HomeMy WebLinkAboutInspector's Daily Reports - 10/3/2016 • c�� <�c INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
-Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIIIIIIIIIIIIII IIIIII IIIIIIIII III II IIIVIII I IIIIIII II I IIII IIIIII Page 1 of 4
`03854 708-Inspector's Daily Reports 10/03/2016'
... Monday, October 3, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:00pm
Weather: Time Temp Sky Time Temp Sky
7:30am 55 Cloudy 3:00pm 61 Ptly Cldy
ID Cohtractor `;,, Rejpros�n'ta#iveeCTInan
",° 1® Conteactcrr Represettative/i'itie
. ,
A Icon Materials Bill Johnson/ ForeF
..............................._..................................._................................................................................................_..............................._...................._.......................... ............... ........................................................................................................Marla Dawson/TG....................._._.........---......._......................-...__....................:.:................................._._..._......_..............__....-------..__...._..._............. ._.._.._.. ...._...__...._......._..._............_.............................._..........._._..._._................................._..._....._......................__.._................................_.._......_---scade Utilities Ken Mann/OwneI..................._.._..------ -.........._.........................I.............._.._..- ---.... .._.__..... --. ................_.._..---.._._.__.._...--........_..- ._._.............................D JE ---- - — — _...-K- -- -...._.._......................
Work Activity
16 7-: pescri' tion L,ocatton; - ;u 7 CF-: ". ;Equip
A Contractor Support All 1 M F250 P/U
B Traffic Control 317, IM F150 P/U
C Adjusting Utilities 6M Isuzu paint trk, F450 U/T, JD
skid steer loader
Traffic Control
Was Traffic Control_Req'dToday? Yes_ __ Was WZTC per approved TCP?
Comments:
Delivery
tion
Tad 15'wX 10/3/2016
Inspector's Signature Date
Ito1)(,
FViewed By (Signature) I D to
= INSPECTOR'S DAILY REPORT
-------° y Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 4
'Qn,site Testing
M Inj�ut�f
�fl ._ Material Descr! a n Ieoati�nl�fFet Gonforr»anee
None
Ime 0281MMeMMINt 'seussiora
7:OOamNW is placing the fog line in the northbound lanes, AGS is providing traffic control. _
800am Cascade is on-site preparing to Perform utility adjustments
..... —--._.._......_. --- ---..__...__...... --
GS has taken the southbound curb lane south of NE 6th to allow clear space for Cascade. NW is completing the
8:30am fqqline in the northbound lanes.
9:30am Cascade continues to raise utilities. NW has finished painting the fog lines_
10:30am Cascade continues at Sta. 15+OOR +/-.
11:30am Cascade is placing HMA in excavations and continuingwith adjustments at Sta. 13+00 +/-.
Cascade has finished excavating the utilities in the southbound curb lane, they continue to place HMA in the
12:30pm excavations at Sta. 13+OOL +/-.
1.30pm Cascade is placing HMA in the excavation at Sta. 10+97L +/-.
__:9Ppm Cascade has finished placing HMA and are loading equipment. AGS is removing T/ C.
2:45pm....__...-_GS is removin.g.._the T/C and are finishing for the._day._... . ............_......_......................................................---._._........._................._........_....._... --
3:00pm _Work has finished for the day.
Tdd f�ei/c 10/3/2016
Inspector's Signature Date
4 c:wof f INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 4
Subject:
R Paint Line
Location:
Sta. 17+50R +/-
f'
Comment:
NW Traffic is painting the fog line
Subject:
Utility Adjustment
Location:
Sta. 18+OOL +/-
.' .+ Comment:
Cascade is excavating For utility
adjustment.
Subject:
- - K Utility Adjustment
1.
51
- Location:
Sta. 18+OOL
_..., r-, Comment:
- _ Cascade is performing compaction
around the structure.
------------
mall 66A 10/3/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT.
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 4 of 4
Tcicl fi°ei�C 10/3/2016
Inspector's Signature Date