HomeMy WebLinkAboutInspector's Daily Reports - 7/25/2016 C;ityo< ..i :; , INSPECTOR'S DAILY REPORT
—� §c Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIIIIIII�III�IIIIIIIIIIIIII�IIII��IIIII�I�IIII��I�IIIIII�IIIIIIIII�II�II�IIIII�I�I�III�I��IIII Page 1 of
`03854 708-Inspector's Daily Reports 07/25/2016'
�. • . ••. Monday, July 25, 2016
Inspector: Todd Freih inspector's Shift Hrs: 7:OOam TO 2:OOpm
Weather: Time Temp Sky Time Temp Sky
7:OOam 62 Clear 2:OOpm 84 Clear
ID" Contractor Representative/Title `" ID Contractor Re presentativWTitle
A, Icon Materials Jeff Prince/Foreman F
____ S Jessie Dillard/TCS G
C I
—.........---------...........-
D J
......._...
--- ........_.—
E K
Wark Activity
.; . �.
_ID Descri tion ` ry 'Location E Crew ,ui .
A Erosion Control Entire site 2 Employees 12 F550 U/T
B Traffic Control 2 Employees 1 Ford F150 PU, 1 Arrow
board
Traffic Control
Was Traffic Control Re 'd Today? Yes Was WZTC pera roved TCP? Yes
Comments:ATS followed Icon with arrow board during installation of inlet protection.
Visual las e- ion `
Descri tion Esq. Qt. UnNORIOit er ROMJLQP,,L
Inlet Protection 35 EA Yes, Pic.
Tadd//.Ai 7-25-2016
i_�
nspector's Signature Date
46 -T Z 5 • (!0
Reviewed By(Signature) Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
�lime Material D.escri tion Location/,Offset Conformance
None
ime Discussion
Met on-site with Icon and performed an employee interview. Took photo of inlet protection (Not found on
7:45am ROM).Ken stated that this was a temp item and I didn't need to track it.
8:30am Met on-site with AGM and performed an employee interview. Icon is preparing to place inlet protection on Duvall.
GS is providing T/C with arrow board. Pic Sta.
Icon continues to place inlet protection and stationing at Sta. 14+70L. Icon asked about the depth of the
excavation for the planters; I found in the planting details that there is to be a minimum of 2' of topsoil. The
10:00am excavation will need to be 18" min. with the 6"curbing to achieve the required depth.
Crews continue to perform layout for tomorrows work. I have spoken with Ken about the proposed crossing at 9th
or the new short plat. I will try to coordinate the work in an effort to have it performed before our work is finished.
11:30am 11 have also spoken with him about KCTs request to take core samples for gauge correlation.
GS has finished for the day. Icon continues to perform layout for the ped ramps. The joints on the curb don'
12:00 m match the existing and will need to be adjusted to meet COR specs.
Icon continues to perform layout for the ped ramps at the corner of 9th & Duvall. I have spoken with Ken abou
1:30pm removals and he stated that we will take them to the next joint.
2:00pm Icon is finished for the day.
rod,f/°4 7-25-2016
Inspector's Signature Date
yp.
9
der` „✓, ,.�i Syr
..€..�7• - µEr yx s1 ',z'
_ I P
)moi = - � t�F�} _' I � ,� �'1` • -
'°°�
07/251z�3•
'r[,�•�L y �l �,�''� �'�.3 +. t yt�' '�� `3��'�:tt.'r,,r at--r tic`Pi `�' �i {
r.:i•�'WI�6�` "i a "�h �t{, TAT y 4•i`µ' ..x gt L'` 1/`>a,+ i, .,.sj Subject: • •
,.�(p Y" 1J" J•1; A '�"��z'rt, ! JJ ,rT �+`�.��t_ s�C.�,t,'r!�byy..y,
TZ
2y�'>•�,ti4{y'.y-x t�a, '`�.,' J.` •ta. ti�zua#"."^5'�er',�."'ii
�yf�,� 'ar vti�r,.•^s7tM1.•. < Le '" =5"t�+ .•3y ,( •+i`„ .* h
Z;'� `' ,yam Lava; is ♦� r .` yY'}M 7'M A'�K.'' i .,n� • •
MA Jk�
Duvall Ave NE
Icon placing locates for the center islands
251�0,16�-