Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 9/27/2016 r ® „5I- INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) II IIIIII I II I II II II III I II II II II I I I I II I VIII III II Page 1 of 3 _ • _ • *03854 708-Inspector's Daily Reports 09/27/2016* ••. day, September 27, 120716 Inspector: Todd Freih Inspector's Shift Hrs: 7;30pm J--To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 51 Cloudy 3:OOpm Clear ID Contractor Representative/TInan ID Contractor, Representative/Title A Icon Materials Bill Johnson/ForeF -— --..._.................._......_..._...-- --- - ---. .._. .---.._.._......._...............--- ------------ - - - ._.....--._._..__........._._........__..Marla Dawson/TG--...__...... —..._..- -......- -- --...--- —-- —--.._...... _ ..............—C Green City Jesus Garnica/ForeI........................_.......- --- --------...._....---- —._....._...- - ----...---._....._............................................_----- ----- — ---.._._..------....................... DJ...................................................................................._..._.........._._........._.............-.-........_....__................................................................................... .... ............................_.__._..._.._........................................................................ __..._...__........_...---....._....__................._....................._.._..-....................... E K Work Activity ID Description Location Crew Equip A Placing signage and All2M F250 P/U JD310 backhoe removing temp markings B Traffic control 3F, 1M F150 P/U C Property restorations All areas adjacent to the new 3M F150 P/U, 2 Chev 3500 U/, ped rams Skid steer loader • Was Traffic Control Req'd Today? Yes _ Was WZTC�er approved TCP? Yes Comments: Material Delivery Visual Inspection' Descri tion .; Est.QamNwv . Unit per ROM/QPM? "'i roc(cl fi�ei/c 9/27/2016 In ctor's Signature Date Revi d By (Signature) Date <:i« „� r - INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite Testing In/Out of ime Material Descri tion Location/Offset Conformance None ............................................................................................................................................................................................................................._....-------............................................................................................_..._......__............................................._......._..............._.................. Diary irne Discussion 7:30am Icon is preparing to place signage at each end of the medians, AGS is Facing T/C. 8:30am Green City is onsite to continue with restorations. Green City is making repairs to the irrigation system at 7111, (3M, 1 skid steer loader) Icon is placing pole bases in 9:30am the median at Sta. 29+50-33+00 +/-. 10:30am Green City continues at 71h and Icon has relocated to the median at Sta. 18+50-22+00. I have met with Ken to review the channelization at 4th; NW has placed a skip line from Sta. 10+56-11+56between he two right lanes. This is supposed to be an approach line and will have to be removed. During this process, Bob Hanson would like the line to originate from the tip of the right turn island and merge with the skip line 11:30am requiring the removal of 3 skip lines_ 12:30pm Crews have taken break for lunch. Icon is placing the object markers in the medians and are preparing to continue removing temp markings. G/C is 1:00pm removing spoils from the site. _ 1:30pm G/C has relocated to NE 6th St. to continue restorations. GC continue to perform restorations at 6th. I have informed them that the corner at 9th could use some backfill when they have finished with the other restorations as a place to use some of the excess soil. G/C is also making 2:30 m adjustments to the irri ation s stem in the median at Sta. 29+50-33+00. ....................p..........................J........................................._............................_.._.....9_..............................y......_.................................._......_............................................................................................_.._...._......._............................._..._....... --._............................._......................................._....._.............._.........._._.............---.. G/C is finished for the day Traffic has requested that we extend the northbound turn lane at 8th an additional 10' to the face of the curb to 3:0Opm allow more room in the turn pocket_ ........................_............................................_........................._..........................__._................................................-_............................_...._.._......................................_...._.............._...._.._...._...._........... Todd fi�ei/c 9/27/2016 Inspector's Signature Date City,/fn INSPECTOR'S DAILY REPORT 6 f 1 °! Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 3 of 3 ., Subject: Property Restoration „ ��FJF' rchy5p` h 4 I j y Location: ri Sta. t Y 1 t.j t & 1 Comment: 6 I 6 y y # # Green City is repairing the irrigation - system Subject: r Permanent Signage ................._.._......... --......................._....._.........._—...__........................_..................---.._........_................ Location: Sta. 18+50-22+00 4 ....._....._.._.._................_........................_........_...................__.._........_....._............................................_...................... 11111111777 Comment: Icon is placing the object markers in OG7(urlflt the medians. Subject: Temp Markings -_.._.......---........................_-..........._.............. Location: =-= Sta. 24+00 +/- Comment: ' - - -- Icon is removing the temp markings ro&/5.4 9/27/2016 Inspector's Signature Date