® �cwof r INSPECTOR'S DAILY REPORT
Q Duvall Ave NE Pavement Preservation Project
Contract o CAG-16-004, Fed Aid No: STPUL-1113(003)
�f II IIIIIIIIIlIII�III IIIIIIIIIIIIIIIIIIII�III II II IIIIIIIIIIIIIIIIIII Page of
*03854 708-Inspector's Daily Reports 08/11/2016'
Daily • • ... hursday, August 11, 2016
D. -
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am TO 3:30pm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Clear 3:30pm 81 Clear
ID Contractor {, Representative/Title . X IDS Contractor Repress tative/7ite °'
� �t4A ��. k.X §t5
A Icon Materials Bill Johnson/Foreman F
_.._.....—............_—......._.._.. .._..............- -._.........._....
...._._ —:_...._.._ ...--._...
B AGS Jessie Dillard/TCS G �—��--�- �.......... ---- -—--- --- —_... .........._........ -
C I
.
.....—_.....�._..............---..............---.-............. ........-______.....................................__.......____........._................ __.._._....-_..-...._...................................................................._..................-........._..... ._.....__..................................._.......................
D J
... ......................_..---............ ----.._..._.........................._._.._.......----..._............_...-- -.._..............................._......_..._......._..........._....._...._......................_...........-_...... _ ------._........_.._...................................
E K
Work Activity
A Preparing roadway Sta. 14+60-14+80, 18+00- 1 F, 4M Water trk, F250 P/U, F450 U/T,
surface for installation of 22+00, 29+50-33+00+/- Cat CS 563C Roller, Cat
extruded curb at CB54B Roller, JD backhoe,
medians. Ranco grader, Case Exc. Cat
140H grader. Bobcat skid steer
loader.
B Traffic control All 4F, 1M 2PCMS, 2Arrow boards, F150
P/U
Traffic Control
Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP? Yes
Comments:
DeliveryiMaterial
Tdd 6e1X 8-11-2016
Inspector's Signature Date
� •II - I�
ev ewed By(Signature) Date
citvof INSPECTOR'S DAILY REPORT
® q c� Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
visual Inspection
Desc_ri�tion.30•m Est.Qt. Unit . per ROM/QPL?
OnTesting
site
YnJOut o
<�ime Material �escri•tion Location/Clffse Conformance
None
i e Y)iscussion
7:00am Finished paperwork from 8-10-16.
8:00am ....._...._............... ---......................................................._..._._......__._._..._......................._........_ ._._..........._..............................................................._..........................._.._........._.........__..........................-—.—__-................
Icon is performing layout for the extruded curb in the median at NE 61h St. AGS is providing T/C for this work and
8:30am at NE 9th.
9:00am Icon is rindin the ed a of the excavation at Sta. 18-22+00+/-to provide an even surface for the extruded curb.
..................._.....---...._..._._..._......._._................9..---.............g.._.—.................................................................__.—........................... _— _.................... ..................................................................._..._........_........................_........._......-----............._
10:00am Icon has relocated to Sta. 14+60 to continue layout_
11:00am I.con...is winding for the median at Sta. 14+60-1.4+80.............................................................................................. _.........._.._........._..................._................_.........—.._.........
12:00m Icon is performing layout in the median at Sta. 29+50-33+00. Work at Sta. continues.
1.30pm KC Testing_is on-site to perform compaction testing__
2:30pm Compaction_showed some inconsistencies but has been acceptable so far. (36+85-38+10+/-) _ _
KC Testing has completed testing and is finished for the day (passed) Icon is finished for the day. AGS is
3:30pm—stabilizing the site.
4:00pm Work is finished for the day. _`_
Tdd 15614 8/11/2016
Inspector's Signature Date
L0:1119
kilo, • • • •
Y
MV
, "r{ 1 t,oy��^ s•.,..
` „!Y � �a4t � a1 a �}��i, ���„ .�-'�` 1r'�1��� • •
-
r
•rT_�� l�_ _ V �A frrrf,�`. 4�1�1.. f � P.�� ,d.vS�,J� .G'vi
i v3 ;,bra �,�S� +t+ ��'��„� '� .3` r4 �rte, ...,�a,,.t� �� • .
S-,—... � d'r:�,.r.'� ��- �.• r_�.• yiq Yrs ' ` ,p,
u .tom
•1provide an even surface for the curbs.
.
Icon is grinding the pavement to
s•.r+„
l
• -
CompactionTesting
• "-'�' `�� 1�' w� -� �k�� ' Fri
3%t. 'Z �"r�y-1� 2rY.. ra �h Y r• (+R'�. Location:•
testingKC Testing is performing compaction
for the pavement repairs.
0:/Z1/?VSB