HomeMy WebLinkAboutInspector's Daily Reports - 8/15/2016 .b y, 000000,® 0c:wof .- INSPECTOR'S DAILY REPORT � ( Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 4 �� II IIII I III IIII IIIIII I II IIIIIIII I IIII III VIII III II � � - • !7T:O7Oam `03854 708-Inspector's Daily Reports 08/15/2016" ••- Monday,August 15, 2016 Inspector: dd Freih Inspector's Shift Hrs: 7:OOam TO 3:30pm Temp Sky Time Temp Sky 61 Clear 3:30pm 83 Clear SID Contractor a resentativen�tle ID Contrac#ori e Re resentative%Titl A Icon Materials Bill Johnson/Foreman F —.�._...._—_...-..._�......._._.__._........-..........___ _.............__ __.-...................................._. B AGS Jessie Dillard/TCS G C NW Traffic Scoff Hoefling/Foreman I --............._._.._._..........__._......___.--._._..._..---- – — D J -._—......... ....................__—.............. ._-_....................._.-.�.__..._...........---- ---.............. ...... __.__.._... ........... .... _...... .... ._- E K ,Work Activity SID . • Descri tion _ Location_ _ Crew, , E ui A Placing HMA for the Sta. 36+85-49+38R +/- 6M,1 F Water trk, F250 P/U, 2 F450 pavement repairs U/T, Cat CS 563C Roller, Cat CB54B Roller, JD backhoe, Ranco grader,Case Exc. Cat 140H grader. Cat Paver. B Traffic control All 2F, 3M 2PCMS, 2Arrow boards, F150 P/U C NW Traffic 18-22+00+/- 4M International U/T Curb machine Traffic Control Was Traffic Control Req'd Today? _Yes Was WZTC per approved TCP? Yes Comments: . DeliveryMaterial Todd� i/c 8-15-2016 Inspector's Signature Date � . 15. mo Re ewed By(Signature) Date Citvof r , M INSPECTOR'S DAILY REP®RT �n Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 4 viswal Inspection Descri on tiest.Vit, Unit per ROM/QPL? Onsite In/Out of i lime Material Descri�tion Location/Ofifset Conformance None Me iscussion 7:00am Crews are on-site removing the wee at NE 9th St. in preparation for paving_AGS has established T/C. 8:00am Icon is placing HMA at Sta. 36+85,40+00, 64R. AGS is preparing for the extruded curbing at the medians. ---......--....... __...........................................__...._. Is on-site to place the extruded curb at Sta. 18+00-21+00 +/-. The mold for the curbing is not placing material in a satisfactory manner; the crews are attempting to make adjustments. Icon continues to place asphalt a 9:0.0_ am Sta.42+50, 64R +/-. NW Traffic is placing Ext. Curbs in the southern median (Sta. 18-22+00), Icon continues to place HMA at Sta. 3+00, 64R.AGS continues to provide T/C for all work. I have contacted Casey with KC Testing to take samples 10:OOam of the extruded curb; he stated that he will be available in approxi 2 hours.__— __ - -- -._..............._.....— -............................................_ Paving continues at Sta. 45+50, 64R+/-, NWT continues to place curb at the southern median. 10:30am 11:30am Paving continues at Sta_48+50, 64R+/-, NWT continues to place curbs ............._.. .......... ............................................... _... __...._._._. __. ............................ NWT has stopped placing curb due to equipment failure. Icon is placing wedges at the intersection of 9th and a 12:30pm Sta.36+85, 64R. Icon is placing temp markings on new surface to allow opening of the left lane to traffic. The electrical contractor 1:30pm on the Chelan Plat is taking trees down next to the roadway on Duvall with no spotters or traffic control. _...._._.__..—.._.................._._. ......... _._ --. .. .................. . ---- ..._........_.. I have sent photos of the extruded curbs to Ken and Flora; the finish is uneven from excess hand work done to compensate for the mold. Icon has placed temporary marking tape on the roadway from 8th to 10th. I have no bid item for tape. The material approved for temp markings is paint. T/C is being adjusted to allow use of the left 2:OOpm_northbound lane from Stn to.._1.Otn_.._..._..- ----._...._....._._. ._..._........_......................................................_..........................._......._.....-.- _-- _...................................._............._........................_............._........_ 3_OOpm _ Icon has finished for the day, AGS is adjusting T/C 3:30pm_Work is finished for the day.— Tcicl6-4 8/15/2016 Inspector's Signature Date Y , ' ' • ' ,' ZZ'A• 41:Ir- r4 — T NW Traffic is placing ext. curb in the Asphalt Repair il I r '�` ►ti 9 �S. i 161; "tl! �.a 22V y ba.Y "4 K rn.-i S}hSf, t. --' • Icon. placinga wedgeat the end of p �Ciwnr INSPECTOR'S DAILY REPORT ,ter Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 4of4 Todd/;e/x 8/15/2016 Inspector's Signature Date