HomeMy WebLinkAboutInspector's Daily Reports - 8/8/2016 4 INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 4 • • -03854 708-Inspector's Daily Reports 08/0812016' ••. Monday, August 8, 2016 Inspector: Todd Freih Inspector's Shift Firs: 7:00am To 5:30pm Weather: Time Temp Sky Time Temp Sky 7:O0am 60 Cloudy 5:00pm 75 Clear D Contractor` .,. ,Representativefi itle ID' : -'u Contractor . Representativef iltle x.:P A Icon Materials Jeff Price/Foreman F .............._........_...._.........._ _ .............. . ....._.....---........................: ......................_......_.............----...... .. :......_..._.:.....__...:...._.:.....:...._..........._..._...,..............._. _ ...........................B AGS :.....:.....:.. . ..,...;......... _ Jessie Dillard/TCS G _.........................--._...._....:_............ -'—J .............................................,........_.........-- -..._.....__...... ....................._.....--_......_........:..:._......_................._..........................................................--- -----.._........_._......:._..._.::__.._.:_. C . Mulier const ohn Fore... ster/Foreman I ---..........................----...........................---..........:.....:....__...............................................................................................---......------............................. -- - .._.... -......_.... - - - - -- - ..._........ Ik J __...._.._........_.............. .._..._................_.__.:.....................--......................._........_.._.. - -----... .._........................_... _ ................_.........._....................---..._.....__................._.._................................_..........._............................................._................._.................................. _ .. K ID' ®escr` tioro ,,lWork Activity Location , I Crer�r t Equip A Pavement removal Sta. 36+85-49+38R +/ Pavement grinder, F250 P/U, Cat CS 563C Roller, Western Star Semi W/Trailer, JD backhoe, B Traffic control All 2M, 1F 2PCMS, 1.Arrow board, F150 NU C Pavement Grinding Sta. 36+85-49+38R +/- 2M Kenworth Semi W/T, Pavement grinder, Freightliner U/T TrafficlControl Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP? Yes ..............................................---.............................................._.... -.............. ............................ ............................................._......_..... .----- Comments: DeliveryMaterial Tad fwei/c 8-8-2016 Ins ctor's Signature Date i wed By(Signature) Date City of,b _ INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-18-004, Fed Aid No: STPUL-1113(003) Page 2 of 4 1lisual Inspection Descri tion Est. Q� Unit per RO J�gPt.? Onsite In/Out of lime Material Descri-tion LocatioNOffs # Conformance None alma i)iscuss'on Crews are on-site preparing to remove pavement at Sta. 36+85-49+38R +/-AGS has placed T/C diverting :00am traffic to the southbound lanes during this processes COR crews were on--site to perform pavement restorations where the water had been installed. I directed them o stop work as the contract states that Icon is responsible for exc. and repairs for work associated with the tie- in. Pavement grinding continues; I have spoken to Bill about the intersection at 9th and he stated that they plan o remove pavement from all the lanes up to ninth before crossing the intersection. When the intersection is 8:30am . removed they will have to stop traffic and redirect them until the area is made.passable__ 9:30am Grindin continues, AGS has laced fla ers at the intersections to aid traffic from the side streets. _........__..........--.........._..- - ...,.....-_.,......_...__.......... -...................................P.._.................................9�............_..... _ ...._......_........ __.............._......_.;.._.......-......_...._.._........_.._...._.... ...._.._....-...._........__.......... -- -- -...--.......... . 10:30am.. Mulier is beciinning the_third pass which will complete the.first.lane to.9th. have verified the excavation depth of the pavement removal;.at this time I find the-depth to be 10" and the contract call for a 1' min.The subgrade appears to have a high level of organics. I have spoken with Bill and he tated that the plant will only accept asphalt and crushed rock so they intend to perform the final grading outside 11:30am of the grindin9.....P...rocess....................... ._.._.. ---- --- - -...__.:.........._ _ ..... .........._.__.................................... ............. - -- ..... I have inspected the subgrade and found the material to contain a high amount of fines. I spoke with Ken and it 12:00pm was agreed that as long as the material was solid we could allow it to be used as is. Icon is finalizing the grade. Pavement removal continues. I have discussed the requirements for the edge along the removals; a 4x1 wedge 1:30pm __ ,.ill be placed the entire length of_the excavation per WSDOT requirements with barrels and signage____ -- --............--- —--._......... _.:__..._.. --= -- _ Icon is placing crushed surfacing along the edge of the excavation. Planing has finished for the day. I have 2-.30pm orwarded:a photo of the light that was damaged at the SE'corner of 6th to-Ken. 3:30pm Icon continues to place the wedge along the exc.AGS_is placing more T/C devices. :30pm _Work continues on the edge of the_exc -_00pm-_ Icon is finished for the day, AGe. .S is securing the site.. 5:30pm Work has finished for the day___ _.-.........._-___.._.........................._.....------ --.._...... -...... ------------------------ Tc(cf fi�ei/c 8/8/2016 Inspector's Signature Date Z INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 4 Tcicl Fi°ei�i 8/8/2016 Inspector's Signature Date a pP. <,t,_ 4)f,- INSPECTOR'S INSPECTOR'S DAILY REPORT ""'� Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 4 of 4 Subject: Pavement Removal ......-----.................. Location: r Sta. 36+85R +/- � w Comment: Mulier is removing the pavement for repairs. 0. Subject: Pavement Removal r r Location W to + + - ----------- t Comment: Picture shows depth of removal after planing. a° e - F �uif J Subject: Broken Light Fixture _.._.------------------------------------- Location: ------------ ---..._Location: E corner of NE 6thSt. �*Fvo!;MAft0, --- . _...._....---- — er g Comment: a Picture shows light that was allegedly broken during concrete removals. 8/8/2016 Inspector's Signature Date