HomeMy WebLinkAboutInspector's Daily Reports - 8/16/2016 Gwof INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
- II Page 1 of 3
II IIII I II� IIIIIIIIIII I IIIIIIIIIIIIIII I IIIIIIIIIIIIIII IIIIIIIIIIIIII
03854 708-Inspector's Daily Reports 08/16/2016 ••, uesday, August 16, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00amT0
4:30
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Cloudy 4:30 82 Clear
ID Cbnfradtor, . Rep es ID' Contractor Representativelfitle
A Icon Materials Bill Johnson/Foreman F
....................__......._....._..........-----...............-----.._............._..---...-......................._.—_....__...............................----.......... .................... .---- _ _ -- _..._....__................_............._............._........_...._....._.--..._....__........................._._
B AGS Jessie Dillard/TCS G
..................._._._..._......._......—..........---..................--....._.................------._............................._.....__._.._...._.._.......... .-- -..._..........................__..........--...........-----...__-----------------------._...------- --.... _.
C I
_ _...................----_._.................-- J--.................._..__...........................—__................................................._.._..__..._......................... __- . . . ................
......_....---..__......._..._..........._..........._......._._._—..-__..............
D
....................-_............._..---.._.............._._.__................_._-..........................._._..................................................---........................_..._....... _.._..._._................_.......................................................................... --
E K -- ..__............................................................
...........
........
—_..__...._...
Work Activity
ID Descr tion`" Location j Crew- `t E
A Supervising contractor, All Ford F250 PU
performing layout.
B Traffic control All 2F, 1M 2PCMS, 2Arrow boards, F150
P/U
Control
Was Traffic Control Reg'd Today? Yes _ Was WZTC_per approved TCP? Yes
Comments:
IMaterial ri-
U'swal I�specti��
Descri�tion E-st. Qt. Unit per ROM/�QPL?
Tdd f1-1ra 8-16-2016
s ecto 's Signature Date
R iewe y (Signature) Date
-� Citvor e. INSPECTOR'S DAILY REPORT
- � Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
t time Material Des¢ri�fiia�,n LocafiioNOifset Conformance
None
Diary
ime Discussion
KC Testing is on-site taking core samples for gauge correlation. Icon is placing staking at the corner of Duvall
700am and NE 9th to establish_gra0e. ......._..
8:00am GS is placing T/C for NW Traffic at Sta. 18-22.
- .—......................._._—._......_....._.........._..._....................—_.._._... ___.._......_............................................................................................................__......_.. -
8:30am NW Traffic is re arin to lace extruded curb, T/C has been laced.
--..._._..._.. _..................—............._......P....._P_...............9._.__.....P.............................-----.._..._.................__..__..............................._.........................P—.._..........................._...._........................................................................................................................................._..__..._..._..._...._
NW continues to place extruded curb, the mold they are using today is working properly and they are making
9_00am goo�rogress. KC has finished takingcore samples.
10:00am Off-site for meeting. _
10:30am
11:30am
--..._..._._...............---._....
............---.....................
_............... .—..
....... ...__............................................................------........................................._...........-.—_.............._.............................................................................................._...
NW Traffic continues to place extruded curb at Sta. 18-22+01 +/-. Icon is preparing the subgrade at 9th to correct
12:OOpm a grading issue and prepare fo.r concrete work.
.............. .._._—............._......- -.. ......... ........ ......... ........ ......._........_... ----
NW has finished with the median at Sta. 18-22+01 and are relocating to the small island at Sta. 14+58-14+71.
GS is placing T/C for the median at Sta. 29+50-33+00. Bob Hanson was on-site to inspect the curb placed
yesterday, 8/15/16; he stated that he will allow Icon to make a decision on whether or not the work is accepted. I
1:OOpm have relayed this information to Bill.
——..............--- -.......... ......... --- ---........._........_......................-----.-...-...-..............
I have spoken with AGS about T/C for the newly placed curb; I asked Jessie to place candle sticks around the
medians until curing is complete and the paint has been applied. NW has finished the small median at Sta. 14+58-
14+71 and have relocated to the median at Sta. 22+51-33+00. Bill from Icon stated that there was a conflict with
he retaining wall at NE 7th ST. and the proposed storm pipe at the SE corner. I directed him to draw up the
?L.00pm_ changes needed and to submit them to Ken for approval.
---._ .......------.._..._.._.-..._-- -. .. .................._............._...........__.._......__...._........-----....._.._._............
NW continues at Sta. 25+00 +/-, they will finish the material that they have and will be done for the day. AGS is
3:00pm waiting to place T/C for the
._OOpm Work has finished for thedaar
Tcld�i°ei/c 8/16/2016
Inspector's Signature Date
Cityof - INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3of3
Subject:
�a Y Asphalt testing
__............---..............................._......._ _..............................------....._
'^ Location:
Sta. 48+50, 64R +/-
Is
n Comment.
King County Testing is taking core
zie
samples for gauge correlation.
3��
Subject:
s Extruded Curb
.�
Location:
Sta. 18+01-22-00
- Comment:
YY ,�yyx
NW Traffic is placingextruded curb for
the median.
Subject:
Extruded Curb
......._.._...................................._........__..__.__. _...._.._............................................................
ti
Location:
Sta. 18+01-22+00 +/-
Comment:
NW Traffic is placing the dowels into
F 3 `I ti4 the curbing.
Z F ,.k•a "+."^+. see
Tdd f�ei/c 8/16/2016
Inspector's Signature Date