Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/10/2016 INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIIII I II I III II I II III I II II II III I I I II �I III III II Page 1 of 3 - *03854 708-Inspector's Daily Reports 08/10/2016* $9.NO ednesday, August 10, - 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To F :OOpm Weather: Time Temp Sky Time Temp Sky 7:OOam 60 Cloudy 2:30pm Clear75 ID Contractor` ' ' RepresentativelTitle ' ID 'Contractor Representatve/Title A Icon Materials Bill Johnson/Foreman F _.._-_..._.........___....................___.............._-.............-_-.-....................__......_........................:................--- _..._._..............................-...-.._ .................................................-............................................._..._.._............-__--._..-....................................,......................................._.._.-._..._. B AGS Jessie Dillard/TCS G --...-_....._.......__........_......_—...............—_......._.----._......._............._...__._......._..................._._..-------.._......................._......._..__..._. ............I.........._..... ----......--........_..._...---.._—..._..........._......................._._._.._._..._...._.._....................................... C Totem Electric Chris Bond/Foreman I - ----...........---.............---._.................—_..................-----.._............_..... ---..._............................_..—_.............. ...........---._..._._._..- -----...................._......._..........._..._...- - ------- D J ..........................—.._............----.._..............---._.................__...----................._.._..---..-.._......................................................__...—_...._................ ._.......__._....- .........................._..._.....__................................................................._._..-------- ------.................. E K Work Activity ID Descri tion: Location,'.` , Crawk =`E` ui' A Preparing subgrade for Sta. 36+85-49+38R+/- 2F, 7M Water trk, Roadtec RX500 paving Pavement grinder, F250 P/U, F450 U/T, Cat CS 563C Roller, Cat CB54B Roller,Western Star Semi W/Trailer, JD backhoe, Ranco grader, Case Exc. Cat 140H grader. Cat Paver. B Traffic control All 3F, 1M 2PCMS, 2Arrow boards, 2 F150 P/U, Kubota Mini Exc. C Installing Ped Signal Sys NE 6th St& Duval Sta. 22+55+/- International Box Trk, Dodge 2500 U/T Traffic Control Was Traffic Control Re 'd Toda ?_ Yes Was WZTC per approved TCP? Yes —..._................_—..........__..._ ......9 . ._.. . � .. . — ............._. _. Comments: Todd F11114 8-10-2016 Inspector's Signature Date 01 evi d By (Signature) Date ®ritvof -ni INSPECTOR'S DAILY REPORT ;� 1 Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Material Delivery Inspecfiion Descri do E-st. Qt. Uni per ROtUI/BCW Onsite Testing I%fOut of me Niat�rial Descri��tion Location/Offset Gonfiormance None ,Diary � ime Discussion 7:OOam Icon is_preparing to place crushed surfacing,AGS is placing T/C, .. _..-----...._.......-----__......................................._..----._._..._._...................... _...._._... - ..._... . Icon is placing crushed surfacing using a paver AGS is providing T/C. King County testing is scheduled to be on-site at 12:OOpm to take 8:OOam compaction tests.The pass through is being reduced to one lane at 9th in_preparation for placing crushed surfacing__ 8:30am__ _GS is placing T/C for Totem at Sta.22+55+/-, Icon continues to place crushed. .._ ......--........_.........__._...__.....----.........................._._.___ - ---—_.._....._._.._...—---- ------ ........._._...._..._._.....__....... Totem is performing saw cuts at 6th.AGS has the center lanes closed and are flagging the remaining lane when needed.Surface preparation 9:OOamcontinues. ...._......_...... ._.............__............._-—__..............._—......._....._..__..._....-.........................._..._.._...._..........._..._...—_--._......................._................_...------.._......................_........_._..._...._.._............................................_........................................................................_.._....--- Totem is waiting for locates;this will cause them to begin the crossing tomorrow.AGS has a crew on-site installing the Class A signage for 10.00am the detour, Icon continues to prepare the base at Sta.48+00+/-. 11.30am Subgrade preparation continues;Icon is performing compaction as material is placed: _._ ._........._.........._..._........_................_..._---... _............................................._.......................... I have met with Maser from KC Testing; he stated that they didn't have a curve on the crushed material due to the pit not being a state approved source. He needs a moisture offset and testing to be able to provide accurate compaction numbers. He won't be able to perform testing until 12-1:OOpm tomorrow. I have informed Bill and Ken. Ken stated that he will have Perteet perform survey on the ROW at the 12.9 -!:fl corners to insure that we remain in the ROW when placing walks. _.......... ..... .............. -....................__..............._.......... -- -.....-- _._... ............... ----------..__._............__......................._._..._..._......__................_....._..._...__........_.................._. Icon has restored the approach at 9th. Bill stated that they plan to work on the medians tomorrow and pave on Friday. Totem will wait to 1:30pm— perform the crossing until Friday when they can get HMA for the crossin�on is replacing the wedge aloes the excavation. ........._.... ---...............----......_.. ..._._.._............................... Icon has finished for the day.AGS is stabilizing the site. I have spoken to Travis from AGS;he stated that two of the#3 signs for the detour 2:OOpm _ directed traffic in the wrong direction and that he would have to order the correct ones. I directed him to inform Icon. 2:30P...�?_.._ ..._GS has finished for the da..y....__—_............................................................... Todd/wcd 8/10/2016 Inspector's Signature Date Com, �.4- •- i�4'"ji w.- Location Comment: Icon is removing the grindings from the approach at NEqth ' Air - --a Crushed Surfacing Location • "x` iSta. 43+55-49+83R Comment: wly bW Icon is placing e• surfacing - using paver depth • • r�at�r��r2.to�r. Subject: Pedestrian Signal .r 'f - Location Totem isperforming saw cutting. 01 M M 000011111111. nnn i • • •