ti Location: N median Comment: Icon is using the pavement grinder to excavate the planter 56Y/54 7-27-2016 Inspector's Signature Date