HomeMy WebLinkAboutInspector's Daily Reports - 9/28/2016 c_it,.ilf INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) IIIIIIIIIIIII II I IIII IIIIIIIII I II IIIIIII III III IIII II VIII IIIIIII Page 1 of 3 •03854 708-Inspector's Daily Reports 09/28/2016• ... - Wednesday, September 28, �- 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To Weather: Time Temp Sky Time Temp Sky 7:30am 55 Cloudy 3:OOpm 65 Clear ID Contractor Representative/Title 'ID Contractor Representative/Title A Icon Materials Bill Johnson/ Foreman F ..............................._..._._...._._........_............^-----....................._....................__..._.._._............................................................._......._........_.............._....... .._.......I._......._......................_..__......_......_.........._._................._....__.._._....._......._...........-._..........._..................._...._.._......._.............................. B AGS Marla Dawson/TCS G -- - - — ................_._......................__.._..__...._.._..._g_._..---------�---"n------ --...-...._......_...___..._.._...._._..-------—-- ._....-----........._......................................_.._..-.-- C NW-Traffic Scott Hoeflin /Foreman I _._._...... -- -...__.._..— .._.....__..._........................_.........................._._.............._._...._....-...._.._..._.. ---- -._.._......._._...._.__..._._.._._...--......_......._._.__.._......._...._..._..--- D Green City Jesus Garnica/Foreman J ..................................------...............................---................................._.............................................................................................................................................................. ....._..............................._..__......................---...__._..............................................................................._.......................................................................-.................... E K Work Activity ID Descri tion Location Crew Equip A Temp marking removal All 2M F250 P/U JD310 B/H, F150 and contractor P/U supervision B Traffic control 3F, 1M F150 P/U C Channelization All 4M D Property restoration Intersections 3M F150 P/U, skid steer loader, Chev 3500 U/T Traffic Control Was Traffic Control Re 'd Toda ? Yes Was WZTC era roved TCP? Yes ....... ................................................._..........................................................P..............._.P.P..........................................................................................................................................................__... Comments: Material Delivery sua - - sual Inspection Descri wmm -. �i Est Qt ,. lJ,nit: perROM/QPL row/5164 9/28/2016 Wrnature Date o 4 /( R viewe ignature) bate r, INSPECTOR'S DAILY REPORT- Ir Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material Descri tion LocationlOffset Conformance None ime Discussion 7.30am Finished paperwork from 9/27/16 8:00am AGS is staging devices in preparation for the day___ 8:30am Green City is on-site at Sta. 34+60L+/-connecting the for the irrigation system__ ...................---_.. .................--_..._...................-...---._...._...._...................._._......... ...._............---.....-._..................... - G/C is moving topsoil from 8th to 9th; I have asked Bill to have AGS assist them as they are driving the skid steer on Duvall during this process. To this point no assistance is being provided. NW is performing layout for the merge lane from 7th to the southbound lanes. The wing on the ped ramp on the SW corner of NE 8th St. has been 9:30am broken; it appears to be related to the property restorations and the use of the skid steer on the walks. 10:30am NW is performing layout for the skip line from Sta. 40+00-12+90 +/- in the southbound lanes. NW continues to place RPMs at NE 41h St.; Approach line has been placed from the right turn median, the skip 11:30am line that was previously place will have to be removed. 12:30pm NW is placing the merge lane and arrow at 711,and have removed the double turn arrows. NW has finished placing channelization for the day. The paint truck has a mechanical issue and they are unable o place the fog lines today. G/C has relocated to the SE corner of 6th to continue property restorations. Icon is 1:30pm removing the inlet protection and debris from the site. ......_.......... ---- —. _...- ----- -- ---- - I have placed another call to Mark from WESGRO to have the water turned back on. I explained that we have placed sod and that it needs to be watered. G/C is finishing with the SE corner at 6th and loading excess topsoil from the road on the SW side at 6th into their truck to be removed from the site. Bill stated that there will be no 2:30pm activity on-site tomorrow, (9/29/16) but he isn't sure about Friday_ 3:OO.pm............_.-_Work has finished for the as -- -----................-.........--.....-........._......................................._..._......._.....----.._...............--.._..._.._........_.._.._..----...._ - .._....___....._.................__............_...... .............................................................................._............................................................._.._............._....................................................................._.._.....-._.._..............................._........-........................................................................._..............................---.-...._..........__....---.—..-......----.-.................................._...._....... Todd 15.4 9/28/2016 Inspector's Signature Date r iii 'if -� INSPECTOR'S DAILY( REPORT ®\ � .q Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 Subject: 1 Channelization Location. Sta. 33+25 +/- saw Comment: NW Traffic is placing RPMs Subject: `t Property Restoration t n Location: a Sta. 34+50L Comment: 4 Green City is placing sod in areas disturbed during construction. Subject: Channelization Location: Sta. 33+75 +/- ` 4 -. C t ommen . NW Traffic is placing thermoplastic arrow. r , Todd/i clXa 9/28/2016 Inspector's Signature Date