Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/2/2016 R+„ CityINSPECTOR'S DAILY REPORT Duvall Ave ISE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) II I-111 1111111 1NI 1111111111111111111111111111111111111A I 111A1 I 111111111I IIII Page of Daily Information *03854 708-Inspector's Daily Reports 08/02/2016* UeSday,AU9USt 2, 2016 Date: Inspector: Todd Freih Inspector's Shift Hrs: 7:OOam To 4:30pm Weather: Time Temp Sky Time Temp Sky 7:OOam 60 Cloudy 4:OOpm 72 Cloudy ID" Contractor , ,.: Representative/Title`. ID a Contractor' Representative/Title A Icon Materials Jeff Price/Foreman F B AGS Jessie Dillard/TCS G C COR Pat Pearson/ Foreman I D J E K Work Activity ID Desci tion `" Location `� Cr'eiiv E`"uiV A B Traffic control All 2M, IF 2PCMS, 2Arrow boards, F150 P/U C Water tie-in Sta. 29-33+00 +/- 'Traffic,Control Was Traffic Control Re 'd Today? Yes Was WZTC per approved TCP? Comments: Material Delivery visual Inspeet�ion Desc_ri tion U. Q_ Unit per ROM/QPL? jocld fi°ei/c 8-2-2016 Inspector's Signature Date £3- 7-- Jt Reviewed By(Signature) Date r f C;,,.,,� INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 2 of 3 �Onsite Testing In/Out of gime Material D_eseri ,tion �McazienhwfFset Conformance None fir,IT Discussion 7:00am Finished documentation from 8/1/16 8:00am AGS is on-site preparing to place T/C. COR crews are scheduled to be on-site at 8:30am COR crews are on-site, AGS is taking the left turn lane at Sta. 29-33+00 +/-. Icon is performing removals at NE 8:30am Stn 9:00am COR crews have started to pothole for the water. Icon continues with removals at the N corner of Stn COR crew has finished installing the water meter set and are removing their equipment. Icon continues work on he N corner of NE 9th, setting grade for the walks. I have directed them to slope the edge of the excavation next 10:00am to the road. Icon has uncovered an existing drainage pipe behind the walk on the N corner of 9th; it consists of a 4" pert pipe. 10:30am This is not shown on any of the prints and serves little purpose. Bill stated that Icon will place topsoil in the median at Sta. 29-33+00 +/- on behalf of Green City due to safe 11:30am concerns.AGS is preparing to provide traffic control for this work. 12:30 m Icon has delivered and is placing the first load of topsoil in the median at Sta. 28-33+00 +/- he second and third loads have been unloaded and Icon is placing the soil. AGS is providing flaggers during 1:30 m the unloading. Bill stated that the final truck has broken down and they are finished adding soil for the day.AGS is closing down 2:30 m the area around the median. 3:00 m Icon has finished for the day.AGS is removing T/C. :00 m AGS is finished for the day. Tcld fiei/c 8-2-2016 Inspector's Signature Date INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 3 of 3 Rx+y Subject: ,L Irrigation Location: Sta. 31+00 +/- Comment: COR crews are potholing for the water tie-in. r Subject: f ' Removals i Location: N side of NE 9th Comment: h Icon is finishing the removal of SM & °r gym; C/G. Note: 4" pert pipe uncover during this 4 process/ Subject: Median Location: Sta. 29-33+00+/- Comment: Icon is placing topsoil in the median due to safety concerns. F Y �j � Uq.:. a'.y t � w ,s.w.•"'1�'- fty1fr Iv`'; l n{ p5(s:y 2` fs1J 11�ggK _ FOA, 8/2/2016 Inspector's Signature Date