HomeMy WebLinkAboutInspector's Daily Reports - 8/4/2016 : INSPECTOR'S DAILY REPORT
r
j rl�a r'tC,, Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004 Fed Aid No:STPUL-1113003
_ Page 1 of 3
II IIII I II� II II IIIIII I II II II III I I II III I I III III II
*03854 708-Inspector's Daily Reports 08/04/2016" •., hursday, August 4, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 4:OOpm
Weather: Time Temp Sky Time Temp Sky
7:OOam 61 Clear 3:30pm 78 Clear
113 Contractor`, " 'R epresentative/Title 1D Contractoi Represeritative/Title
A Icon Materials Jeff Price/Foreman F
B AGS Jessie Dillard/TCS G
C Green City Jesus Garnica/ Foreman I
D J
Work Activity
ID.;. •.. D'escr'i tion `Location . 9 E Crew
A Concrete removal NE 6`St 3M JD 50D mini exc, F250 P/U,
J/D backhoe
B Traffic control All 2M, 1F 2PCMS, 2Arrow boards, F150
P/U
C Placing topsoil Sta. 22-33+00 +/- 1 M Cat skid steer loader
Traffic Control
Was Traffic Control Re 'd Today? Yes Was WZTC pera roved TCP? Yes
Comments:
Material Delivery
visual I InspMET ion
D_escri do Est. Q_ Unit per ROM/�QPL?
Tdcl Fiei/c 8-4-2016
I s ector's Signature Date
Re I y(Signature) Date
City of{h - INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 2 of 3
Onsite Testing
Yn/Out of
me Materiai i3escrii tion i_ocationlOffset Conformance
None
Diary
ime Discussion
7:OOam Finish paperwork from 8/3/16
8:OOam AGS is on-site and preparing to set T/C
Icon is preparing to continue at the SE corner of NE 6th St. Green City is placing topsoil in the median at St. 29
8:30am 33+00 +/-.
Icon continues to exc. for S/W at 6th, Green City continues to place topsoil in median. I have contacted Ken
concerning the use of multiple trucking companies; I stated that I will perform wage interviews but will not be
9:30am turning away any trucks, Icon will have to acquire the needed paperwork.
10:30am Work Continues
12:00pm Green City continues to place topsoil in the median, Icon continues to set grade at the SE corner of 6tn
Icon is relocating to the NW corner of NE 61h to begin removing concrete. Green City continues to place topsoil
in the median at Sta. 29-33+00 +/-.AGS is securing the SE corner of 6th and placing T/C for the work on the N
1:00pm corner.
1:30pm GS has placed T/C and Icon is removing cont.
Icon has finished for the day and AGS is removing T/C. AGS is having barrels delivered for the lane closures
3:OOpm during pavement repairs. I have reminded Jessie that they need to have lights on them.
3:30pm Work has finished for the day.
8/4/2016
Inspector's Signature Date
- . .�,,. � ,. sem"'.. -•�--
cq-
=A ,rye-'t "C/ .�,��� E • •
• Qi 4�+. �v t, ,-KS���ry�tiY � '�.-, '�•x q Yo-t.'''' .. .�.. $
1 'M' nfi x t • - • - •
14
Rt
- , !•< <t,,i hl 'mow . .
a � •
O /G1:12C;Cl