HomeMy WebLinkAboutInspector's Daily Reports - 8/10/2016 INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIIII I II I III II I II III I II II II III I I I II �I III III II Page 1 of 3
- *03854 708-Inspector's Daily Reports 08/10/2016* $9.NO
ednesday, August 10,
- 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To F
:OOpm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Cloudy 2:30pm Clear75
ID Contractor` ' ' RepresentativelTitle ' ID 'Contractor Representatve/Title
A Icon Materials Bill Johnson/Foreman F
_.._-_..._.........___....................___.............._-.............-_-.-....................__......_........................:................--- _..._._..............................-...-.._ .................................................-............................................._..._.._............-__--._..-....................................,......................................._.._.-._..._.
B AGS Jessie Dillard/TCS G
--...-_....._.......__........_......_—...............—_......._.----._......._............._...__._......._..................._._..-------.._......................._......._..__..._. ............I.........._..... ----......--........_..._...---.._—..._..........._......................._._._.._._..._...._.._.......................................
C Totem Electric Chris Bond/Foreman I
- ----...........---.............---._.................—_..................-----.._............_..... ---..._............................_..—_.............. ...........---._..._._._..- -----...................._......._..........._..._...- - -------
D J
..........................—.._............----.._..............---._.................__...----................._.._..---..-.._......................................................__...—_...._................ ._.......__._....- .........................._..._.....__................................................................._._..-------- ------..................
E K
Work Activity
ID Descri tion: Location,'.` , Crawk =`E` ui'
A Preparing subgrade for Sta. 36+85-49+38R+/- 2F, 7M Water trk, Roadtec RX500
paving Pavement grinder, F250 P/U,
F450 U/T, Cat CS 563C Roller,
Cat CB54B Roller,Western
Star Semi W/Trailer, JD
backhoe, Ranco grader, Case
Exc. Cat 140H grader. Cat
Paver.
B Traffic control All 3F, 1M 2PCMS, 2Arrow boards, 2
F150 P/U, Kubota Mini Exc.
C Installing Ped Signal Sys NE 6th St& Duval Sta. 22+55+/- International Box Trk, Dodge
2500 U/T
Traffic Control
Was Traffic Control Re 'd Toda ?_ Yes Was WZTC per approved TCP? Yes
—..._................_—..........__..._ ......9 . ._.. . � .. . — ............._. _.
Comments:
Todd F11114 8-10-2016
Inspector's Signature Date
01
evi d By (Signature) Date
®ritvof -ni INSPECTOR'S DAILY REPORT
;� 1 Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Material Delivery
Inspecfiion
Descri do E-st. Qt. Uni per ROtUI/BCW
Onsite Testing
I%fOut of
me Niat�rial Descri��tion Location/Offset Gonfiormance
None
,Diary
� ime Discussion
7:OOam Icon is_preparing to place crushed surfacing,AGS is placing T/C,
.. _..-----...._.......-----__......................................._..----._._..._._......................
_...._._... - ..._...
.
Icon is placing crushed surfacing using a paver AGS is providing T/C. King County testing is scheduled to be on-site at 12:OOpm to take
8:OOam compaction tests.The pass through is being reduced to one lane at 9th in_preparation for placing crushed surfacing__
8:30am__ _GS is placing T/C for Totem at Sta.22+55+/-, Icon continues to place crushed.
.._ ......--........_.........__._...__.....----.........................._._.___ - ---—_.._....._._.._...—---- ------ ........._._...._..._._.....__.......
Totem is performing saw cuts at 6th.AGS has the center lanes closed and are flagging the remaining lane when needed.Surface preparation
9:OOamcontinues.
...._......_...... ._.............__............._-—__..............._—......._....._..__..._....-.........................._..._.._...._..........._..._...—_--._......................._................_...------.._......................_........_._..._...._.._............................................_........................................................................_.._....---
Totem is waiting for locates;this will cause them to begin the crossing tomorrow.AGS has a crew on-site installing the Class A signage for
10.00am the detour, Icon continues to prepare the base at Sta.48+00+/-.
11.30am Subgrade preparation continues;Icon is performing compaction as material is placed:
_._ ._........._.........._..._........_................_..._---... _............................................._..........................
I have met with Maser from KC Testing; he stated that they didn't have a curve on the crushed material due to the pit not being a state
approved source. He needs a moisture offset and testing to be able to provide accurate compaction numbers. He won't be able to perform
testing until 12-1:OOpm tomorrow. I have informed Bill and Ken. Ken stated that he will have Perteet perform survey on the ROW at the
12.9 -!:fl corners to insure that we remain in the ROW when placing walks.
_.......... ..... .............. -....................__..............._.......... -- -.....-- _._... ............... ----------..__._............__......................._._..._..._......__................_....._..._...__........_.................._.
Icon has restored the approach at 9th. Bill stated that they plan to work on the medians tomorrow and pave on Friday. Totem will wait to
1:30pm— perform the crossing until Friday when they can get HMA for the crossin�on is replacing the wedge aloes the excavation.
........._.... ---...............----......_.. ..._._.._...............................
Icon has finished for the day.AGS is stabilizing the site. I have spoken to Travis from AGS;he stated that two of the#3 signs for the detour
2:OOpm _ directed traffic in the wrong direction and that he would have to order the correct ones. I directed him to inform Icon.
2:30P...�?_.._ ..._GS has finished for the da..y....__—_...............................................................
Todd/wcd 8/10/2016
Inspector's Signature Date
Com, �.4- •- i�4'"ji w.- Location Comment: Icon is removing the
grindings from the approach at NEqth
' Air - --a
Crushed Surfacing
Location
• "x` iSta. 43+55-49+83R
Comment:
wly bW
Icon is placing e• surfacing
- using paver depth • •
r�at�r��r2.to�r.
Subject:
Pedestrian Signal
.r
'f - Location
Totem isperforming saw cutting.