HomeMy WebLinkAboutInspector's Daily Reports - 10/4/2016 INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillllllllllllllllllllllllllllllllllllllll Page 1 of 3
• • `03854 708-Inspector's Daily Reports 10/04/2016'
FFTuesday, October 4, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To
Weather: Time Temp Sky Time Temp Sky
7:30am 52 Ptly Cldy 3:00pm 57 Cloudy/Rain
ID Contractor Representative/Title ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
_.—_.._.. — -..._.. -....._..._.__..... -------— --- - --..__......_.................--------..............__........_........_..................................................................................................................._......
E AGS Marla Dawson/TCS G
C Cascade Utilities Rick Cancil/Supt I
__..__.....----- - --- .. _....._._...........
_..._._..�.— --
D J
-----............... ----- -...._... ..__..........__...._... .........._............
_._....- ----- -- _..._
E K
Work
ctivity
ID ,_� Description Location 1 .CrewEq ui
A Contractor support All 1 M F250 P/U
B Traffic control 3F, 1M F150 P/U
C Adjusting utilities 5M 3 F450 U/T, Bobcat skid steer
loader
Traffic Control
Was Traffic Control Req'd TodaV? Yes --__ Was WZTC per a proved TCP? Yes
Comments:
Material Delivery
Inspection
DAesc:ri tion Est. Q lJnit per ROM/`4PL?
5,4(6,4 10/4/2016
Insp ctor's Signature Date
`evie11W1 (Signature) D to
M ��- ;'� INSPECTOR'S DAILY REPORT .
�� Cil � `i7 Duvall Ave NE Pavement Preservation Project
� » o �
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
ime Material Descri tion LocationlOffset Conformance
None
Diary
ime Discussion
T30am AGS and Icon are on-site preparing_for the day. _
8:30am Cascade is on-site, AGS is closin the southbound left center lane to provide a clear zone for Cascade.
.............................................................................................................................................-............................_.....................g...............................................--._......_._..................._...._-........................--...................... ...-.....-...............-.........................................-..........-........._...........-..---........._............-----
9:30am Cascade is adjusting utilities at Sta. 44+00 +/-.
11:00am Cascade continues at Sta. 41+00 +/-. Both of the center lanes are closed at the work area.
Cascade is finalizing the excavation at Sta. 41+00 +/- and have gone to acquire HMA for repairs. The cone on
1230pm the structure wasda as ed during prior work not related to this project and Cascade is making repairs
1_00pm_Cascade is placing HMA in excavations, rain has begun to fall.
_OOpm Cascade has finished for the day and AGS is removing T/C from the road.
3:00P.
rn Work has finished for the day.
Tad/5�uX 10/4/2016
Inspector's Signature Date
® >Of 4k,�
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
Subject:
Traffic control
Location:
Sta. 45+00 +/-
; Comment:
AGS has taken the center lanes
to allow Cascade to adjust
i utilities.
Subject:
Utility Adjustment
is
Location:
. ,�.. Sta. 47+00
Comment:
Cascade is excavating for
adjustments
fi Subject:
Utility Adjustment
f
Location:
Sta. 43+00 +/-
- _ Comment:
" n.. Cascade is placing the HMA in
the excavation.
59141 fi%iX 10/4/2016
Inspector's Signature Date