HomeMy WebLinkAboutInspector's Daily Reports - 8/22/2016 ;r1 :a;. INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
-- Page i of 3
IIIIIII�IIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII
- • • '03854 708-Inspector's Daily Reports 08/22/2016" • - Monday August 22, 2016
Inspector: Todd Freih - - _ Inspector's Shift firs: 7:00am To 5:OOpm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Clear S:OOpm 75 Clear
• • iC
w—
ID. Colntractor ReRresentatwePTitle ID Contractor. _ RepiresentativelTjtle '
A Icon Materials Bill Johnson/Foreman F
B AGS Jessie Dillard/TCS G
C Green City Paul Falaniko/Foreman i
E- K
�VVork Activity
ID_� ._, ;DescriL-,ion.m Location - r_ .: ' _� 1-_ - Crevu-..r_
A Providing support for Mult Loc 3M, 1 F JD 310 backhoe, F250 P/U,
Caliber F450 &550 U/T, Bobcat
skidsteer loader
B Traffic control All 3F, 1M 2PCMS, 2Arrow boards-7150-
P/U
C Installing Irrigation Sta. 18-22+00+/- 2M- - F150 P/U, JD Mini Exc -
Trafflo Oontrol
Was Traffic Control..R6 'd TodaSq Yes Was-WZTC.-er;a roved.TCP? Yes
Comments:
Material Delivery
su sped on
acr,.i :t"ron Esrt. Uni pertRONI[�QPI.?
Concrete Class 4000 4 YD Y
59,611544 8-22-2016
Inspector's Signature — Date --
Revi weTy(Signature) - — -- Date..-
INSPECTOWS DAILY REPORT
..��� ..J_� ... Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Ontite Testing
Ie ut f
�iirne Material De:'sc' .tion LO�fi91U0_set �gnfor�.n._.r�e
None
ti. Dis_1 D_u00 .
7:00am Icon and AGS are on-site "re grin
Icon is placing crushed surfacing preparing subgrade at 9th for the,S/W:Caliber is placing forms at-7th.Green Cit
8:00am is on-site to pIA66 irri-ation in the median.at Sta. 18-21+00+/-._
Caliber is placing forms at 9th, Icon is removing the asphalt along the curb on the SE corner of 6th to allow'Caliber
to place forms for C/G and the ped. curb. Green City verified that the placement of the sprinkler heads was to be
Along the edge of the excavation in the median; I called Ken and he stated that this is correct.The heads will be
9:00am_ 10-14"from the BOC.
Icon continues at 6th, Green City continues in the median and-Icon is preparing-to place concrete at 7th. AGS is
10:00amr-oP ,viding T/C for all work. _
Miles is on-site with cone. for the SE corner of NE 71h. Icon is removing the walk on the W side at 7th and have
11:00am completed preparing the.SE corner at 6th
Caliber has finished placing concrete on the SE corn-erof 7tn and part of the crew has"relocated to the SE come
of 6th to begin framing. Icon continues to remove SMI on the E side at 71h;Icon has encountered a conflict with
the'irrigation system during exc. and the pipes will have to be moved to allow the installation of the ped curb. I
have agreed to have Green City cut and cap the system until the curbing;has been install and then restore it as
12:00pm _as•-done in_previous--locations. GC continues to instal irri atiori in the median at Sta. 18-21+00+/-
1 have directed Caliber to raise the ped curb on the SE corner of 6th to maintain the-landscaping as much as
possible,the west end of the curb will taper down to the elevation of the walk over the length of 1'.G/C continues
1:00pm to place irrigation in the median.
The 2"irrigation-line at7th-h-as water in it;the contractor made a small cut in it and I called Greg Sigmiller to come
out. He placed has sleeve on it and stated that it might not hold if the line was activated. G/C cut the 1" and
rerno_,ved a section and didn't cap the ends. I called Bill and informed him and he stated that he would have Shane
:30pm cap,it.
4:00 I am waiting for Shane or the Homeowners Assoc.to get back to me about-the sy_stem._
I have spoken to Christine about the problem and she stated that she would also call the landscapers and try to
4:30pm get_the 2"shut off. I have called their office and left a message.
I have checked the valve for the 1" line and found it was turned off. I am going to have to consider it secured:!
have spoken to Mark with WESGRO about the system; he stated that he will be on-site tomorrow to ensure the
5:00pm__niain.is,off to allow us to perfoml the work needed at 7th.
TaW 6,edC 8/22/2016
Inspector's Signature" - - Date- -
r) INSPECTOR'S DAILY REPORT
r; ,' 'f`_l,l' t I Duvall Ave NE Pavement Preservation Project
.�_._
Contract#CAG-16-004, Fed AidNo: STPUL-1113(003)
Page 3 of 3
Subject:
Sidewalks
' Location: - ---- - --- - -- ----
t.
-- ; Sta. 22+60R+/
'3 Comment:
Icon is preparing the subgrade for the
walks
� F
-- Subject:
-
Curb and Gutter
°d i Location:
NE 71'' & Duvall
- Comment:
Caliber is placing forms for the C/G
x
q, _ _ ' r
nG 11
Subject:
Irrigation
r
---- Location:
Sta. 18+01-22+00
C- �
s Comment:
Green City is installing the irrigation in
the median
-,TlLIE-Ira& 8/22/2016