- - `03854 708-Inspector's Daily Reports 10/07/2016` i- Friday, October 7, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:00pm
Weather: Time Temp Sky Time Temp Sky
7:30am 52 Cloudy 3:00pm 62 Ptly Cldy
ri
ID Contractor Representative/Title ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
...........-._...._..........._....__........_..--...................................-.......__..-_........._.._..--...__..-._..--__.._._.... ----..... . . .. . . . . . .. . . ........
_.-_.............................._........................................._..-----.-._.._..--
B AGS Marla Dawson/TCS G. .........................
--- - ---......_..--.--- __...__...._......._....................._......................_...__...._..._._...-._......._....-...........-....................... .
....-----......
_.._..................
__........................
........
_.._..........
.._......_........_.._...._._...._................._.._..__._..............
_.....
._.._....._...
C Cascade Utilities Ken Mann/Owner 1
_..._..._.._._. __._._...---.._........... --.._.....__..._.__._...__.._.........._._..._...._._._--.._..._.__._.-._.......... ... --- ------ -.._—...----------
D Green City Frank Falanico/Owner J
_... ------....---...........---...._._...............-................--............................_.................................................................................--..................-......... ............._..................._.._......_...---_.._._........--...........----.........................._.......................................................................................................
_..
E K
'Work,Activity
ID Description ;Location f Crew Equip
A Contractor support and All 1 M F250 P/U
removing tack at Sunset
B Traffic control 2FA M F150 P/U
C Adjusting utilities 3M 3 F450 U/T, JD skid steer
loader
D Performing restorations. NE 6th St. and NE 8th St 2M Ford F450 U/T
Traffic Control
- as Traffic Control Req d Today? Yes WasWZTC per approved TCP? YES
Comments:
Material Delivery
visual INspection
Dese tion Est. Qt Unit per ROM/QPL?
Todd 61614 10/7/2016
Inspector's Signature Date
b/1 I
iewed By (Signature) Date
.<< INSPECTOR'S DAILY REPORT,
tit 1 Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
ime Material f]escri�tion Location/Offset Conformance
None
........................................................_........._..................................._..........................................................................................................................................................................................................................
ime Discussion
7:30am _Finished paperwork from 10/6/16 and spoke with Green City about the needed property restorations.
_..- ------- ............ --------
GS and Icon are on-site preparing for the day. G/C is performing restorations at NE 8th; all of the sprinkler heads
are in place. One of the heads is missing a nozzle and on needs to be added next to the ped. ramp on the west
8:00am side at 7th. Icon has removed the backhoe from the site.
_ _. — — -- -- ._..._—......_.._.............._......_...._.._._............--.—..__.._... ---._....._.._....-------
GS has taken the left lane at Sta. 31+50 +/- to establish a clear zone for Cascade. Cascade has begun to
8:30am excavate utilities.
..........................._........... ._..................................................................................._........_........_...._....................................._................................._.............._................_...................._....._._..._...._........................................._.._..._.._..........................................---......................_............._......................._............-.......................
_._
Cascade continues at Sta. 31+50, G/C continues at 7th. 9:45am; G/C has relocated to the NW corner of NE 61h
to continue restoring the irrigation system. Sod is needed at this location and on the SW corner. Seed has been
9:3.0_amlaced on the SE corner of 6th.
- --- __.._.._..............__.._..__.._.._....__.... - - ---------..__.._............---.._.__...__.._..._..._._..._...__.._..- ..._.................._...................__..._...................._..._..__..._._. —- -
Cascade has a load of HMA on-site for the excavations. G/C continues to restore the irrigation on the NW corner
at 61h. When the system was stabilized for construction it was done so in a manner that has made it difficult to
restore. Cascade is filling the last exc. with HMA and will finish for the day. They intend to return next week to
10:30am a I sealant and remove the old castin s from the site.
.............................................P._..Y..............._.............................................................................................................-..........._................9..........................................................._........................................................................................................................................................................._..._......_.....----._.........................................._............
11:00am AGS is removing all of the staged T/C from Duvall.
GS continues to remove T/C devices from Duvall. G/C has finished restoring the irrigation system at the NW
12:OOp_m......orner of 6th and are restoring the._.`g.rass areas................................._.._..._......_._.._._...._.._.._..................._............_...............................................__......._........................_..-----....._.__..__..-...__._...__......_.._.....--
12:30pm G/C has gone off-site to acquire sod to complete restorations.
1:30pm G/C is back on-site and are placing sod.
:30 mm G/C has finished placing sod and are cleaning the affected areas. (6_5Hrs, 2M F150) _ _
Work on this job is complete until notified_by Icon for corrections
Todd fi°ei/c 10/7/2016
Inspector's Signature Date
p ®Chi of INSPECTOR'S DAILY REPORT
02 �,;� Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3.
�35, Subject:
Property Restoration
Location:
' NE 8th St.
1 --
l
L
l`.
Comment:
Green City is making repairs to the
irrigation system.
Subject:
Utility Adjustment
Location:
6_ Sta. 31+50 R +/-
t
Comment:
Cascade is making the final utility
'77777"
adjustment.
Subject:
- _ Property Restoration
d- " Location:
- NW corner of 6th St
Comment:
Green City is repairing the irrigation
system.
10/7/2016