HomeMy WebLinkAboutInspector's Daily Reports - 10/12/2016 t f ® INSPECTOR'S DAILY REPORT — ` Duvall Ave NE Pavement Preservation Project <� Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 1 of 3 ��I�����III�II��I�II�I�I�I�IIIII�II����II�I���IIII��I���II���II�IIII�I�III�I�I��IIIIII�II�I���I�III����III��I W. - 54 708-Inspector's Daily Reports 10/12/2016` ednesday, October 12, 16 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To Weather: Time Temp Sky Time Temp Sky 7:30am 39 Clear ID Contractor Represeritative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F -...._ - -- -----.............................................._...--- .....----- - B AGS Marla Dawson/TCS G -- -...---.._.._....._...._._................----........................---.._.... ------- __._._...-- - -........._........._.........._....__..._.........—.._......._.._........_... —---- C Cascade Utilities Ken Mann/Owner I D J ---- -........._....................................._.................................._..._._......................- -- -----............................_....._...................._..................._.._............_......_..._._...._........_.....---......................_................................................_... _.._ E K Work Activity ID Description Location Crew Equip A B C Traffic Control Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP? .._..........._...................._.._.— .........._..................---- --- - --- --..._.__...__...._..__...............------- Comments: visual Insoil —01Pe- ion I)escr�iption4EstQt Unit per ROM/4�u�? Tcicl fi°ei/c 10/12/2016 Inspector's Signature Date 2� p 1 vi By (Signature) Dat l:rtpu!': INSPECTOR'S DAILY REPORT4i Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite - In/OIII ffi i�Tffl me Material Descri.tion LocationlOffset��lllllllllI Conorce ll None iIT Discussion 7:30am GS is on-site preparing-for the day. - ----._.._......__..__....._.-.......... --- ----._..................................__......_................._......._......_._..........._................_.._.._...__.._-..._..._........_.._..-----....-.-.....-........----.......-�— Icon is on-site, Cascade is on-site preparing to place sealant around the utilities and remove old castings from 8:30am the site. 9:00am Cascade is placing AR4000 beginning at Sta. 47+00L +/-. 10:00am Cascade has finished all the structures in the southbound lanes and are beginning work in the northbound_lanes. 10:30am Icon is replacing RPMs removed during utility adjustments, AGS is providing T/C. 11:30amII work has finished. --.....__........................................................................................................................................................... Tdd fi�ei/c 10/12/2016 Inspector's Signature Date ' p ®Gtv of INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 f' Subject: Utility Adjustment Location: Sta. 47+OOL +/- Comment: Cascade is applying sealer to the adjustments. Subject: yi Utility Adjustments q < Location: - 30+OOR +/- Comment: Cascade is removing old castings from the site Subject: RPMs - — sw�ni 25 Location: N E 6th St. - Comment: 16612/2616 Icon is replacing the center line at 6th Todd 15-4a 10/12/2016 Inspector's Signature Date