HomeMy WebLinkAboutInspector's Daily Reports - 10/5/2016 ' c;,,.,,ifi INSPECTOR'S DAILY REPORT 6 f. Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIII��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIII IIIIIII IIIIII�IIIIIIIII IIIIIIIIIIIIIIIII Page 1 of • r *03854 708-Inspector's Daily Reports 10/05/2016* ••- ednesday, October 5, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 52 Cldy/Lt. Rain 3:00pm 66 Ptly Cldy ID Contractor Represeritative/Title 1D `Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F -"--6...._._...----- ------._._._..-------...... -..._._.._.._._...._.........._...-..........._........................_...._..----....._..--- --- ------ ................... AGS Marla Dawson/TCS G C Cascade Utilities Rick Cancil/Supt I D J E K Work Activity ID Description Location f Crew Equip A Contractor support All 1 M F250 P/U, JD310 backhoe. B Traffic control 3F, 1M F150 P/U C Adjusting utilities 5M 3 F450 U/T, Bobcat skid steer loader Traffic Control Was Traffic Control Req'd Today? Yes Was WZTC per approved TCP? Yes Comments: isl Inspection Descri tion Est. Qt ; Unit per ROM/qPl? Tadd Fiei/C 10/5/2016 nspector's Signature . Date - 101 b1 IkOewed By (Signature) Date INSPECTOR'S DAILY REPORT ST- ` "` ' Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material Descri�tion Location/Offset Conformance None Diary ime Discussion 7:30am AGS is stages equipment. 8:30am GS is re grin to close the southbound center lane. ................................._............................................ .._P.................9........................................_......................................................................................................................._..................................................................._............._._.._...._..._......... ..._.. 9:00am Cascade has started to excavate the structure at Sta.38+OOL +/- 10:00am Cascade continues And Icon is removing 22 the damaged panel in the ramp on the SW corner of NE 8th St. _......_.._. —.._..._.._..._......................_..__.._.......... ............................. ............. Cascade has repositioned to Sta. +50L +/-. Cascade is adjusting a catch basin on the SE corner of 6th. AGS 11:00am is placing T/C at Sunset to allow Icon to begin removing the tack from the northbound left turn lane. 12:00pmCascade continues at Sta. 22+50R with the catch basin. Icon is removing tack from the turn lane at Sunset. 1.30pm Cascade is placing HMA in excavations 2:30pm Cascade has finished placing HMA and are finished for the day. _ 3_00pm GS is removing most of the T/C where possible___ 3:30 m� GS is removing the last of the T/C and are finished for the day. Tdd/5-14 10/5/2016 Inspector's Signature Date Citvof -, INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: Utility Adjustments } 1 w . Location: g_ Sta. 37+OOL +/- r Comment: - Cascade is excavating the manhole for adjustment .9,20 p i.. _ Subject: Ped Ramp - Location: Sta. 36+12, 43.54L +/- Comment: - r Icon has removed the damaged panel. Subject: Till{ Utility Adjustment Location: ��tx Sta. 23+40R +/- Comment: Picture shows concrete rings for valve cans. 11 OG OHS ro ?r Tad/-5,&A 10/5/2016 Inspector's Signature Date