INSPECTOR'S DAILY REPORT
} Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIII�IIIIIII�II�IIIIIIIIIIIIII�IIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIII�II�IIIIIIIIIII�II�IIIIIIIIIIIIIIIIIIII _ Page 1 of 3
Daily Information '03854 708-Inspector's Daily Reports 09/29/2016• Fhursday, September 29,
2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To
_T
Weather: Time Temp Sky Time Temp Sky
F__1 7:30am 55 Cloudy
ID Contractor Representative/Title ID Contractor, Representative/Title
A Icon Materials Bill Johnson/ Foreman F
B AGS Marla Dawson/TCS G
C Green City Jesus Garnica/Foreman I
._..--...._.........._...._..._..................................._..._......_..-----........._.....................--. —..__....-- ----._ ....................- -- .._....._......--- ---...._.._.__._.._.._._...._.._........--------....—..-.._..........-.._..-
D J
.........................................._.................................._._......................................._...---............._..................._.............._............................_...._...._................._...__..._.-.............. ..................._................................................................................................................................................_......................................._.................................................
E K
"Work Activity
ID- Description Location { 'Crew
Equip
A
B
C Restorations
Traffic Control
Was Traffic Control Re 'd Toda ? Yes Was WZTC era roved TCP?
._...........__....................................................................9...........__............._._Y._............_..........._..._..._.............._....................._...._.._........_.........._._..........._............................................._._...._..._.....__._P.....I.............P.p.__....--...._.-......_.._.-.__................._._...._._.._..._....._._....................._......................
Comments:
Material Delivery
Inspection
Description ti, Est .Q Unit p_erpRO.M/QI?La
Todd fiei/c 9/29/2016
Ins p tor's i nature Date
11116
Review By ( gnature) ate
INSPECTOR'S DAILY REPOT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 3
Onsite Testing
In/Out of
ime Material Descri tion Location/Offset Conformance
None
M _
ime Discussion
7:30am Measured sod and finished paperwork from 9/28/16.
9:OOam Green Cit_is not on-site at this time. Off-site, I will return to monitor site.
..._......__.-........_.._................-........-......----..Y —. ......_-....._.............................................................-...-............-----.........-...__.._.. ---- -...-----............._...— ---- —
I have taken photos of the property restorations that have been completed as requested by Flora. One of the
sprinkler heads on the SW corner of NE 8th has been covered with the sod and will have to be exposed. The
12:OOpm sidewalk on the NE corner of NE 9th St appears to have white paint spattered on it.
12:30pm _here has been no activity on-site today.___________
Todd frei/c 9/29/2016
Inspector's Signature Date
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 3
Subject:
Location:
Comment:
Subject:
Location:
Comment:
Subject:
Location:
Comment:
Tcicl Fiei/c 9/29/2016
Inspector's Signature Date