Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/16/2016 Gwof INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) - II Page 1 of 3 II IIII I II� IIIIIIIIIII I IIIIIIIIIIIIIII I IIIIIIIIIIIIIII IIIIIIIIIIIIII 03854 708-Inspector's Daily Reports 08/16/2016 ••, uesday, August 16, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:00amT0 4:30 Weather: Time Temp Sky Time Temp Sky 7:OOam 60 Cloudy 4:30 82 Clear ID Cbnfradtor, . Rep es ID' Contractor Representativelfitle A Icon Materials Bill Johnson/Foreman F ....................__......._....._..........-----...............-----.._............._..---...-......................._.—_....__...............................----.......... .................... .---- _ _ -- _..._....__................_............._............._........_...._....._.--..._....__........................._._ B AGS Jessie Dillard/TCS G ..................._._._..._......._......—..........---..................--....._.................------._............................._.....__._.._...._.._.......... .-- -..._..........................__..........--...........-----...__-----------------------._...------- --.... _. C I _ _...................----_._.................-- J--.................._..__...........................—__................................................._.._..__..._......................... __- . . . ................ ......_....---..__......._..._..........._..........._......._._._—..-__.............. D ....................-_............._..---.._.............._._.__................_._-..........................._._..................................................---........................_..._....... _.._..._._................_.......................................................................... -- E K -- ..__............................................................ ........... ........ —_..__...._... Work Activity ID Descr tion`" Location j Crew- `t E A Supervising contractor, All Ford F250 PU performing layout. B Traffic control All 2F, 1M 2PCMS, 2Arrow boards, F150 P/U Control Was Traffic Control Reg'd Today? Yes _ Was WZTC_per approved TCP? Yes Comments: IMaterial ri- U'swal I�specti�� Descri�tion E-st. Qt. Unit per ROM/�QPL? Tdd f1-1ra 8-16-2016 s ecto 's Signature Date R iewe y (Signature) Date -� Citvor e. INSPECTOR'S DAILY REPORT - � Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of t time Material Des¢ri�fiia�,n LocafiioNOifset Conformance None Diary ime Discussion KC Testing is on-site taking core samples for gauge correlation. Icon is placing staking at the corner of Duvall 700am and NE 9th to establish_gra0e. ......._.. 8:00am GS is placing T/C for NW Traffic at Sta. 18-22. - .—......................._._—._......_....._.........._..._....................—_.._._... ___.._......_............................................................................................................__......_.. - 8:30am NW Traffic is re arin to lace extruded curb, T/C has been laced. --..._._..._.. _..................—............._......P....._P_...............9._.__.....P.............................-----.._..._.................__..__..............................._.........................P—.._..........................._...._........................................................................................................................................._..__..._..._..._...._ NW continues to place extruded curb, the mold they are using today is working properly and they are making 9_00am goo�rogress. KC has finished takingcore samples. 10:00am Off-site for meeting. _ 10:30am 11:30am --..._..._._...............---._.... ............---..................... _............... .—.. ....... ...__............................................................------........................................._...........-.—_.............._.............................................................................................._... NW Traffic continues to place extruded curb at Sta. 18-22+01 +/-. Icon is preparing the subgrade at 9th to correct 12:OOpm a grading issue and prepare fo.r concrete work. .............. .._._—............._......- -.. ......... ........ ......... ........ ......._........_... ---- NW has finished with the median at Sta. 18-22+01 and are relocating to the small island at Sta. 14+58-14+71. GS is placing T/C for the median at Sta. 29+50-33+00. Bob Hanson was on-site to inspect the curb placed yesterday, 8/15/16; he stated that he will allow Icon to make a decision on whether or not the work is accepted. I 1:OOpm have relayed this information to Bill. ——..............--- -.......... ......... --- ---........._........_......................-----.-...-...-.............. I have spoken with AGS about T/C for the newly placed curb; I asked Jessie to place candle sticks around the medians until curing is complete and the paint has been applied. NW has finished the small median at Sta. 14+58- 14+71 and have relocated to the median at Sta. 22+51-33+00. Bill from Icon stated that there was a conflict with he retaining wall at NE 7th ST. and the proposed storm pipe at the SE corner. I directed him to draw up the ?L.00pm_ changes needed and to submit them to Ken for approval. ---._ .......------.._..._.._.-..._-- -. .. .................._............._...........__.._......__...._........-----....._.._._............ NW continues at Sta. 25+00 +/-, they will finish the material that they have and will be done for the day. AGS is 3:00pm waiting to place T/C for the ._OOpm Work has finished for thedaar Tcld�i°ei/c 8/16/2016 Inspector's Signature Date Cityof - INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3of3 Subject: �a Y Asphalt testing __............---..............................._......._ _..............................------....._ '^ Location: Sta. 48+50, 64R +/- Is n Comment. King County Testing is taking core zie samples for gauge correlation. 3�� Subject: s Extruded Curb .� Location: Sta. 18+01-22-00 - Comment: YY ,�yyx NW Traffic is placingextruded curb for the median. Subject: Extruded Curb ......._.._...................................._........__..__.__. _...._.._............................................................ ti Location: Sta. 18+01-22+00 +/- Comment: NW Traffic is placing the dowels into F 3 `I ti4 the curbing. Z F ,.k•a "+."^+. see Tdd f�ei/c 8/16/2016 Inspector's Signature Date