HomeMy WebLinkAboutInspector's Daily Reports - 8/9/2016 r
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 1 of 4
IIIIIIIIIIIII VIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIillllllllllll
• • *03854 708-Inspector's Daily Reports 08/09/2016* INT
uesday, August 9, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 5:OOpm
Weather: Time Temp Sky Time Temp Sky
F--1 7:OOam 63 Cloudy 4:30pm 69 Cloudy
ID Contractor ' RepresentativefTitle -1D Contractor Representative/Title
A Icon Materials Bill Johnson/Foreman F
..-......._.—__....__._�_.-_._......_...-- ----..._.—.—_. - _ __ — -- ---......--------._..__....__.._...................
B AGS Jessie Dillard/TCS G
- ----—...... ._...-...._. .._....._..---.._..................._...._....................................._._....---- - ----------------------...._..._.------_._._._......._...._...---- -------........----.-----................_.......-.--
C Mulier const John Forester/Foreman I
--------------------— ----- --- ---
D J
........... ---..__..._....-- --......... —._.. _._......-_. ----------.............._......................._.__.. ............... ------- ...-..................__...__..._..._.............................----............ --
E K
Work Activity
ID Description Location " { ! Crew Equip
A Asphalt removal 43+75-49+38R +/- 3M, 1F Water trk, Roadtec RX500
Pavement grinder, F250 P/U,
F450 Ulf, Cat CS 563C Roller,
Cat CB54B Roller,Western
Star Semi W/Trailer, JD
backhoe, Ranco grader, Case
Exc. Cat 140H grader.
B Traffic control All 2F, 1M 2PCMS, 2Arrow boards, F150
P/U
C Planing pavement 43+75-49+38R +/- 2M Kenworth Trk Wlfrl, Grinder,
Freightliner U/T
ControlTraffic
Was Traffic Control R q'd Tom? YesWas WZTC per approved TCP? Yes—_
Comments:
8-9-2016
Inspector's Signature �yDate
R vie By(Signature) Date
. City of,.-, INSPECTOR'S DAILY REPORT
1 Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 4
DeliveryMaterial
g EsusD nspec ®ro...:
D�scr�pt�on � . - *Est,QfY,. f�'J�nat# per Ftp�/CQP�?
Onsite
to t�s�f
kyirri� : Nlateri�,t��escrbptor>I � !.a, t>Ior�lOffset 'Cotafrarrnane� .
None
D .
,, irr>fe Dscusscori
-
Icon and Mulier have begun to perform pavement removals at Sta.43+75R+/ and subgrade preparation at Sta.36+85-49+38R+/-.AGS is
providing T/C.Icon has decided to remove the pavement across the intersection at 9'h first thing this morning and leave the grindings in
:00am place for use as a ramp_ -
...__.._.......__.—._.._. ...---............-..............................--........._--...................................................................................._........_._......_.__..-.._.._...............................
Mulier has made on pass through the intersection and it appears that leaving the grindings in place will provide a suitable surface for passage
8:00am of traffic once compacted.
_..._.._......._....- -.. -- ..... - . .._......__...._.._....__.... .._.._..................... ..........here here has been an accident at the corner of NE 6ch and Duvall;this appears to have nothing to do with our activities as all work is being
8:30am.... . performed at 8'h-10 St.
9:00am Icon is removing spoils from yesterday's work. Pavement removal continues.
10:30am Pavement removal continues..Trucks are spaced out too far and work is progressin slowl .
_...._.. ...._..__.._._._................................— ................._...... .._............._..... --................._......_............... ----.._g__.................y.-_......................._..._............._.
11:30am Work continues.
.............__.........__......---......_........_...........---......................_._..................._..-----............................----......--- ...._._.._...._.................................._...- ... ......__................................_.:.....:........................................................................................_..-- - _.._.................................................
I met with Chris Barnes from Totem and Ken to review the electrical installations. It has been decided that the existing J-Box at 6th will have
12:30pm o be relocated due to the proximity to the ped-ramp.
... ..............................................................- ....._..._.................. ........................................................._
. . .,
1:30pm _Mulier has finished pavement removal_Icon is preparing the subgrade for crushed surfacing.
---- ----......._..............................................................................................................
3.0 pm_ Icon is placing the.wedge,along the excavated area.
_OOpm Icon has finished for the day AGS is removing the T/C and securing the_site__
:30Pm- .:...__GS is finished for the day........_......_....................................................._........__.....
.__.....................:................._...._....................----....................-----...................._.._....................._..___........_......_...._................_................................_............................................................._.........-....---.._.........._._......................_...._....................................................................................................__.._..__.._........_.........................._.._.._.......
Talar/ e/Z 8/9/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
a_
(5i;0 ®uvall Ave NE Pavement Preservation Project
Contract#CAG-1 6-004, Fed Aid No: STPUL-1113(003)
Page 3 of 4
Subject:
k Pavement Removal
Location
4 Sta. 42+65-49+38R +/-.
Comment:
4
Mulier is full depth planning the
pavement.
c,
Subject:
Pavement Removal
ea --- --- —.... -- ----......-................................
° Location
Sta. 42+65-43+00R +/-
:.. Comment:
\,4 J
, n Icon is stabilizing the intersection at
NE 9th St.
Subject:
Pedestrian Signal System
a -
9
Location
SE corner of NE 61h St.
m t alk —._.........._......_......... —y ....................
...........-.......................
---
a 3
Comment:
T •J+
' a r Photo shows the location of the J-
, � � �f
Boxes. Chris and Ken are located at
,w the J-Box that will be relocated to the
' position of the cone.
G ri�
Tdcl fwei�i 8/9/2016
Inspector's Signature Date
C t,of�
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 4 of 4
5aW 15-Ao 8/9/2016
Inspector's Signature Date