HomeMy WebLinkAboutInspector's Daily Reports - 10/7/2016 INSPECTOR'S DAILY REPORT woon— r% Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) II IIIA I II I IIIIII I IIIIII I II III III IIIIII III II I IIIIII IIIIIIII Page 1 of 3 - - `03854 708-Inspector's Daily Reports 10/07/2016` i- Friday, October 7, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:00pm Weather: Time Temp Sky Time Temp Sky 7:30am 52 Cloudy 3:00pm 62 Ptly Cldy ri ID Contractor Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ...........-._...._..........._....__........_..--...................................-.......__..-_........._.._..--...__..-._..--__.._._.... ----..... . . .. . . . . . .. . . ........ _.-_.............................._........................................._..-----.-._.._..-- B AGS Marla Dawson/TCS G. ......................... --- - ---......_..--.--- __...__...._......._....................._......................_...__...._..._._...-._......._....-...........-....................... . ....-----...... _.._.................. __........................ ........ _.._.......... .._......_........_.._...._._...._................._.._..__._.............. _..... ._.._....._... C Cascade Utilities Ken Mann/Owner 1 _..._..._.._._. __._._...---.._........... --.._.....__..._.__._...__.._.........._._..._...._._._--.._..._.__._.-._.......... ... --- ------ -.._—...---------- D Green City Frank Falanico/Owner J _... ------....---...........---...._._...............-................--............................_.................................................................................--..................-......... ............._..................._.._......_...---_.._._........--...........----.........................._....................................................................................................... _.. E K 'Work,Activity ID Description ;Location f Crew Equip A Contractor support and All 1 M F250 P/U removing tack at Sunset B Traffic control 2FA M F150 P/U C Adjusting utilities 3M 3 F450 U/T, JD skid steer loader D Performing restorations. NE 6th St. and NE 8th St 2M Ford F450 U/T Traffic Control - as Traffic Control Req d Today? Yes WasWZTC per approved TCP? YES Comments: Material Delivery visual INspection Dese tion Est. Qt Unit per ROM/QPL? Todd 61614 10/7/2016 Inspector's Signature Date b/1 I iewed By (Signature) Date .<< INSPECTOR'S DAILY REPORT, tit 1 Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material f]escri�tion Location/Offset Conformance None ........................................................_........._..................................._.......................................................................................................................................................................................................................... ime Discussion 7:30am _Finished paperwork from 10/6/16 and spoke with Green City about the needed property restorations. _..- ------- ............ -------- GS and Icon are on-site preparing for the day. G/C is performing restorations at NE 8th; all of the sprinkler heads are in place. One of the heads is missing a nozzle and on needs to be added next to the ped. ramp on the west 8:00am side at 7th. Icon has removed the backhoe from the site. _ _. — — -- -- ._..._—......_.._.............._......_...._.._._............--.—..__.._... ---._....._.._....------- GS has taken the left lane at Sta. 31+50 +/- to establish a clear zone for Cascade. Cascade has begun to 8:30am excavate utilities. ..........................._........... ._..................................................................................._........_........_...._....................................._................................._.............._................_...................._....._._..._...._........................................._.._..._.._..........................................---......................_............._......................._............-....................... _._ Cascade continues at Sta. 31+50, G/C continues at 7th. 9:45am; G/C has relocated to the NW corner of NE 61h to continue restoring the irrigation system. Sod is needed at this location and on the SW corner. Seed has been 9:3.0_amlaced on the SE corner of 6th. - --- __.._.._..............__.._..__.._.._....__.... - - ---------..__.._............---.._.__...__.._..._..._._..._...__.._..- ..._.................._...................__..._...................._..._..__..._._. —- - Cascade has a load of HMA on-site for the excavations. G/C continues to restore the irrigation on the NW corner at 61h. When the system was stabilized for construction it was done so in a manner that has made it difficult to restore. Cascade is filling the last exc. with HMA and will finish for the day. They intend to return next week to 10:30am a I sealant and remove the old castin s from the site. .............................................P._..Y..............._.............................................................................................................-..........._................9..........................................................._........................................................................................................................................................................._..._......_.....----._.........................................._............ 11:00am AGS is removing all of the staged T/C from Duvall. GS continues to remove T/C devices from Duvall. G/C has finished restoring the irrigation system at the NW 12:OOp_m......orner of 6th and are restoring the._.`g.rass areas................................._.._..._......_._.._._...._.._.._..................._............_...............................................__......._........................_..-----....._.__..__..-...__._...__......_.._.....-- 12:30pm G/C has gone off-site to acquire sod to complete restorations. 1:30pm G/C is back on-site and are placing sod. :30 mm G/C has finished placing sod and are cleaning the affected areas. (6_5Hrs, 2M F150) _ _ Work on this job is complete until notified_by Icon for corrections Todd fi°ei/c 10/7/2016 Inspector's Signature Date p ®Chi of INSPECTOR'S DAILY REPORT 02 �,;� Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3. �35, Subject: Property Restoration Location: ' NE 8th St. 1 -- l L l`. Comment: Green City is making repairs to the irrigation system. Subject: Utility Adjustment Location: 6_ Sta. 31+50 R +/- t Comment: Cascade is making the final utility '77777" adjustment. Subject: - _ Property Restoration d- " Location: - NW corner of 6th St Comment: Green City is repairing the irrigation system. 10/7/2016 Inspector's Signature Date