Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 10/4/2016 INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillllllllllllllllllllllllllllllllllllllll Page 1 of 3 • • `03854 708-Inspector's Daily Reports 10/04/2016' FFTuesday, October 4, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To Weather: Time Temp Sky Time Temp Sky 7:30am 52 Ptly Cldy 3:00pm 57 Cloudy/Rain ID Contractor Representative/Title ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F _.—_.._.. — -..._.. -....._..._.__..... -------— --- - --..__......_.................--------..............__........_........_..................................................................................................................._...... E AGS Marla Dawson/TCS G C Cascade Utilities Rick Cancil/Supt I __..__.....----- - --- .. _....._._........... _..._._..�.— -- D J -----............... ----- -...._... ..__..........__...._... .........._............ _._....- ----- -- _..._ E K Work ctivity ID ,_� Description Location 1 .CrewEq ui A Contractor support All 1 M F250 P/U B Traffic control 3F, 1M F150 P/U C Adjusting utilities 5M 3 F450 U/T, Bobcat skid steer loader Traffic Control Was Traffic Control Req'd TodaV? Yes --__ Was WZTC per a proved TCP? Yes Comments: Material Delivery Inspection DAesc:ri tion Est. Q lJnit per ROM/`4PL? 5,4(6,4 10/4/2016 Insp ctor's Signature Date `evie11W1 (Signature) D to M ��- ;'� INSPECTOR'S DAILY REPORT . �� Cil � `i7 Duvall Ave NE Pavement Preservation Project � » o � Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material Descri tion LocationlOffset Conformance None Diary ime Discussion T30am AGS and Icon are on-site preparing_for the day. _ 8:30am Cascade is on-site, AGS is closin the southbound left center lane to provide a clear zone for Cascade. .............................................................................................................................................-............................_.....................g...............................................--._......_._..................._...._-........................--...................... ...-.....-...............-.........................................-..........-........._...........-..---........._............----- 9:30am Cascade is adjusting utilities at Sta. 44+00 +/-. 11:00am Cascade continues at Sta. 41+00 +/-. Both of the center lanes are closed at the work area. Cascade is finalizing the excavation at Sta. 41+00 +/- and have gone to acquire HMA for repairs. The cone on 1230pm the structure wasda as ed during prior work not related to this project and Cascade is making repairs 1_00pm_Cascade is placing HMA in excavations, rain has begun to fall. _OOpm Cascade has finished for the day and AGS is removing T/C from the road. 3:00P. rn Work has finished for the day. Tad/5�uX 10/4/2016 Inspector's Signature Date ® >Of 4k,�­ INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: Traffic control Location: Sta. 45+00 +/- ; Comment: AGS has taken the center lanes to allow Cascade to adjust i utilities. Subject: Utility Adjustment is Location: . ,�.. Sta. 47+00 Comment: Cascade is excavating for adjustments fi Subject: Utility Adjustment f Location: Sta. 43+00 +/- - _ Comment: " n.. Cascade is placing the HMA in the excavation. 59141 fi%iX 10/4/2016 Inspector's Signature Date