Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/5/2016 c:IVOIF INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 1 of 3 II IIII I III IIIIIIIIIIII I II IIIIIIIIII II VIII I III III IIII II • • *03854 708-Inspector's Daily Reports 08/05/2016* ••. Friday, August 5, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 4:00pm Weather: Time Temp Sky Time Temp Sky 7:00am 61 Clear 3:30pm 80 Clear 7AGS _ r.epresentative/Title ID Con#tactor. Represent tivelTitie on Materials Jeff Price/Foreman F .....----........---.._...._........._... .---.............................._.................._...–_._.................._ ......_....................................._.................._.............................._..._.........._.......... -...---------....---------......_.........Jessie Dillard/TCS G _.........—._..........._....—....._.._.....-----.._._._......._—..............._.......... _— ._.._.................--.................. _....._.....__ -- --- .. ..._.._.__._._.._._._..._........_.........................._._.._............... _ C RCD Trucking Doug Johnson/Driver I ................__.-....__......_.............-- ..._..---.._......_—. ._._._.........---- ._.._.._..............................._.................._......_. __._.._......_.........................................................................................._.............................. —.._.._.._...._..-----._—__...__ D J ---...._..._...... ............__................---......................._..__.___...............................................---.._.....--------- ............................................................................................................_..._._...................-----.............................._............................................................ E K • Desci tions �Y Location . `CreE ui' n A Conc. Removal NW corner of NE 6th 3M JD 50D mini exc., JD Backhoe, Ford f250 P/U B Traffic control All 1M, 2F 2PCMS, 2Arrow boards, F150 P/U C Hauling spoils NW corner of NE 6th 1 M 1 Kenworth D/T Traffic Control Was Traffic Control Req'd Today? Yes _._._—__._.._._........__....____Was WZTC per approved TCP? Yesd — _..........................._._._._ ._ Comments: Material Delivery 11 a ection Descri-tion Est.Q : Univ pea ROMMR�'1.7 Tcld f�ei�i 8-5-2016 Inspe tor's Signature Date Ivieted By (Signature) Date <<«�'�� INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Ou#of ime Material Descry tion MUM.f nformance None dime Discussion Finished paperwork from 8/4/16. 1 have received a call from Ken stating that Icon would like to close NE 9th at 7:00am Duvallwhile the pavement is removed_A revised T/C plan for this work will have to be submitted. 8:00am GS is on-site preparing to place T/C. _....._..._..__............_......_ ...__._.......-- -...................---..._........._..... ._................_._......_....___....--— -- ..._-......._.._.. -- -._._....... - 8:30am Icon is preparing to begin at the NW corner of 6tn. T/C is in place._— __..._._.. -—- ...._._. --._._.._.. _... . ------..._.-.........................._...._......................................................_._....._........ Icon continues to remove concrete at the NW corner of 6th. Bill informed me that there are traffic loops in the 9:00am roadway at.NE 9th that are not shown on the prints; I have called Eric Cutshall for clarification. 10:00am Work continues. 11:30am Icon continues to prepare subgrade for walk at the NW corner of 6tn 12:30pm Work continues. 1:30pm — Icon has finished removing material from the corner and are placing crushed surfacing —_ 2:00pm Icon has finished at the NW corner and are planning to perform layout at 7th_AGS is removing th. e T/C at 6th. I received an E-Mail from Flora about the SE corner of NE 6th St;she stated that the president of the homeowners assoc. had complained that we were tearing up their property and wanted to know why we removed the sidewalk and didn't notify her. I took photos of the area and measured the distance from the existing pavement to the 3:OOpm_ back of the exc. and found it.to be 9'3" at its' greatest point. AGS_has finished for the day. _ 3._30pm_....._.__Work has finished for the day. ...............--.-_.....................-_._ Todd/54 8/5/2016 Inspector's Signature Date w p cit.-of • . INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: Concrete removal Location NW corner of NE 6th St. Comment: Icon continues to remove concrete. a a,xa Subject: Right of way s Location i' SE corner of NE 6th St. Comment: Photo shows the property boundary Y at the SE corner of 6th -541 .1T . a } Subject: Right of way i Location - SE corner of NE 6th St. Comment: Photo shows the extent of removals performed at this location. joc(d A'm—4 8/5/2016 Inspector's Signature Date