Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/29/2016 L� INSPECTOR'S DAILY REPORT } Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIII�IIIIIII�II�IIIIIIIIIIIIII�IIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIII�II�IIIIIIIIIII�II�IIIIIIIIIIIIIIIIIIII _ Page 1 of 3 Daily Information '03854 708-Inspector's Daily Reports 09/29/2016• Fhursday, September 29, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To _T Weather: Time Temp Sky Time Temp Sky F__1 7:30am 55 Cloudy ID Contractor Representative/Title ID Contractor, Representative/Title A Icon Materials Bill Johnson/ Foreman F B AGS Marla Dawson/TCS G C Green City Jesus Garnica/Foreman I ._..--...._.........._...._..._..................................._..._......_..-----........._.....................--. —..__....-- ----._ ....................- -- .._....._......--- ---...._.._.__._.._.._._...._.._........--------....—..-.._..........-.._..- D J .........................................._.................................._._......................................._...---............._..................._.............._............................_...._...._................._...__..._.-.............. ..................._................................................................................................................................................_......................................._................................................. E K "Work Activity ID- Description Location { 'Crew Equip A B C Restorations Traffic Control Was Traffic Control Re 'd Toda ? Yes Was WZTC era roved TCP? ._...........__....................................................................9...........__............._._Y._............_..........._..._..._.............._....................._...._.._........_.........._._..........._............................................._._...._..._.....__._P.....I.............P.p.__....--...._.-......_.._.-.__................._._...._._.._..._....._._....................._...................... Comments: Material Delivery Inspection Description ti, Est .Q Unit p_erpRO.M/QI?La Todd fiei/c 9/29/2016 Ins p tor's i nature Date 11116 Review By ( gnature) ate INSPECTOR'S DAILY REPOT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material Descri tion Location/Offset Conformance None M _ ime Discussion 7:30am Measured sod and finished paperwork from 9/28/16. 9:OOam Green Cit_is not on-site at this time. Off-site, I will return to monitor site. ..._......__.-........_.._................-........-......----..Y —. ......_-....._.............................................................-...-............-----.........-...__.._.. ---- -...-----............._...— ---- — I have taken photos of the property restorations that have been completed as requested by Flora. One of the sprinkler heads on the SW corner of NE 8th has been covered with the sod and will have to be exposed. The 12:OOpm sidewalk on the NE corner of NE 9th St appears to have white paint spattered on it. 12:30pm _here has been no activity on-site today.___________ Todd frei/c 9/29/2016 Inspector's Signature Date INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: Location: Comment: Subject: Location: Comment: Subject: Location: Comment: Tcicl Fiei/c 9/29/2016 Inspector's Signature Date