HomeMy WebLinkAboutInspector's Daily Reports - 8/17/2016 r
Cit%-of INSPECTOR'S DAILY REPORT
5) e
Q � 4X-;W; Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 1 of 3
Illlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll III
• • • *03854 708-Inspector's Daily Reports 08/17/2016* ••, ednesday August 17, 2016
Inspector: Todd Freih Inspector's Shift firs: 7:OOam To 3:30pm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Cloudy 3:30pm 81 Clear
• • iC
I®' ,..; Contractor; , R pr`esentativelTitle. t ID Contractor;,. Representative/Title
A Icon Materials Bill Johnson/Foreman F
---...._...........-----._........................................................................._...---....................-. __._.................................................._........_..__....---._........ - __--------...- ----._._..._...................
B AGS Jessie Dillard/TCS G
------......-_._.__.._.---—_.................. —._.-------_.---------_....................... --._._..__..._..._......._.. _......_...... .........-- ---._.... ..—- ----- -_ -------
C Caliber Conc. I
_..._......._—..........__._................-._................_-._.................. _—..............................................................._........-----...................._._ .._.............._. .— . ---
. _...-.--- -----.._....._...... ---—._.__._.._...._.._.. ...-------..-.
D J
---._.............__._............._.—._..................__._..._...............---....__............._.._-...................................._........__..._............._..----..__._.......-........__.. .................._..._...----------...------............................_......_.....................__................................................................_......._—_...
E K.....
Work Activity
Oestri tion` K .. ..
Location Crew' E ui `
A Assisting Caliber Mult. 3M F250 PU
B Traffic control All 3F, 3M 2PCMS, 2Arrow boards, F150
P/U
C Placing forms for ped Multiple, from NE 9th South 3M 1 F450 U/T, 1 F350 U/T
ramps
Traffic Control
Was Traffic Control Re 'd Toda ? Yes Was WZTC per approved TCP?--._.._...................... --...................._—.....9 . . . ._Y —_...._........._..._._ ..............................—._....._.._..._.._.__._........---.._. . ---..._... -
Comments:
Delivery
inspeeti n
1?escri:�tion Est. r� nit per ROtvij�gFt?
Tdd fwei/� 8-17-2016
'r ispector's Signature Date
___a J�- 9?' 1? - to
R vie By (Signature) Date
e�•
c:wof, INSPECTOR'S DAILY REPORT
r _D � Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite •
In/Out of
i lime Material Descri�tion Locat�ion/Offsefi Conformance
None
ime Discwssion
7:OOam Finished paperwork from 8/16/16.
8:OOam GS is placing signage for T/C
- -..._..-- .._._. ...............................................-_........................._.........._....--- -._....._.........................................................................................................--..-._........_...._....._.................._......
----...._.._.... ---...
8:30am Totem is on-site waiting for T/C to be placed at_the SE corner of NE 6th St_
......._............_.—_._..._ ........... ............
Totem is performing work to relocate the j-box at 61h, (2M, Kubota mini, Dodge 2500 U/T, Chev 2500 U/T W/Trlr)
NW is on-site to continue placing ext. curb at Sta. 29+50-33+00, Caliber is on-site to begin placing forms for
9:OOam _ C/G at NE 9th St. _ __ _ __ _ _ _
I received a call from Bob Hanson about equipment on private property at NE 6th; I found Totem excavating to
access the existing conduit for the street lighting. Totem had gone approx. 1' onto the private property. I
contacted Bob and he stated that we had an easement and we could proceed.There is a large amount of water
10:00am in the curb line at this location. NW and Caliber continue.
__...._...._.....—.__......—........_..........—._._......_.......— ....._....__........ _ -........................ –._........................................_...._..........---- --.._._.. _..._.......__--._................._...........................-..........-..------- -
he conduit for the street lighting at 6th is approx. 5.5' deep and Totem is unable to make a connection at the
chosen location; we have decided to move it a smaller amount from the existing location but still enough to
remove it from the ramp. NW continues to place curb along the southbound side of the median. Caliber
11:00am continues on the SE corner of 9th
12:OOpm _NW continues, Totem continues at the SE corner of 6th, Caliber continues at the SE corner of Stn
Totem has finished work on the j-box at 6th. NW has finished placing the ext. Caliber has relocated to the S
1_OOpm _corner of NE 8th St. to continue placing forms for C/G_
2:30pm _ Work continues at the SW corner of 8th, AGS is providing T/C for the work
3:OOpm Caliber is finished for the day-
3:30pm_ .ork is fi.nished_for the day._
Todd f�ei/c 8/17/2016
Inspector's Signature Date
Subject:
F/A
J-Box relocation
W ki
Totem is excavating to locate existing
Extruded Curb
• •
11
LJ
NW Traffic is placing the remaining
4:u••_".�,«�"�'"rg*'a"`. ��^' _`l w ;. '�`��;�d,'-' �'11 rS( ��'1ltr�J��� y�
} ! Subject:
Concrete • and Gutter
J ;
1
•
4.�
Caliber placing • for •
• gutter.