HomeMy WebLinkAboutInspector's Daily Reports - 8/3/2016 INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project �... <k Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 1 of 3 III I II II I III III III I I I IIII I III I IIII IIII I III IIII III II VIII III I II III VIII IIII OI II VIII IIII VIII IIII IIII a *03854 708-Inspector's Daily Reports 08/03/2016* •.e ednesday,August 3, 2016 0 , 6 OT- - Inspector: Todd Freih Inspector's Shift Hrs: 7:00am FTO 4:OOpm Weather: Time Temp Sky Time Temp Sky F-1 7:OOam 61 Cloudy Opm 75 Clear ID contract f,;> Reprosentative/Title 4 ID SContr�ctor Representat ve%T tle A Icon Materials Bill Johnson/Foreman F B AGS Jessie Dillard/TCS G C COR Pat Pearson/Foreman I D Able Industries Jared Robertson/Driver J E K Work Activity ID Descci titin Location° " Crew E' ul A Demo Multiple loc. 2M, 1F F450 U/T, F , JD 50D Exc., Ford F25 P/U B Traffic control All 2M, 1F 2PCMS, 2Arrow boards, F150 P/U. C Water Service Inst Median at Sta. 18-22+00 +/- 4M Kenworth D/T, Dodge 3500 U/T Ford F550 B/T, Komatsu 55MR mini exc., Case 580 B/H. D Hauling Mult. Loc. 1M Kenworth D/T Traffic Control Was Traffic Control Re 'd Today? Yes Was WZTC pera roved TCP? Comments: Material Delivery Visual lrrspeetion ®e_scri tion Est. Q-, Unit er ROM/�QPL? MMUM Todd 15,.IX 8-3-2016 ONE IN IWer's ature Date 3•Rature) Date INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 2 of 3 Onsite In/Out of irne Material Descri-tion Location/OfFset Conformance None ime Discussion 7:00am Finished documentation from 8/2/16 8:00am AGS is on-site preparing to place T/C. COR crews are scheduled to be on-site at 8:30am GS is placing T/C to shift traffic to the southbound lanes at the median Sta. 18-22+00+/-; This was being performed before placing signage. I have directed them to place signage before any lane sift is placed. CO 8:30am crews are on-site and preparing. Icon is waiting for T/C at Stn COR crews are performing the tie-in. Pat expressed concerns that there are no gas locates in the area; I have 9:00am talked to Bill and he stated that locates were performed this week.AGS has relocated to 9th to place T/C. George Stahl is on-site to confirm gas-locations with the COR crew; work has stopped until a determination is made. Work continues at 9th. Emergency locates have been ordered due to the locate company not locating the 10:00am gas. mal and PSE were on-site to confirm that no gas line was in the area and work has resumed on the water 10:30am service. Icon is relocating to 611 to continue with the removals. AGS is setting up T/C Icon has relocated to the SE corner of 6th and is preforming removals. COR crews are backfilling the exc. in the median and roadway.AGS is using 2 flaggers at this location due to the need to restrict 6th to one lane while work 11:30am is being performed. 12:30pm Work continues on 6th and at the median 1:00pm COR crews have finished for the day. Work at the SE corner of 6th continues. 2:30pm Removals are complete and Icon is exc. for grade and preparing to stabilize the PAR. 3:00pm Icon has finished for the day, AGS is removing T/C. 3:30pm ork has finished for the da Toric!fi-4 8/3/2016 Inspector's Signature Date �K; INSPECTOR'S DAILY REPORT rl Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 3 of 3 Subject: Irrigation Location: *' Sta. 18+22+00 +/- Comment: f a; COR crews are installing water service for the irrigation system. Subject: I Traffic Control _w Location: 4th & Duvall Comment: Traffic control is being placed for lane shift. a Subject: Concrete Removal Location: T SE corner of NE 6th St. .y w _ Comment: rico- AxE Icon continues to remove existing --•� t osuNiaE ped. Ramps. 5dW 15wX 8/3/2016 Inspector's Signature Date