HomeMy WebLinkAboutInspector's Daily Reports - 10/5/2016 ' c;,,.,,ifi INSPECTOR'S DAILY REPORT
6 f.
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIII��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIII IIIIIII IIIIII�IIIIIIIII IIIIIIIIIIIIIIIII Page 1 of
• r *03854 708-Inspector's Daily Reports 10/05/2016*
••- ednesday, October 5, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:30pm
Weather: Time Temp Sky Time Temp Sky
7:30am 52 Cldy/Lt. Rain 3:00pm 66 Ptly Cldy
ID Contractor Represeritative/Title 1D `Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
-"--6...._._...----- ------._._._..-------...... -..._._.._.._._...._.........._...-..........._........................_...._..----....._..--- --- ------ ...................
AGS Marla Dawson/TCS G
C Cascade Utilities Rick Cancil/Supt I
D J
E K
Work Activity
ID Description Location f Crew Equip
A Contractor support All 1 M F250 P/U, JD310 backhoe.
B Traffic control 3F, 1M F150 P/U
C Adjusting utilities 5M 3 F450 U/T, Bobcat skid steer
loader
Traffic Control
Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP? Yes
Comments:
isl Inspection
Descri tion Est. Qt ; Unit per ROM/qPl?
Tadd Fiei/C 10/5/2016
nspector's Signature . Date
- 101 b1
IkOewed By (Signature) Date
INSPECTOR'S DAILY REPORT
ST- ` "` ' Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
ime Material Descri�tion Location/Offset Conformance
None
Diary
ime Discussion
7:30am AGS is stages equipment.
8:30am GS is re grin to close the southbound center lane.
................................._............................................ .._P.................9........................................_......................................................................................................................._..................................................................._............._._.._...._..._......... ..._..
9:00am Cascade has started to excavate the structure at Sta.38+OOL +/-
10:00am Cascade continues And Icon is removing
22 the damaged panel in the ramp on the SW corner of NE 8th St.
_......_.._. —.._..._.._..._......................_..__.._.......... ............................. .............
Cascade has repositioned to Sta. +50L +/-. Cascade is adjusting a catch basin on the SE corner of 6th. AGS
11:00am is placing T/C at Sunset to allow Icon to begin removing the tack from the northbound left turn lane.
12:00pmCascade continues at Sta. 22+50R with the catch basin. Icon is removing tack from the turn lane at Sunset.
1.30pm Cascade is placing HMA in excavations
2:30pm Cascade has finished placing HMA and are finished for the day. _
3_00pm GS is removing most of the T/C where possible___
3:30 m� GS is removing the last of the T/C and are finished for the day.
Tdd/5-14 10/5/2016
Inspector's Signature Date
Citvof -, INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
Subject:
Utility Adjustments
} 1
w .
Location:
g_ Sta. 37+OOL +/-
r Comment:
- Cascade is excavating the
manhole for adjustment
.9,20 p
i.. _
Subject:
Ped Ramp
- Location:
Sta. 36+12, 43.54L +/-
Comment:
- r Icon has removed the damaged
panel.
Subject:
Till{
Utility Adjustment
Location:
��tx Sta. 23+40R +/-
Comment:
Picture shows concrete rings for
valve cans.
11 OG OHS ro
?r
Tad/-5,&A 10/5/2016
Inspector's Signature Date