HomeMy WebLinkAboutInspector's Daily Reports - 9/22/2016 1
INSPECTOR'S DAILY REPORT
Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Page 1 of 4
*03854 708-Inspector's Daily Reports 09/22/2016*
�- - • .•. hursday, September 22,
�2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:00pm
Weather: Time Temp Sky Time Temp Sky
7:30am 52 Clear 3:00pm 67 Clear
ID Contractor Representative/Title ID Contractor Representative/Title
A Icon Materials Bill Johnson/ Foreman F
---- ------.._._..---..........._..... ................................................................................................_..............__._.......__....__........__.._.._ -- -...._._...._......_.._._..._.............._.....................................................__.............................................._._..- -
B AGS Marla Dawson/TCS G
__..__...._.............._.........._._......._........--- —..._._._._...-._................._.._...._...._.-............................._..._--...---....._... .........._......................_...........--........._._._..__..__._.... --..................
--...---
C Caliber Concrete Jeff Segette/Foreman I
................. _......_......_._...._...._......._......._......__....._....__.....- -- _..........-........---........._...._.........._......_..---
D Cascade Utilities Ken Mann/Owner J
.......................... ..............._.........................................................................................................................................................................................................._...._..............................
E NW Traffic K
Work Activity
1D Description Location g Crew Equi
A Contractor supervision All 2M F250 P/U, JD310 backhoe
B Traffic Control All 3F, 2M F150 P/U
C Placing ped ramps Sta. 34+64,35.5L, 22+85, 4M 2 F450 U/T
37.95L, 22+86, 47.61L, 23+20,
47.67R
D Adjusting Utilities All 5M F450 U/T W/Comp, F450 D/T,
Bobcat skid steer loader
E Placing Channelization All 4M Dodge 2500 P/U. Isuzu U/T
Traffic Control
Was Traffic Control Req_d Today? Yes Was WZTC per approved TCP? Yes _ _ _
Comments:
Delivery
�. Visual Inspection
Descri tions,, : Es`t�Q_t, , Unit: aper ROM/QPL7,
rol/V 141--4 9/22/2016
Inspect USSi' ture Date
Reviewed B t (Si nature) Date
b
INSPECTOR'S DAILY REPORT
1i ' ' Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 2 of 4
Onsite Testing
In/Out of
ime Material Descri fiion Location/Offset Conformance
None
............. ... ....................................................................................._........---.._....................._....................._................................................................................................_
Diary
ime Discussion
7:30am __GS is staging T/C devices
8:OOam Caliber is attempting to make repairs to the ramp on the SE corner of 6tn
8:30am Caliber is preparing for Miles, Cascade is removing aspha t around structures.
............ .. ............ th' --- ...._....—-- —
Caliber is placing concrete in the ramp on the west side at 7 Cascade continues at Sta. 28+001- +/-, NW Traffic
9.30am is on-site to beginchannelization
10:OOam Caliber is a I in finish to the ram at 7th, Cascade continues and NW is applying layout for channelization:
........................._ ...._ .................................................P.P...y. 9._._..................._ .. .... P..... ..... ....................._..................._......................._........................ ................................... .........
Cascade continues at the intersection of 61h and Duvall. Caliber is preparing to place concrete in the ped ramps
11:OOam at the SW corner of 6th. 11:15am Miles is on-site with the final load of concrete for the ramps at 6th.
Caliber has finished placing concrete in the ramps at 61h, Cascade continues to remove asphalt around the
utilities. The risers and castings are being set into mortar and adjusted by expelling the excess from between the
components. (12:15) Street sweeping is being performed by COR crews and NW is placing RPMs in the
12:OOpm northbound lanes.
.1:OOpm Cascade isplacing HMA around the utility excavations_
--._..............._.............. - — -.._ _...._...---
Cascade is finishing with the HMA, Caliber is finished for the day. NW continues to perform layout for the
2:OOpm channelization. 2:10 m) Cascade s finished for the day.
..._.._........................_..........................__---._..-....--...-....__(..._........._._........._.....__._........_.......-_...._..........................................................................................._....
2:30pm I have given approval to open the lanes where adjustments have been made. —_
3:OOpm Work has finished for the day_
..............................................................................._.._.............................................................._...----......_................................_................._-.........
Tdd Fl,-14 9/22/2016
Inspector's Signature Date
J �Citv oel INSPECTOR'S DAILY REPORT
{ � t ti Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 3 of 4
Subject:
f=
Ped Ramps
I a
.r � n
Location:
SE corner of NE 6` St.
-.........................-..........-------- --- ----
�` Comment:
Caliber is making repairs to the ramp
and walk due to third party damages.
Subject:
Utility Adjustment
>E ,
- ,� - --- -. Location:
Southbound lanes at NE 6th St.
.........................
Comment:
Cascade is adjusting the water valves
Subject:
Channelization
- k- _.__._._._...._._....._._._..___._—__—....__ ____._...—....................____.._............
= y . Location:
Northbound lanes at Sta. 29+50R +/-
d ♦u __ _ °Yar^ �
«4 Comment.
�< NW Traffic is applying RPMs
Tdd F /� 9/22/2016
Inspector's Signature Date
r)Iwo �� INSPECTOR'S DAILY REPORT
C2 4 '`,` Duvall Ave NE Pavement Preservation Project
Contract#CAG-16-004, Fed Aid No: STPUL-1113(003)
Page 4 of 4
jdW f/°ei/a 9/22/2016
Inspector's Signature Date