Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 10/6/2016 ��;,,.,��:=-� INSPECTOR'S DAILY REPORT {® Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) II IIII II II I III II II III I II II III I II II III I I III III II Page 1 of 3 - *03854 708-Inspector's Daily Reports 10/06/2016* hursday, October 6, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To Weather- Time Temp Sky Time Temp Sky 7:30am 52 Cloudy ID Contractor RepresentativelTitle ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F .............................-....----.-...--- -...........— ---------------._...__....._..............................._.............................. ......_............................_.._..------.................__._._._._........._....__—._---.......................-._.._.._._....._------- B AGS Marla Dawson/TCS G - - ...... - ._......._._...._�.--- -._...... ..... _..__............................ ...._................................. .................................._._................._...........__._..._.__.........._........_.._..............._._...- ---------.................._..._...... C Cascade Utilities Ken Mann/Owner I 15-- — — it--it—y . _------...-. ....--6----------_- — D Green City Frank Falanico/Owner J ........._E........_._._._..__..._.._........................................_.......__..._......_...._..._............_._..-....__.._......................_........................_........_...._...._.........._....._._.... ...._...K.............._.._.._..............................__._..-....._....__.._..._......-....................................................-....................._................................._......_.. Work Activity ID Description Location I Crew Equip A Contractor support and All 2M F250 P/U, JD310 backhoe. removing tack at Sunset B Traffic control 3F, IM F150 P/U C Adjusting utilities 6M 3 F450 U/T, JD skid steer loader D Maintaining Plantings NE 6th St., Median at Sta. 18- 2M Ford U/T and performing 22+00. 8th St, and 9th St. restorations. Traffic Control Was Traffic Control Re 'd Tod. ? Yes Was WZTC era roved TCP? Yes _._............_..._.........._._...._......_. . _... ...__.9...................._.............Y....__........_._.__..._.._... --- ............_..._... --..._......._...._......_...._..._............................_......__._...........P........ PP_ . . . .. ......................................................_.........----............_................................. Comments: Delivery Inspection Qe_scription Esti Qty Unit per ROM/AQPL? Todd fi�ei/c 10/6/2016 X Signature Date U LI L4 R levee y (Signature) batd ® > INSPECTOR'S DAILY REPOR Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 �Onsite Testing In/Out of ime Material Rog tion LocationiOffset Conformance None Diary ime Discussion 7:30am Finished paperwork from 10/5/16. ----.._.__.._.._-.......-......... ...-..._... - --._...._.._..---------------- ..._..._.... _ ------- AGS has placed T/C at the corner of NE 9th St and Cascade is preparing to exc. the valves on 9th. This work has 8:OOam no impact on Duvall traffic. ..........................................._.._................... _.........._........_...._........---.._..__......................._...._..---..._.....-_...._.-..................-.....-.-..--........................_..._.._—.._.........................._..._._.._........-...-...._...._................................................._.... Cascade has relocated to Sta. 12+50R+/-to exc. the valves located in front of the driveway. AGS has closed the curb lane and driveway at this location. Green City is on-site to finish installation of sod and irrigation repairs. I have also directed them to place bark at 9th and blend in the edge of our restorations on the SE corner of 6th. G/C has started their work at the s end of the median at Sta. 18+01 to adjust sprinkler heads and replace plants 9:OOam that have died due to lack of water. (This work is not on F/A and should have been performed during installation_) ..._.........._.._..._.._.....-....-......._.._......_....._..._.._.._....._. _._. —.. Cascade is placing HMA in the exc. at Sta. 12+50R and continuing exc.at Sta. 16+50R +/-. G/C continues to 1.0:OOa.m...perform work in the median at Sta....._18+01-22+00........_.....-........._..........................._...._._....---._...----- __.__....--........---..........................................._.._.......-...._...-.-._..__._._.._...----._....--- I have placed a call to John Kalmbach and left a message requesting 3 of the Renton castings for Cascade. 10:30am Jason Grant is not in today_ _ Cascade has relocated to Sta. 22+75 to continue exc. structures and are placing concrete rings on valves at Sta. 16+OOR +/-. G/C continues to perform work in the median. COR crews have delivered the castings that Cascade 11.00am requested. -- --- ..._..----...- ......---.._._...-..._..._....................-.-.....-......................._..._..-........---...._..----- - --....................-...................................---- -- Cascade has relocated to Sta. 27+50R to continue exc. G/C has relocated to the median at Sta. 29+50-33+00 12:00.p_m..+�.-:........_.._......_................ 1:OOpm._....._......_ork continues ._._.._.._......_.-...._._.............._.._..................-. -- -----.............._....-....._ p ---- --- ---- ( --._..._.........._..-------- G/C has relocated to the SE corner of 91h to lace bark on the restored area. F/A) Cascade has relocated to :00 m Sta.28+00 +/-and continue to exc. structures. ....................P............................-....................._.._.........._....._......_......_..._........_......................-...................................................._............._...._._.__...__._..............._...._......- ......_._.._......_........................_........._.....-- .........................._..._.._.-.._...._....... ....__..-.._.._........................_..-.. 3:OOpm G/C is finishing at 91h and are going to relocate to the east side at 7th. Cascade continues at Sta. 30+75R +/- Cascade has informed me that they will have to return to complete the last structure tomorrow due to the proximity of the structures to the center of the lane and the need to move traffic to the curb lane. Green City is off-site.(2 .:OO.pm..-.....1./2hrs. --._.......................... :30pm Cascade has received another load of HMA and are placing it in the excavations. 5:00 m Cascade continues lacin HMA at Sta. 30+75R +/-. P........................................._....._....._................................-..._....P......................9.......................................-_........................................_................................._..._....................._........._..........................................._............................_..............................__.._........._...------._....__...._....------............_...--- :15pm GS is removing T/C and are finishing fir the day. __ /////6// - -..._............ —.. ._.._..................--._........_....... ----._._....--- ---- __. MH; ///6/// 7-aaW/5-/X 10/6/2016 Inspector's Signature Date �Gwor INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 �k Subject: Utility Adjustment Location: Sta. 12+50R +/- Comment: Cascade is excavating the utilities. Subject: x`F Landscaping Location: Sta. 18+01 +/- Comment: Green City is adjusting the irrigation and replacing dead plants. `- • '� Subject: Tack Removal d t F 4k Location: --'— ; - Duval at Sunset — `"� -- Comment: x E Icon is removing the tack deposits in the left turn lane rodd f�`e/% 10/6/2016 Inspector's Signature Date