Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 8/1/2016 Gtvof,; INSPECTOR'S DAILY REPORT r`` '[' �1 Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 3 II IIIIII I II IIIIIII II IIIIIII I II II II III I III I �I III III II �' • • `03854 708-Inspector's Daily Reports 08/01/2016" ffM7=day,August 1, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:00am To 5:00pm Weather: Time Temp Sky Time Temp Sky 7:00am 57 Cloudy 4:30pm 75 Clear ID; Contractor= Rep res ehtativeTitle'gin: ID ` Contractor ;Representative/Title. A Icon Materials Jeff Price/Foreman F E Icon Jessie Dillard/TCS G C O'Bunko Clint Air/Surveyer I D Green City Jesus Garnica/Foreman J E K Work 1D . Descri Location Crew ' E ui A Concrete Removal NE 9th, 2M,1 F JD 50D exc., loader, F550 U/T B AGS- Traffic control 2M, 1F F150 P/U C Survey NE8th 1M Chev. P/U D Soil Placement Median/ 18-22+00 +/- 1M Ford F450 U/T, Cat skid steer loader. Traffic Control Was Traffic Control Re 'd Today? Yes Was WZTC per approved TCP? Comments: Material Delivery Inspection Descri tion Est. Q Unit per ROM/LQPL? Tdd/;,vJ 8-1-2016 Inspector's Signature Date I'S • � �to eviewed By(Signature) Date « Gt,orf INSPECTOR'S DAILY REPORT ^ � Duvall Ave NE Pavement Preservation Project t(b, T11 1. -� ✓ Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 2 of 3 Onsite Testing In/hut of ime Material Descri tion Location/Offset Conformance None — --- ---- - Mme Discussion 7:00am Completed paperwork from last week, created file on H-Drive for project 8:00am AGS is on-site beginning to place T/C, Icon is on-site preparing for the da 8:30am Icon is removing SM and C/G at the S corner of Stn I have met with Greg Seegmiller to review the water tie in requirements for tomorrow; he stated that the crews ill be on-site at 8:30am. Topsoil is being delivered and placed in the median at Sta. 18+00-21+00. Green Cit 9:30am is on-site to place material. Work continues at 9th. Green City is spreading the topsoil in the median, AGS is making corrections to the T/C, 10:30am O'Bunko is on-site at NE 6tn 11:30am Work Continues Green City is close to finishing the topsoil in the S median, work continues on the S corner of 9th. I have spoken o Bill about the COR crews schedule to install water in the N median and asked if he plans to place topsoil. He 12:30pm will verify with Green City. Icon has finished with the removals and stabilization on the S corner of 9th and have relocated to the N side o 1:30pm the intersection. 2:30pm Green City has received their last load for the day. Work continues on the N corner of Stn 3:00pm 11con has finished for the day and AGS is removing T/C. :00pm AGS has finished for the day. 8-1-2016 Inspector's Signature Date �0 WNE-1 gz, Concrete Removal +...+•y`. ' c .n.,,yLY rc{Ilg'��'�`?Y•. ga'.^.i`j'�v.''.f .`�t3�� .�. +•' S corner of NE 9th Icon is removing the existing ped ramp at NE 72 91th.,T/C was not correct at this time. 09/01/2016 } • - Topsoil L y J Location: Z • Green City is placing topsoil. Survey zF sib SW cornerof 6th fY „g t3 k and ! .:! • , O'Bunko is preforming • placement of new ped ramps.