HomeMy WebLinkAboutInspector's Daily Reports - 8/2/2016 R+„
CityINSPECTOR'S DAILY REPORT
Duvall Ave ISE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
II I-111 1111111 1NI 1111111111111111111111111111111111111A I 111A1 I 111111111I IIII Page of
Daily Information *03854 708-Inspector's Daily Reports 08/02/2016* UeSday,AU9USt 2, 2016
Date:
Inspector: Todd Freih Inspector's Shift Hrs: 7:OOam To 4:30pm
Weather: Time Temp Sky Time Temp Sky
7:OOam 60 Cloudy 4:OOpm 72 Cloudy
ID" Contractor , ,.: Representative/Title`. ID a Contractor' Representative/Title
A Icon Materials Jeff Price/Foreman F
B AGS Jessie Dillard/TCS G
C COR Pat Pearson/ Foreman I
D J
E K
Work Activity
ID Desci tion `" Location `� Cr'eiiv E`"uiV
A
B Traffic control All 2M, IF 2PCMS, 2Arrow boards, F150
P/U
C Water tie-in Sta. 29-33+00 +/-
'Traffic,Control
Was Traffic Control Re 'd Today? Yes Was WZTC per approved TCP?
Comments:
Material Delivery
visual Inspeet�ion
Desc_ri tion U. Q_ Unit per ROM/QPL?
jocld fi°ei/c 8-2-2016
Inspector's Signature Date
£3-
7-- Jt
Reviewed By(Signature) Date
r f
C;,,.,,� INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 2 of 3
�Onsite Testing
In/Out of
gime Material D_eseri ,tion �McazienhwfFset Conformance
None
fir,IT Discussion
7:00am Finished documentation from 8/1/16
8:00am AGS is on-site preparing to place T/C. COR crews are scheduled to be on-site at 8:30am
COR crews are on-site, AGS is taking the left turn lane at Sta. 29-33+00 +/-. Icon is performing removals at NE
8:30am Stn
9:00am COR crews have started to pothole for the water. Icon continues with removals at the N corner of Stn
COR crew has finished installing the water meter set and are removing their equipment. Icon continues work on
he N corner of NE 9th, setting grade for the walks. I have directed them to slope the edge of the excavation next
10:00am to the road.
Icon has uncovered an existing drainage pipe behind the walk on the N corner of 9th; it consists of a 4" pert pipe.
10:30am This is not shown on any of the prints and serves little purpose.
Bill stated that Icon will place topsoil in the median at Sta. 29-33+00 +/- on behalf of Green City due to safe
11:30am concerns.AGS is preparing to provide traffic control for this work.
12:30 m Icon has delivered and is placing the first load of topsoil in the median at Sta. 28-33+00 +/-
he second and third loads have been unloaded and Icon is placing the soil. AGS is providing flaggers during
1:30 m the unloading.
Bill stated that the final truck has broken down and they are finished adding soil for the day.AGS is closing down
2:30 m the area around the median.
3:00 m Icon has finished for the day.AGS is removing T/C.
:00 m AGS is finished for the day.
Tcld fiei/c 8-2-2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 3 of 3
Rx+y
Subject:
,L Irrigation
Location:
Sta. 31+00 +/-
Comment:
COR crews are potholing for the water
tie-in.
r Subject:
f '
Removals
i
Location:
N side of NE 9th
Comment:
h Icon is finishing the removal of SM &
°r gym; C/G.
Note: 4" pert pipe uncover during this
4
process/
Subject: Median
Location:
Sta. 29-33+00+/-
Comment:
Icon is placing topsoil in the median
due to safety concerns.
F
Y �j
�
Uq.:.
a'.y t � w ,s.w.•"'1�'- fty1fr Iv`'; l n{ p5(s:y 2`
fs1J 11�ggK _
FOA, 8/2/2016
Inspector's Signature Date