HomeMy WebLinkAboutInspector's Daily Reports - 8/1/2016 Gtvof,; INSPECTOR'S DAILY REPORT
r`` '[' �1 Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 1 of 3
II IIIIII I II IIIIIII II IIIIIII I II II II III I III I �I III III II
�' • • `03854 708-Inspector's Daily Reports 08/01/2016" ffM7=day,August 1, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 5:00pm
Weather: Time Temp Sky Time Temp Sky
7:00am 57 Cloudy 4:30pm 75 Clear
ID; Contractor= Rep res ehtativeTitle'gin: ID ` Contractor ;Representative/Title.
A Icon Materials Jeff Price/Foreman F
E
Icon
Jessie Dillard/TCS G
C O'Bunko Clint Air/Surveyer I
D Green City Jesus Garnica/Foreman J
E K
Work
1D . Descri Location Crew ' E ui
A Concrete Removal NE 9th, 2M,1 F JD 50D exc., loader, F550 U/T
B AGS- Traffic control 2M, 1F F150 P/U
C Survey NE8th 1M Chev. P/U
D Soil Placement Median/ 18-22+00 +/- 1M Ford F450 U/T, Cat skid steer
loader.
Traffic Control
Was Traffic Control Re 'd Today? Yes Was WZTC per approved TCP?
Comments:
Material Delivery Inspection
Descri tion Est. Q Unit per ROM/LQPL?
Tdd/;,vJ 8-1-2016
Inspector's Signature Date
I'S • � �to
eviewed By(Signature) Date
« Gt,orf INSPECTOR'S DAILY REPORT
^ � Duvall Ave NE Pavement Preservation Project
t(b, T11 1.
-� ✓ Contract#CAG-16-004, Fed Aid No:STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/hut of
ime Material Descri tion Location/Offset Conformance
None — --- ---- -
Mme Discussion
7:00am Completed paperwork from last week, created file on H-Drive for project
8:00am AGS is on-site beginning to place T/C, Icon is on-site preparing for the da
8:30am Icon is removing SM and C/G at the S corner of Stn
I have met with Greg Seegmiller to review the water tie in requirements for tomorrow; he stated that the crews
ill be on-site at 8:30am. Topsoil is being delivered and placed in the median at Sta. 18+00-21+00. Green Cit
9:30am is on-site to place material.
Work continues at 9th. Green City is spreading the topsoil in the median, AGS is making corrections to the T/C,
10:30am O'Bunko is on-site at NE 6tn
11:30am Work Continues
Green City is close to finishing the topsoil in the S median, work continues on the S corner of 9th. I have spoken
o Bill about the COR crews schedule to install water in the N median and asked if he plans to place topsoil. He
12:30pm will verify with Green City.
Icon has finished with the removals and stabilization on the S corner of 9th and have relocated to the N side o
1:30pm the intersection.
2:30pm Green City has received their last load for the day. Work continues on the N corner of Stn
3:00pm 11con has finished for the day and AGS is removing T/C.
:00pm AGS has finished for the day.
8-1-2016
Inspector's Signature Date
�0 WNE-1
gz, Concrete Removal
+...+•y`. ' c .n.,,yLY rc{Ilg'��'�`?Y•. ga'.^.i`j'�v.''.f .`�t3�� .�. +•'
S corner of NE 9th
Icon is removing the existing ped ramp at NE
72
91th.,T/C was not correct at this time.
09/01/2016
} • -
Topsoil
L y
J Location:
Z •
Green City is placing topsoil.
Survey
zF
sib
SW cornerof 6th
fY „g t3 k and ! .:! • ,
O'Bunko is preforming • placement
of new ped ramps.