Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/22/2016 ;r1 :a;. INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) -- Page i of 3 IIIIIII�IIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII - • • '03854 708-Inspector's Daily Reports 08/22/2016" • - Monday August 22, 2016 Inspector: Todd Freih - - _ Inspector's Shift firs: 7:00am To 5:OOpm Weather: Time Temp Sky Time Temp Sky 7:OOam 60 Clear S:OOpm 75 Clear • • iC w— ID. Colntractor ReRresentatwePTitle ID Contractor. _ RepiresentativelTjtle ' A Icon Materials Bill Johnson/Foreman F B AGS Jessie Dillard/TCS G C Green City Paul Falaniko/Foreman i E- K �VVork Activity ID_� ._, ;DescriL-,ion.m Location - r_ .: ' _� 1-_ - Crevu-..r_ A Providing support for Mult Loc 3M, 1 F JD 310 backhoe, F250 P/U, Caliber F450 &550 U/T, Bobcat skidsteer loader B Traffic control All 3F, 1M 2PCMS, 2Arrow boards-7150- P/U C Installing Irrigation Sta. 18-22+00+/- 2M- - F150 P/U, JD Mini Exc - Trafflo Oontrol Was Traffic Control..R6 'd TodaSq Yes Was-WZTC.-er;a roved.TCP? Yes Comments: Material Delivery su sped on acr,.i :t"ron Esrt. Uni pertRONI[�QPI.? Concrete Class 4000 4 YD Y 59,611544 8-22-2016 Inspector's Signature — Date -- Revi weTy(Signature) - — -- Date..- INSPECTOWS DAILY REPORT ..��� ..J_� ... Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Ontite Testing Ie ut f �iirne Material De:'sc' .tion LO�fi91U0_set �gnfor�.n._.r�e None ti. Dis_1 D_u00 . 7:00am Icon and AGS are on-site "re grin Icon is placing crushed surfacing preparing subgrade at 9th for the,S/W:Caliber is placing forms at-7th.Green Cit 8:00am is on-site to pIA66 irri-ation in the median.at Sta. 18-21+00+/-._ Caliber is placing forms at 9th, Icon is removing the asphalt along the curb on the SE corner of 6th to allow'Caliber to place forms for C/G and the ped. curb. Green City verified that the placement of the sprinkler heads was to be Along the edge of the excavation in the median; I called Ken and he stated that this is correct.The heads will be 9:00am_ 10-14"from the BOC. Icon continues at 6th, Green City continues in the median and-Icon is preparing-to place concrete at 7th. AGS is 10:00amr-oP ,viding T/C for all work. _ Miles is on-site with cone. for the SE corner of NE 71h. Icon is removing the walk on the W side at 7th and have 11:00am completed preparing the.SE corner at 6th Caliber has finished placing concrete on the SE corn-erof 7tn and part of the crew has"relocated to the SE come of 6th to begin framing. Icon continues to remove SMI on the E side at 71h;Icon has encountered a conflict with the'irrigation system during exc. and the pipes will have to be moved to allow the installation of the ped curb. I have agreed to have Green City cut and cap the system until the curbing;has been install and then restore it as 12:00pm _as•-done in_previous--locations. GC continues to instal irri atiori in the median at Sta. 18-21+00+/- 1 have directed Caliber to raise the ped curb on the SE corner of 6th to maintain the-landscaping as much as possible,the west end of the curb will taper down to the elevation of the walk over the length of 1'.G/C continues 1:00pm to place irrigation in the median. The 2"irrigation-line at7th-h-as water in it;the contractor made a small cut in it and I called Greg Sigmiller to come out. He placed has sleeve on it and stated that it might not hold if the line was activated. G/C cut the 1" and rerno_,ved a section and didn't cap the ends. I called Bill and informed him and he stated that he would have Shane :30pm cap,it. 4:00 I am waiting for Shane or the Homeowners Assoc.to get back to me about-the sy_stem._ I have spoken to Christine about the problem and she stated that she would also call the landscapers and try to 4:30pm get_the 2"shut off. I have called their office and left a message. I have checked the valve for the 1" line and found it was turned off. I am going to have to consider it secured:! have spoken to Mark with WESGRO about the system; he stated that he will be on-site tomorrow to ensure the 5:00pm__niain.is,off to allow us to perfoml the work needed at 7th. TaW 6,edC 8/22/2016 Inspector's Signature" - - Date- - r) INSPECTOR'S DAILY REPORT r; ,' 'f`_l,l' t I Duvall Ave NE Pavement Preservation Project .�_._ Contract#CAG-16-004, Fed AidNo: STPUL-1113(003) Page 3 of 3 Subject: Sidewalks ' Location: - ---- - --- - -- ---- t. -- ; Sta. 22+60R+/ '3 Comment: Icon is preparing the subgrade for the walks � F -- Subject: - Curb and Gutter °d i Location: NE 71'' & Duvall - Comment: Caliber is placing forms for the C/G x q, _ _ ' r nG 11 Subject: Irrigation r ---- Location: Sta. 18+01-22+00 C- � s Comment: Green City is installing the irrigation in the median -,TlLIE-Ira& 8/22/2016 ---Inspectors Signature - Date