HomeMy WebLinkAboutInspector's Daily Reports - 8/23/2016 INSPECTOR'S DAILY REPORT
® � } -On
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 1 of 3
II IIII I III IIII IIIIII I II IIIIIIII I I IIII III IIIIII II
03854 708-Inspector's Daily Reports 08/23/2016" ••• uesday August 23, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 4:OOpm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Cloudy 3:30pm 79 Clear
L-
MCA
kt+3Y
ID' :Cr ;= ;1D
ontractoRepreseatativelTitle ";'Contractor - ReprisentatvelTitlen,
A Icon Materials Bill Johnson/Foreman F
-------..._...........—.........................---._...................----..........-_............................ __..._...--..._..._....._..............................._......... _..._..........................................................................................................._._.........................................................._----.._..................................----.................
B AGS Jessie Dillard/TCS G
_._.......__......_...--------......__............__........__...._.._.............---...__._._... --....-----._..............................----_._._ ......_.................-- --._...------ ------- ---...... _-........
C Green City Paul Falaniko/Foreman I
.........................._..............-..............---._.._...............--......._.._.....__...--....................................................._...............------........................... —........
..... .
......................................_............................................................................................................................................................................._...—
D Caliber Concrete Mathew Carmack/Foreman J
.............-......................_........................__.................----.....................................__..._.........................-...._.__._....................._...-------
......................................._._....__.........................._...._................_.._...__............._.....................................-----.._.-.....................................................
E K
Work Activity
ID Descri tion Location Crew quip
A Preparing for asphalt Mult Loc. 3M,1 F JD 310 backhoe, F250 P/U,
F450 &550 U/T, Bobcat
skidsteer loader
B Traffic control All 2F, 1M 2PCMS, 2Arrow boards, F150
P/U
C Installing Irrigation Sta. 18-22+00+/- 4M 2 F150 P/U, JD Mini Exc. F450
U/r
Traffic Controf
Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP?
Comments:
Delivery
0nspection
D.escri�tion =S$. Qt�. ni per ROM/QPL?
Concrete Class 4000 12.5 YD Yes
Tcic(flIed 8-23-2016
Fr's Signature Date
ik4 (16
R viewed By(Signature) Date
® Ci (IfINSPECTOR'S DAILY REPORT
s
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
'Onsite •
In/Out
�time Mof
aternal De cr'r tion Locatio p�0,ffset Conformance
None
Diary
ime Dis useio
Green City continues to place irrigation in the median at Sta. 18-22+00+/-. Icon is preparing to move the
7:00am irrigation pipe at 7th. AGS is preparing to place T/C. _
Mark Cashman from WESGFtO is scheduled to be on-site to deactivate the 2"irrigation line to allow modifications
8:00am o be made. Icon is preparing the subgrade at 8th for paving. _
_........_......_...__....._..__.....-_--------............................_........_._.._...._............_.................._..
I have spoken with Jeff from Caliber about testing requirements for compaction and mix on the sidewalks; I
informed him that I need 24 Hrs notice to have KC out to the site. They intend to place conc for the walks at gin
oday; I stated that I will allow them to perform the work this time but future work will have to be scheduled in
8:30am a...............................-----............................._—.............._._.._._............_..............................................._.......--........................_........................._......._______...-..................................-----...__._.._........._................._..__......_....................................................................................._...
G/C continues in the median; I have verified the sprinkler heads and root barrier, Icon is preparing the area on
9_:0_0am the W side at 7th
..................................._..........._.._..............................._-..._..._..------...
_........._........_...... -------__..--......_._..-----------._..._..._....._....................................................................................—....._...._.._................................_...
Caliber is placing forms at the W side if 7th. 1 have informed Jesus with G/C that his office has to call in to the
shops and provide their permit number in order to have the meters installed for the irrigation system. ( F/AJesus
stated that he worked for 2 '/z hours in the Irrigation yesterday 8/22/16) Miles is on-site with the conc. for the
10:00am curbs at Sta. 22+6013+/-.
Caliber has relocated to the ramp on the W side of Duvall at 7th. GC continues. Icon_ is preparing the subgrade
or asphalt on the SW corner of 8th. I have informed Maser with KC Testing that Wed. and Thurs of next week we
10:30am will bepaving at night.
11:00am Off-site for CED Meeting........—._..............................................................
12:30pm Caliber is placing concrete for the ped ramps at 9th_ Icon ispre�nq base for asphalt at
_._.._.._.._..---.... ---.-._..........................
I have discussed the roots on the tree adjacent to the parallel ramp at 7th and have asked Flora if it would be
possible to narrow the walk and raise the oed curb to protect the roots. Ken responded and stated that we could
1:30pm_ place the back of the curb where the face is currentsIp annedL.___..._._._................__...___.__.__........................._...........__......_.._.. .................................................. .__....................
I have spoken to Bill about restoring the irrigation system at the ramp as soon as possible. Icon continues to
2•.30pm__ prepare for asphalt at the SW corner of 61n
Green City is relocating to the median at Sta. 29+50-33+00 +/- to off load materials. (F/A Jesus is performing
3:00pm restorations to the irrigation adjacent to the.ped ramp at the W side of 7th_.} —__:......
_._._ -------...........__..._..................... ......
Green City has finished for the day. Jesus stated that he will have to finish repairs to the irrigation tomorrow as
3.30pm he doesn't_have the needed parts with him today. AGS is placing T/C fo.r the night and is finished for the day.—
Todd F /c 8/23/2016
Inspector's Signature Date
�c:itYc,f� INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
Subject:
�y of _ryalip
' a1 i;„ Ped Ramps
3 y 1
I�
1!
Location:
ion
NE
ii
.. .iJ✓" '."� r `�,aryybtF 1? 7t
...................... ..... _ .... .....
_
f /
i
h
Comment:
Caliber is placing forms for the ped
ramp.
KU�idWJMM64J¢�E4➢k
ti
Subject:
Irrigation
}
Location:
Sta. 18-22+00 +/-
-= - Comment:
- _ Green City is installing irrigation in the
median.
Subject:
y Ped Ramp
w
� r
b�
I!iS +nai Location:
_ Sta. 22+60R +/-
------.._........._...---.-_...
p y Comment:
F ` 1 Caliber is placing concrete for the ped
ramp on the SE corner of 6th
Tc(cl f�ei� 8/23/2016
Inspector's Signature Date